EASTERN PLAINS TRANSMISSION PROJECT Tri-State Generation & Transmission and Western Area Power Administration.

Slides:



Advertisements
Similar presentations
1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.
Advertisements

Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
1 SCG/TEPPC November 18-19, CCPG Primary Transmission Participants.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
NARUC The 21 st Century Grid 1 Energy Consumption Ancillary Services Traditional Power Generation Solar Generation Commercial and Industrial Transmission.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
Overview of the U.S. Electrical System & the Bonneville Power Administration (BPA)
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
Electricity and Magnetism Mr D. Patterson. Outcomes explain why electrical energy is transmitted as AC at very high voltages, and describe and explain.
WELCOME PUC Rule 3627 Stakeholder Participation. Who we are: Xcel Energy Staff Introductions Public Service Company of Colorado.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
Information about 2009 Summer Workshop. Progress Energy operates power plants in ______________. A.only western North Carolina B.North Carolina C.North.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
Midwest Energy, Inc. Transmission Planning and Expansion
1 Project Overview n Review current and future problems n Develop Solutions that will provide the customer with high quality reliable power n Test the.
AETS/March 2006 Dominica Geothermal Project and Interconnection with Neighbouring Islands Assessment and Cost-Benefit Analysis March 2006 A E T S Application.
Regulatory Priorities of the Colorado Public Utilities Commission Black Hills Corporation Analysts’ Meeting Remarks of Ron Binz, Chairman Colorado Public.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
1 Western Wind and Solar Integration Study Site Selection Analysis 5/14/2008.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
Montana Ambassadors Helena, Montana February 25, 2011.
Jason Marks Commissioner, District 1 February 4, 2008 New Mexico’s Path to a Sustainable Energy Future.
Transmission and the Growth of Wind Energy November 2011.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
DC Superconductor Cables for Long Distance Transmission 2009 Mid-America Regulatory Conference Traverse City, MI June 14-17, 2009.
1 FERC st Quarter Stakeholder Meeting for Transmission Planning Denver, CO March 6, :30 a.m. – 11:30 a.m.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Tacoma Power’s Compaq Server and Ethernet RTU Performance Testing Presented By Joe Orth 253/ EMS Group Meeting Presented.
0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
Utility Executive Roundtable: Co-op renewable energy initiatives Lee Boughey September 16, 2010.
Coal as a Future Generation Fuel Chris M. Hobson S enior Vice President and Chief Environmental Officer December 3, 2009.
Using a Dispersed Strategy in Your Region By Mike Michaud Matrix Energy Solutions Edited and Presented By Brian Antonich Windustry.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
CREZ Optimization Studies Scenario 2, Alternative 4: Low Impedance Backbone for Wind Connections Cathey Carter, PE RPG CREZ meeting 12/14/2007.
Khoo Yihan | Chua Cong Yang | Park Seong Jin.  Electricity is generated in power stations at 11000V to 33000V and then stepped up to V by transformers.
Holy Cross Energy Del Worley October 22, Holy Cross is an electric distribution cooperative that serve 55,000 meters Most of our consumers are located.
A new Spanish-French interconnection 13 february 2007 CEER Electricity Infraestructure workshop Brussels Dr. MARTÍN PORTILLO Deputy Transmission General.
1 Clean Line Energy National Association of State Utility Consumer Advocates Charleston SC Annual Meeting June 2012.
1 CCPG Senate Bill 100 Lamar – Front Range Presentation May 27, 2010.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Sixth Northwest Conservation & Electric Power Plan Proposed Wind Plant Capital Cost Assumption Jeff King Northwest Power and Conservation Council Portland,
PJM©2015 ATTACHMENT TO TESTIMONY OF ANDREW OTT OHIO ENERGY MANDATES STUDY COMMITTEE MARCH 18,
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
1.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
1 Integrating Wind Energy into the Electric Grid Wind Power Forum October 26, 2011 Brian Conroy, Electric System Engineering Central Maine Power Company.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
Karen Chiang Diane Cunningham Southern Company Load Research 1 When Normal Weather Is Not Normal AEIC Load Research Workshop April 2006.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
1 EMI’s “Bright Future” Solar Project CENTRAL in Jackson – Entergy Property Tracking with tilted axis – Estimated annual yield of 917,400 kWh.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Contents Introduction Focus area Wind scenarios
EI-WECC Seams Study Needed
New England’s Growing Thirst for Renewables East Coast Energy Connection 2016 Patrick Woodcock Director, Maine Energy Office.
I-5 Corridor Reinforcement Project
Economics of Electricity Transformation
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Kansas Electric Transmission Authority (KETA)
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
ECE 476 POWER SYSTEM ANALYSIS
= Models, Equations, & Explanation
Presentation transcript:

EASTERN PLAINS TRANSMISSION PROJECT Tri-State Generation & Transmission and Western Area Power Administration

EASTERN PLAINS TRANSMISSION PROJECT Resource Additions ► ► 2 x 600 MW supercritical coal units at Holcomb substation 2011, 2012 – near Garden City, Kansas ► ► Possible 600 MW addition at Lamar Energy Center in ► ► Task was how to integrate into existing Western Interconnection transmission system

EASTERN PLAINS TRANSMISSION PROJECT Transmission Additions ► ► Began with 345-kV alternatives and corridors ► ► Expanded to look into 500-kV alternative along same corridors ► ► Following slides show this progression

Initial Design BURLINGTON 3 X 345/230 HOLCOMB 1200 MW WRAY PAWNEE STORY COMANCHE BOONE SMOKY HILL CORNER POINT LAMAR ENERGY CENTER Sensitivities with and without LAMAR 2 X 345/230 BIG SANDY 2 X 345/230 DANIELS PARK 3 X 345/230 WATERTON 2 X 345/230 New 345 New 230 Planned 345 Existing 230 S A-1

345 kV Minimum for 1200 MW BURLINGTON 2 X 345/230 HOLCOMB 1200 MW WRAY PAWNEE STORY COMANCHE SMOKY HILL CORNER POINT LAMAR ENERGY CENTER BIG SANDY 2 X 345/230 BOONE 2 X 345/230 LAMAR 2 X 345/230 Sensitivities with 0 autos DANIELS PARK 3 X 345/230 WATERTON 2 X 345/230 MIDWAY 1 X 345/230 New 345 New 230 Planned 345 Existing miles 3 mile separation 80 miles 100miles 45 miles 80 miles B.Sandy – Midway 80 miles 70 miles 65 miles 125 Mile Rd. Sub 3/09/06

345 kV Minimum for 1800 MW BURLINGTON 2 X 345/230 HOLCOMB 1200 MW WRAY PAWNEE STORY COMANCHE SMOKY HILL CORNER POINT LAMAR ENERGY CENTER 600 MW Preliminary Stability Sensitivities evaluated two lines. Not preferred BIG SANDY 2 X 345/230 BOONE 2 X 345/230 LAMAR 2 X 345/230 Sensitivities with 0 autos DANIELS PARK 3 X 345/230 WATERTON 2 X 345/230 MIDWAY 1 X 345/230 New 345 New 230 Planned 345 Existing miles 135 miles Preferred instead of 2 Holcomb-Burlington 3 mile separation 80miles 100miles 45 miles 125 Mile Rd. Sub 80 miles 70 miles 65 miles 80 miles 3/09/06

500 kV Minimum for 1200 MW BURLINGTON 2 X 500/230 HOLCOMB 1200 MW WRAY PAWNEE STORY COMANCHE SMOKY HILL CORNER POINT 2 X 500/230 BIG SANDY 2 X 500/230 BOONE 2 X 500/230 LAMAR DANIELS PARK 3 X 345/230 WATERTON 2 X 345/230 Double-ckt 230 New 345 New 230 Planned 345 Existing 230 New miles 70 miles 80 miles 100miles 45 miles 80 miles MIDWAY 2 X 500/230 3/09/06 65 miles 125 Mile Rd. Sub

500 kV Minimum for 1800 MW BURLINGTON 2 X 500/230 HOLCOMB 1200 MW WRAY PAWNEE STORY COMANCHE SMOKY HILL CORNER POINT LAMAR ENERGY CENTER 2 X 500/ MW BIG SANDY 2 X 500/230 BOONE 2 X 500/230 LAMAR DANIELS PARK 3 X 345/230 WATERTON 2 X 345/230 Double-ckt 230 New 345 New 230 Planned 345 Existing 230 New miles 70 miles 80 miles 100miles 45 miles 80 miles MIDWAY 2 X 500/230 3/09/06 65 miles 125 Mile Rd. Sub

EASTERN PLAINS TRANSMISSION PROJECT 1200 MW Cost Comparison Minimum 345 kV Cost – $598.1 Million Minimum 500 kV Cost – $715.8 Million Difference of $117.7 Million ► ► 20 MW Less Losses on 500 kV System ► ► Average Cost of Energy $32.7/MWh ► ► 70% Plant Factor ► ► 26.4 Years to Payback

EASTERN PLAINS TRANSMISSION PROJECT 1800 MW Cost Comparison Minimum 345 kV Cost – $676.7 Million Minimum 500 kV Cost – $786.4 Million Difference of $109.7 Million ► ► 30 MW Less Losses on 500 kV System ► ► Average Cost of Energy $32.7/MWh ► ► 70% Plant Factor ► ► 16.5 Years to Payback

EASTERN PLAINS TRANSMISSION PROJECT Questions?