Eric White, Director of Engineering

Slides:



Advertisements
Similar presentations
© 2007 AWS Truewind, LLC Wind Resource Assessment and Energy Production: From Pre-Construction to Post Construction July 2007 Eric White, Director of Engineering.
Advertisements

[ ] Preliminary Results of Full-Scale Monitoring of Hurricane Wind Speeds and Wind Loads on Residential Buildings Peter L. Datin Graduate Research Assistant.
1 An Overview of Small Wind Energy Today Shawn Shaw The Cadmus Group, Inc. Sierra Club Northeast Committee Fall Energy Conference 10/12-10/14/2007.
WIND ENERGY R&D TOPICS FOR THE COOPERATION BETWEEN EU AND LATIN AMERICAN ENTITIES. Emilien Simonot Technical secretariat Rio de Janeiro,
Wind: Energy measurement and analysis services in FMI
Chuck Kutscher National Renewable Energy Laboratory Geothermal Power Potential Energy and Climate Mini-Workshop November 3, 2008.
Introduction to modelling extremes
INVESTIGATION OF LOCAL STATISTICAL CHARACTERISTICS OF TURBULENT WIND FLOW IN ATMOSPHERE BOUNDARY LAYER WITH OBSTACLES Yuriy Nekrasov, Sergey Turbin.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
WIND INSIGHT a wind power forecasting tool for power system security management Dr Nicholas Cutler 21 March 2013
Jim Thompson, Eric Anderson, & Rob Austin NC State University, Department of Soil Science Jim Thompson, Eric Anderson, & Rob Austin NC State University,
AgroCLIM software tool for effective calculation of agrometeorological indices ADAGIO & COST 734 Miroslav Trnka, Petr Hlavinka, Jan Balek, Josef Eitzinger,
Capacity Planning For Products and Services
Layout Optimisation Brings Step Change in Wind Farm Yield Dr Andrej Horvat, Intelligent Fluid Solutions Dr Althea de Souza, dezineforce Come and visit.
Wind Resource Assessment
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Coupled NMM-CALMET Meteorology Development for the CALPUFF Air Dispersion Modelling in Complex Terrain and Shoreline Settings Presented at: European Geoscience.
NovEnergia II Technical Bureau - Sep08 THE OPPORTUNITIES OF HUNGARIAN WIND ENERGY Álvaro Rodrigues September 2008.
Difficulties Integrating Wind Generation Into Urban Energy Load Russell Bigley Shane Motley Keith Parks.
CEREA – Group « Meteorological Measurements » 15 September METEOROLOGICAL MEASUREMENTS IN THE ATMOSPHERIC BOUNDARY LAYER E. Dupont – D. Demengel.
1 Integrating Wind into the Transmission Grid Michael C Brower, PhD AWS Truewind LLC Albany, New York
1 Modelled Meteorology - Applicability to Well-test Flaring Assessments Environment and Energy Division Alex Schutte Science & Community Environmental.
Modeling, Analysis, and Risk Assessment Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007 Topeka, Kansas Grant Brohm –
fluidyn – PANAIR Fluidyn-PANAIR
The Wind Energy Center at UMASS University of Massachusetts Patrick Quinlan Associate Director UMass Wind Energy Center Amherst, Massachusetts Site Considerations:
COLD CLIMATE RESOURCE ASSESSMENT: LESSONS LEARNED PHILIPPE C. PONTBRIAND RES-Canada Technical Lead Collaborators: Eric Muszynski, Rory Curtis 2 nd NOVEMBER.
Power Generation from Renewable Energy Sources Fall 2013 Instructor: Xiaodong Chu : Office Tel.:
Uncertainty in Wind Energy
Cao Xiao September, 2013 Wind Power Forecasting. 2 C urrent situation of forecast technology Key technology of forecast Forecast principle of wind power.
SODAR: Uses and Acceptance Laura Tabor Wind Engineering Intern EAPC Wind Energy Services August 7, 2009.
Wind Power Analysis Using Non-Standard Statistical Models
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Tower SystemsJanuary AMS Short Course on Instrumentation 1 Installation and Use of Meteorological Tower Systems Melanie A. Wetzel Desert Research.
Offshore wind resource assessment Colin Morgan and Graham Gow Garrad Hassan and Partners
UNCERTAINTY The Classical Approach ALAN DERRICK SENIOR TECHNICAL MANAGER September
1 IRENA – M ARTINIQUE C ONFERENCE ON ISLAND ENERGY TRANSITIONS Workshop C : Wind resources and technologies for islands W IND MEASUREMENTS ON I SLANDS.
Improving WAsP predictions in (too) complex terrain
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Wolf-Gerrit Früh Christina Skittides With support from SgurrEnergy Preliminary assessment of wind climate fluctuations and use of Dynamical Systems Theory.
ECE 7800: Renewable Energy Systems
Impact Of Surface State Analysis On Estimates Of Long Term Variability Of A Wind Resource Dr. Jim McCaa
Article #3 New York Windmills
AWS Truewind Methodology Timeline of AWS Truewind participation Key points Wind resource modeling Estimation of plant output Validation and adjustment.
Wind power Part 2: Resource Assesment San Jose State University FX Rongère February 2009.
Quality control of daily data on example of Central European series of air temperature, relative humidity and precipitation P. Štěpánek (1), P. Zahradníček.
A METHODOLOGY FOR ESTIMATING WIND FARM PRODUCTION THROUGH CFD CODES. DESCRIPTION AND VALIDATION Daniel Cabezón, Ignacio Martí CENER, National Renewable.
Use, duplication or disclosure of this document or any of the information contained herein is subject to the restrictions on the title page of this document.
Modern Era Retrospective-analysis for Research and Applications: Introduction to NASA’s Modern Era Retrospective-analysis for Research and Applications:
Estimating the Optimal Location of a New Wind Farm based on Geospatial Information System Data Dec Chungwook Sim.
Ice Cover in New York City Drinking Water Reservoirs: Modeling Simulations and Observations NIHAR R. SAMAL, Institute for Sustainable Cities, City University.
Wind Turbine Design Methods
Environmental Business Council December 17, 2009
Experience of Modelling Forested Complex Terrain Peter Stuart, Ian Hunter & Nicola Atkinson 30 th October 2009.
Presented at Environmental Finance Workshop Series University of Toronto October 12, 2005 DEALING WITH UNCERTAINTY: Wind Resource Assessment D. C. McKay.
Cao Xiao September, 2013 Wind Power Forecasting Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect.
Kris Shrestha James Belanger Judith Curry Jake Mittelman Phillippe Beaucage Jeff Freedman John Zack Medium Range Wind Power Forecasts for Texas.
Engineering, Policy, Finance
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
IEC FDIS 2016 Consensus Analysis Project
TERRAINS Terrain, or land relief, is the vertical and horizontal dimension of land surface. Terrain is used as a general term in physical geography, referring.
Power curve loss adjustments at AWS Truepower: a 2016 update
What is in our head…. Spatial Modeling Performance in Complex Terrain Scott Eichelberger, Vaisala.
Data management: 10 minute data, 8760 hours Data Q/C, error checking
Observing Climate Variability and Change
Engineering, Policy, Finance
Stefano Grassi WindEurope Summit
Reducing Uncertainty of Near-shore wind resource Estimates (RUNE) using wind lidars and mesoscale models EMS 2015, Sofia, Bulgaria, Coastal meteorology.
Layout Optimisation Brings Step Change in Wind Farm Yield
Micrositing for Wind Turbines
Presentation transcript:

Eric White, Director of Engineering Wind Resource Assessment and Energy Production: From Pre-Construction to Post Construction May 2008 Eric White, Director of Engineering AWS Truewind, LLC 463 New Karner Road Albany, NY 12205 ewhite@awstruewind.com © 2007 AWS Truewind, LLC

AWS Truewind - Overview Industry Leader & Consultant for 20,000+ MW Full spectrum of wind farm development and evaluation services Wind Assessment, Mapping, Engineering, Performance Assessment, Forecasting In business 25 years Project roles in over 50 countries Albany, New York based; 55+ employees © 2007 AWS Truewind, LLC

Topics Wind resource assessment process Energy production modeling Wind Farms Measurements Siting Wind resource assessment process Energy production modeling Effects on wind farm siting and design Operational plants and actual yields © 2007 AWS Truewind, LLC

Establishing Project Viability Wind Resources Determine: Project Location & Size Tower Height Turbine Selection & Layout Energy Production annual, seasonal on- & off-peak Cost of Energy/Cash Flow Warranty Terms Size of Emissions Credits The wind energy industry is more demanding of wind speed accuracy than any other industry. © 2007 AWS Truewind, LLC

Power in the Wind (Watts) = 1/2 x air density x swept rotor area x (wind speed)3  A V3 Density = P/(RxT) P - pressure (Pa) R - specific gas constant (287 J/kgK) T - air temperature (K) Area =  r2 Instantaneous Speed (not mean speed) kg/m3 m2 m/s Knowledge of local wind speed is critical to evaluating the available power © 2007 AWS Truewind, LLC

Wind Shear The change in horizontal wind speed with height A function of wind speed, surface roughness (may vary with wind direction), and atmospheric stability (changes from day to night) Wind shear exponents are higher at low wind speeds, above rough surfaces, and during stable conditions Typical exponent () values: .10 - .15: water/beach .15 - .25: gently rolling farmland .25 - .40+: forests/mountains Wind Shear Profile V2= 7.7 m/s V1 = 7.0 m/s Z2= 80 m Z1= 50 m Wind speed, and available power, generally increase significantly with height V2 = V1(Z2/Z1)  = Log10 [V2/V1] Log10 [Z2/Z1] © 2007 AWS Truewind, LLC

Wind Resource Assessment Handbook Fundamentals for Conducting a Successful Monitoring Program Prepared for: National Renewable Energy Laboratory 1617 Cole Boulevard Golden, CO 80401 NREL Subcontract No. TAT-5-15283-01 Prepared By: AWS Scientific, Inc. 255 Fuller Road Albany, NY 12203 April 1997 Published by NREL www.nrel.gov/docs/legosti/fy97/22223.pdf Peer reviewed Technical & comprehensive Topics include: Siting tools Measurement instrumentation Installation Operation & maintenance Data collection & handling Data validation & reporting Costs & labor requirements © 2007 AWS Truewind, LLC

Summary of Wind Resource Assessment Process Identify Attractive Candidate Sites Collect >1 yr On Site Wind Data Using Tall Towers Adjust Data for Height and for Long-Term Climatic Conditions Use Model to Extrapolate Measurements to All Proposed Wind Turbine Locations Predict Energy Output From Turbines Quantify Uncertainties © 2007 AWS Truewind, LLC

Siting Main Objective: Identify viable wind project sites Main Attributes: Adequate winds Generally > 7 m/s @ hub height Access to transmission Permit approval reasonably attainable Sufficient land area for target project size 30 – 50 acres per MW for arrays 8 – 12 MW per mile for single row on ridgeline © 2007 AWS Truewind, LLC

Sources of Wind Resource Info Existing Data (surface & upper air) usually not where needed use limited to general impressions potentially misleading Modeling/Mapping integrates wind data with terrain, surface roughness & other features New Measurements site specific using towers & other measurement systems © 2007 AWS Truewind, LLC

Alternative Sources of Wind Speed Data Visual Indications and local knowledge Beaufort Scale Wind Speed Estimated by Visual Effects on Land Features Accuracy : 15% Without Height Adjustment National Weather Service (NWS) Measurements of Wind Speeds for Weather Conditions Accuracy : +/- 1 m/s up to 10 m/s 10% above 10 m/s Environmental Protection Agency Accuracy: 0.25 m/s < 5 m/s 5% > 2 m/s not to exceed 2.5 m/s World Meteorological Organization Accuracy: 0.5 m/s < 5 m/s 10% > 5 m/s Wind Industry expects 1-2% speed measurement accuracy! Alternative sources and techniques have large uncertainty; the wind industry is more demanding of accuracy than traditional users © 2008 AWS Truewind, LLC © 2007 AWS Truewind, LLC 11

Old and new wind maps of the Dakotas Modern Wind Maps Utilize mesoscale numerical weather models High spatial resolution (100-200 m grid = 3-10 acre squares) Simulate land/sea breezes, low level jets, channeling Give wind speed estimates at multiple heights Extensively validated Std error typically 4-7% GIS compatible Reduce development risks Old and new wind maps of the Dakotas Source: NREL © 2007 AWS Truewind, LLC

Wind Mapping © 2007 AWS Truewind, LLC

Typical Monitoring Tower Heights up to 60 m Tubular pole supported by guy wires Installed in ~ 2 days without foundation using 4-5 people Solar powered; cellular data communications © 2007 AWS Truewind, LLC

How and What To Measure Anemometers, Vanes, Data Loggers, Masts Measured Parameters wind speed, direction, temperature 1-3 second sampling; 10-min or hourly recording Derived Parameters wind shear, turbulence intensity, air density Multiple measurement heights best to measure at hub height can use shorter masts by using wind shear derived from two other heights to extrapolate speeds to hub height Multiple tower locations, especially in complex terrain Specialty measurements of growing importance Sodar, vertical velocity & turbulence in complex terrain © 2007 AWS Truewind, LLC

Predicting Long-Term Wind Conditions From Short-Term Measurements Measure - Correlate - Predict Technique Measure one year of data on-site using a tall tower Correlate with one or more regional climate reference stations Need high r2 Reference station must have long-term stability Upper-air rawinsonde data may be better than other sources for correlation purposes Predict long-term (7+ yrs) wind characteristics at project site Airport A Regression y = 1.0501x + 0.4507 R 2 = 0.8763 Airport B Regression y = 1.4962x + 0.4504 = 0.875 Airport C Regression y = 1.7278x + 0.7035 = 0.8801 5 10 15 20 25 Reference Station Mean Wind Speed (m/s) Project Site 60 m Wind Speed (m/s) Airport A Airport B Airport C This plot compares a site’s hourly data with three regional airport stations. A multiple regression resulted in an r2 of 0.92. © 2007 AWS Truewind, LLC

Conceptual Project Estimated Net Capacity Factor ~ 29.0 – 31.5% Software tools (WindFarmer, WindFarm, WindPro) are available to optimize the location and performance of wind turbines, once the wind resource grid within a project area is defined. Estimated Net Capacity Factor ~ 29.0 – 31.5% © 2007 AWS Truewind, LLC

Elements of Energy Production Analysis & Reporting Site/Instrument Description Wind Data Summary Long-term Speed Projection Turbine Power Curve Turbine Number & Layout Gross Energy Production Loss Estimates Uncertainty Analysis Net Annual Energy Production (P50, P75, P90, etc.) © 2007 AWS Truewind, LLC

Influences on Uncertainty (Typical Range of Impact on Lifetime Energy Production) Measured Speed Shear Climate Resource Model Plant Losses (2-4%) Sensor Types, Calibration & Redundancy, Ice-Free, Exposure on Mast, # of Masts (1-3%) Height of Masts, Multiple Data Heights, Sodar, Terrain & Land Cover Variability (4-9%) Measurement Duration, Period of Record @ Reference Station, Quality of Correlation (5-10%) Microscale Model Type, Project Size, Terrain Complexity, # of Masts, Grid Res. (1-3%) Turbine Spacing (wakes), Blade Icing & Soiling, Cold Temp Shutdown, High Wind Hysteresis, etc. © 2007 AWS Truewind, LLC

So What’s a P90? For a function with an assumed normal probability distribution, P50 = mean of the distribution P90 = the point where 90% of the results are expected to be above Both are important © 2007 AWS Truewind, LLC

Operational Plant Performance: Understanding operational wind farm performance can be non-trivial Typical Plant Operational Data Project Availability Plant Production Need to separate wind variability from other effects to understand real long term expectations © 2007 AWS Truewind, LLC

Characteristics of an Operational Assessment Information from actual operations improves estimate Many sources of uncertainty can be removed (measured speed, shear, resource model, plant losses, actual turbine performance) Monthly farm level numbers help smooth and linearize results (Power vs. wind speed) Climatological adjustment with reference station data to provide long term trends Can focus directly on the bottom line data (Revenue Meter) Typical Wind Farm Power Curve (After correcting for Availability) 100% Avail Plant Output Nacelle Average Wind Speed © 2007 AWS Truewind, LLC

Case Comparison - Reference Wind 12 month Rolling Average Wind Speed Nacelle Average Trends are similar Annualized Wind Speed shows low period in 04 and 05; should expect low production Wind Speed (m/s) Ref Station 2 Ref Station 1 © 2007 AWS Truewind, LLC Month

Case Comparison – Operational Performance © 2007 AWS Truewind, LLC

A Few Words on Plant Underperformance - Understanding the Issue Plant underperformance vs preconstruction estimates is a real and significant issue for the industry Many plants averaging ~ 8 to 10% below projections Contributions from numerous sources Can be hard to pinpoint and evaluate Wind variability complicates the analysis Many aspects can be addressed Need to peel back the onion to understand the real issues involved - Studies in process © 2008 AWS Truewind Confidential © 2007 AWS Truewind, LLC

Early Findings – Some Key Contributors Regional Climate and Variability Resource Assessment Campaign Biases Actual Plant Availability As-Built Plant Characteristics Changes from Plan Sub-Optimal Operation Many contributors – across the project development cycle © 2008 AWS Truewind Confidential © 2007 AWS Truewind, LLC

Summary Wind conditions are site-specific and variable, but predictable over the long term. Accuracy is important. Wind resource assessment programs must be designed to maximize accuracy. Combination of measurement and modeling techniques can give projections close to those experienced in actual operations. Operational plant evaluations can be used to improve projections © 2007 AWS Truewind, LLC