The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.

Slides:



Advertisements
Similar presentations
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Advertisements

The students in the Freshman Academy & the Green School Initiative are proud to present the following on- line tutorial about biodiesel production at HPHS.
The pumps should be tightened about once a month. If a new pump is installed, the pump should be initially tightened and then re-torqued one week later.
Growing Fish in a Recirculating System: Advanced Teacher’s Workshop An Inexpensive Recirculating System Blan Page & PJ Waters.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
How to Make Crystal Ornaments By: Merishel Collins.
Tank and Inline Chiller Setup. Equipment list  Bleach  Aquarium (min 10 Gal)  Chiller (there are several types)  Insulated box or some kind of tank.
Diesel Generator Reliability: Lessons Learned from Storms
Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Report on E-165 Steve Schnetzer MCC Meeting June 28.
M. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Magnets Dry Run ISIS Scheduling Meeting Latest news on Target Ready to run ? Summary of: Magnets.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Nov
AccuMax Multi-Point Injection Mechanics
CB Warm-up Get the sheet from the front table and answer these questions. rbasics/14http://
EVAPORATIVE EMISSION CONTROL SYSTEMS
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
2.00 Understand Computer Fundamentals. Unit Objective: 2.02.
2.00 Understand Computer Fundamentals. Unit Objective: 2.02.
2.00 Understand Computer Fundamentals
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Keep all food and drinks away from computer and equipment Liquid may spill and cause an electrical shock or the computer not to operate properly.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
HD target.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
06/04/2012Steve Hahn — AEM Meeting1 MINOS Status Report Rack cleanup –All racks vacuumed –All filters cleaned –Wiener power supply/chassis checked for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Online Reconstruction 1M.Ellis - CM th October 2008.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Installation of the T600 at Fermilab CSN2, September 22,
Algorithms. Teacher Lead Activity What is an algorithm? Homework Recap!
By: Eric Seabron. B-Field Sensors: Used for magnetic field mapping. Tube Gases: No leaks, 93% Argon/ 7% CO2 at 3 bars. MDC Temp. Sensors: Accounts for.
SATMathVideos.Net Water is pumped into an tank at 20 gallons per minute. The tank has a length of 10 feet and a width of 5 feet. If the tank starts empty,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
Brook Trout Care. Basic Daily Care Provide a “stress free’ environmentProvide a “stress free’ environment –Keep all insulation on except the front and.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
14 Refrigerant Recovery, Recycling, and Recharging.
LST Module Installation
COMPUTER SAFETY AND CARE
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012

Roof Put on Detector xx 2 Rock Catcher Put on Detector

Optical Cable Covers Covers prevent people from touching optical cables –Sometimes cables aren’t properly latched in & come out when touched We thank the PPD Mechanical Group for the constructing the rock catcher and cable covers. 3

Tasks needed for Rock Catcher The Vesda System (smoke detection) is installed and the readout is finished. Temperature rate of rise sensors are installed and the readout is finished. The 4 cameras used to look at the detectors are ready to be installed –3 cameras look at detector & 1 looks at electronics rack –Should be installed this week –The output of the cameras will go to a WEB page The connection of the rack protection system in the LI rack is ready to be connected to the FIRUS system We thank Linda Bagby for coordinating this effort 4

Tasks The tilt monitors should be installed next week, –4 will be installed on the phototubes on the corners of the detector. –This task should be finished this week 5

Measuring Dust Levels in MINOS Hall ES&H brought 4 dust monitors to MINOS Hall. –Check to sure dust levels during excavation does not cause a problem –These monitor have a pump which deposits the dust on a filter and the filter is sent for analysis.The monitors were left in the hall for 8 hours –3 total dust monitors Top of detector (PMTs), MINERvA DAQ rack, North end of MINOS Hall –1 for respirable dust - dust particles < 2.5 microns MINOS DAQ computers Results are under the reporting of limit of 50  g –Dust level < 0.05 mg/m^3 –ES&H says no personal problem, but we expected no problem. Measure dust levels during excavation. Thank ES&H for this measurement 6

Water Target Water target drained –If it has a certain life time, we do not was to use it when there is no beam But before drained, we had Alignment & Metrology measure what they could –Measure the width of the target at the widest extent –Measure width from the widest extend to the bottom of the target at 5 points –These results will be an input to the calculation of the target shape 7

Put gal of water in the target on 11/18 –The 180 gal is close to the calculated volume of the target –An additional 12 gallons added as the target expanded Removed gal of water –We think the flow meter for removing the water was not calibrated correctly John Voirin suggested we refill the target and weight the 55 gallon drums before and after they have been emptied. –Scale has calibrated with 500 lb weight –Scheduled to fill target tomorrow 8 Where did the 40 gallons go ?

Detector The detector HV was turned off on May 31, after the beam run was finished HV is still off and will leave it off until the tasks on the detector are finished, probably this week. –The detector is powered up –A careful light leak checking will be done 9