Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Senior Thesis 2007 Construction Management Option.

Slides:



Advertisements
Similar presentations
Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Advertisements

Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
Wilkes-Barre/Scranton International Airport Avoca, PA Adam G. Weis Construction Management Option 2006 Senior Thesis Presentation.
Kyle Goodyear BAE in Construction Management Pennsylvania State University Senior Thesis Presentation April 12, 2010.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
Construction Project Management: Technology driven answers for schedule and budget savings.
A QUARIUM H ILTON G ARDEN I NN. CRITICAL ISSUE RESEARCH For this I would like to take the BIM model Holder Construction Company has developed for the.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
601 New Jersey Avenue Alternative Materials Amber House Structural 601 New Jersey Avenue Washington, D.C. Alternative Construction Materials Amber L. House.
George Read Hall The University of Delaware
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
Fairfax High School Renovation and Addition Washington, DC M ICHAEL F UNK Construction Management.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
Mathew Nirenberg AE Senior Thesis Structural Option.
Architectural Engineering Construction Management Senior Thesis April 11 th, 2011 Consultant: Dr. Riley Architectural Engineering Spring 2011 – Senior.
Greg Blatt Penn State Architectural Engineering Construction Management April 12, 2004.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
DEREK BAUER CONSTRUCTION MANAGEMENT AE SENIOR THESIS 2008 PENN STATE UNIVERSITY AE SENIOR THESIS PRESENTATION APRIL 15, 2008 OFFICE/RETAIL BUILDING WASHINGTON,
Christopher Simmons l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Ali M. Memari Baltimore Hilton Convention Center Baltimore.
Government Office Center Mid-Atlantic U.S. Penn State AE Senior Thesis Project Alexander Ward | Construction Management James Faust | CM Advisor.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland Science Technology.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
The New Science Building Texas A&M International University Laredo, TX Nicole Griffith.
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Thesis Research Proposal Aimee Bashore Franklin & Marshall College Row Lancaster, PA.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
Taylor Hall George Mason University Fairfax, VA Advisor: Ed Gannon Introduction Prevention through Design Façade Re-design for PtD Stick-Built vs. Infinity.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
DESIGN TOOLS UPDATE.
Mountain State Blue Cross Blue Shield Headquarters
Redifer Commons Addition & Renovation Project
Doctors Community Hospital Expansion
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Construction 101 Start to Finish
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Wellington Condominiums Project
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
DBIA Manual of Practice
RiverView Condominiums II Chicago, IL
Presentation transcript:

Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Senior Thesis 2007 Construction Management Option

Presentation Outline Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 – Implementation of BIM on a Construction Project Conclusions Q & A Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Project Overview GMP Pricing $45.2 Million Building Size 458,809 SF Construction Duration 16 months Project Funcion Hotel and Parking Deck Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Project Overview Hotel –202,464 SF –14 Stories –242 Rooms Hotel Features –14,200 SF or Retail Area on Lower Level –8,800 SF Sky Bar w/ Mezzanine on Level 14 –Restaurant on Level 2 and Level 4 –Outdoor Pool and Spa and Indoor Pool on Level 7 Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Project Overview Parking Deck –256, 345 SF –12 Levels –670 Parking Spaces Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Project Overview Very Congested Site Existing 4 Story Parking Structure Must Be Demolished Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Project Overview Project Team Owner Legacy Property Group Construction Manager Holder Construction Company Architect Stevens & Wilkinson /Stang & Newdow Structural Engineer KSI Structural Engineers Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Project Overview Risk w/ GMP Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Foundation System Analysis Background Existing Parking Structure –41 Caissons ( in.) –Designed to carry 80 kips/sf –Currently Carrying 35 kips/sf –New construction would increase to 90 kips/sf –Proposed 88 new caissons Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Foundation System Analysis Problem Delays In Construction –Delayed Approx. 40 Days –Hitting Existing Caissons –Sloped Rock –Varying Sizes of Caissons –Addition Drilling Rigs Further Congested Site Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Foundation System Analysis Proposal Construct Mat Foundation System –Avoid Delays in Construction –Allow Owner/Client to Take Over Building Sooner –Owner/Client Generate Revenue Sooner Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Foundation System Analysis Analysis Building Loads –Total Live Load = 25,401.5 kips Structural Notes –Total Dead Load = 152,500 kips Building Self Weight Structural Notes –Factored Load of 177,902 kips 1.7 and 1.4 – ACI Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Foundation System Analysis Analysis Critical Column Load –Calculations In Appendix D –5.94 kips/SF based on Load –Largest Span contained 5702 SF –Gave thickness of 75 Inches –No. 11 Rebar spaced 6” o.c. Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Foundation System Analysis Analysis Soil Bearing Capacity –Soil Bearing Capacity = 5.65 kips/sf N60 = 20 –Load on Soil = kips/sf Building Load + Mat Slab Weight –Factor of Safety = 1.38 Existing Caissons Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Foundation System Analysis Schedule Impact Over 2 Month Schedule Gain Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Foundation System Analysis Owner/Client Revenue –Previous Parking = $50K to $100K –Assumed 75 of the 242 Rooms $125 Per Night Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Foundation System Analysis Cost Comparison –Current System = $1,307,960 –New System = $2,347,037 Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Foundation System Analysis Conclusion – The benefits of the proposed mat slab can clearly be seen in the scheduling impacts of the job. – The cost of the system does appear to be initially higher than the caisson system. – With change orders, added general conditions cost, and revenue generated the proposed mat slab does seem like a good choice to keep both the owner and the owners clients happy. Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Façade Investigation Background and Problem South Side Entrance –2000 SF Basalt Stone –Produced In Europe –Long Lead Item –Arrives After Façade is Complete Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Façade Investigation Proposal Use Paneling System Called StoneLite Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Façade Investigation Proposal Use Paneling System Called StoneLite Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Façade Investigation U-Value Comparison –Existing System = BTU/Sq.Ft. –Proposed System = BTU/Sq.Ft. w/R21 = Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Façade Investigation Construction Impacts Site/Schedule Impacts –Facade Completed at Once Clears Site of Scaffolding Remobilize Masons –Constructed in 1 Day Structural Impacts –3.3 lbs/SF Vs. 20lbs/SF Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Façade Investigation Construction Impacts Cost Impacts –Current System $297,263 –Proposed System $96,000 Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Façade Investigation Conclusion – The proposed StoneLite has benefits in every category examined. – The StoneLite system would shorten up the façade schedule allowing for the site to be cleared and less congested. – The StoneLite system would be very comparable to the stone system mechanically and fights water penetrations better. – This system is also much lighter and would cost much less then the basalt stone system called for on the project. Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM Creating The Model –Once at 75% and once at 100% CD’s –Created by Holder Construction –3 Models Created and Brought Together Structural, Mechanical, Composite Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM Processes to Kick Start Use of BIM –BEAMUP Educate Project Team on BIM –BIM Assessment What to Model? To What Detail? –BIM Cost Projection What Will Model Cost –368 MH – 75%, 298 MH – 100%, 320MH – MEP Coordination Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM Processes to Kick Start Use of BIM - Confidential Material Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM Sharing Of Model –Confidential Material Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM –Confidential Material Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM Sharing Of Model –Confidential Material Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM Uses Of Model Business Development Pursuit Visualization and Understanding Enhanced Design Assistance Reduced Decision Latency and Cycle Time Preconstruction Trades Scope Verification Extracting Quantities 4D Phasing and Scheduling Animations Workflow Sequencing 3 Week Look-Ahead Schedules Weekly Jobsite Meetings Site Logistics Collision Detection Constructability Review Trade Contractor Coordination Code Official Review Owner Sales, Presentation, Marketing & Fundraising Digital As-Builts Field Engineering Layout Surveying Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM Collision Detection –NavisWorks Clash Detection 55 Pre-RFI Collisions Detected Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM Collision Detection –Confidential Material Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM Visualization –Formwork Trade Contractor Confusion w/ Formwork Between Hotel/Deck Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM Acceptance of BIM –The architect S&W/S&N plans on using BIM for all its new projects in 2007 –The structural engineer (KSI) plans on using BIM on projects. –The owner has used the BIM for sales, presentations, marketing, and fundraising Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM Improvements/ Suggestions –Earlier Development of Model Integrate into Preconstruction Process –Develop by Architect and Structural –Learning Curve 25%-30% –MEP Design Model off Shop Drawings –Team Approach in Design Stages –Development of Cost Savings Database Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Implementation Of BIM Conclusions –Implementation very Successful –Benefits Highly Outweigh Cost –Still Room For Improvement –Valuable Tool Should be used on all big Construction Projects Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Conclusions Foundation System Analysis –Effectively Speeds Construction –Savings and Revenue vs. Cost Façade Investigation –Cost Effective Replacement to Stone System –Much Shorter Lead Time Implementation Of BIM –Implementation Very Successful –Room to Streamline Implementation Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Acknowledgments Holder Construction Company Jason Fetterman Paul Hedgepath Jessica Potkovick Chad Smith Carey Steckler Stone Panels, Inc. Lavern Chamness The Pennsylvania State University Robert J. Holland Dr. John Messner Dr. M. Kevin Parfait Dr. David Riley Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006

Project Overview Analysis 1 – Foundation System Analysis Analysis 2 – Façade Investigation Analysis 3 - Implementation of BIM on a Construction Project Conclusions Q & A Questions/ Suggestions? Aquarium Hilton Garden Inn Atlanta, Georgia John Dixon Construction Management Senior Thesis 2006