Information Requirements & Tools for Screening & Preliminary Assessment [DATE][SPEAKERS NAMES]

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

Module 4 Planning SP. What’s in Module 4  Opportunities for SP  Different SP models  Communication plan  Monitoring and evaluating  Working session.
ASSESSMENT & PLANNING FOR POST-DISASTER RECOVERY OF COMMUNITY INFRASTRUCTURE United Nations Development Programme Bureau for Crisis Prevention & Recovery.
USAID Environmental Procedures [DATE][SPEAKERS NAMES]
PROJECT RISK MANAGEMENT
Lesson 1 ODOT Simple Models. Simple Models Learning Outcomes As part of a group, develop conceptual models of REC, stressors, and a highway project Identify.
Watershed Approaches and Community Based Planning
Environmental Impact Assessment
Environmental Impact Assessment: A Land Use Planning Tool Diane Sherman, Ben Purdy, and Sara Felker Department of Resource Development Introduction Environmental.
AIACC Regional Study AS07 Southeast Asia Regional Vulnerability to Changing Water Resources and Extreme Hydrological due to Climate Change.
Writing a Preliminary Assessment (The example of the Environmental Review Report) [DATE][SPEAKERS NAMES]
USAID Africa Bureau EIA Procedures for Sub-Projects
Public Consultation/Participation in an EIA Process EIA requires that, as much as possible, both technical / scientific and value issues be dealt with.
Screen 1 of 24 Reporting Food Security Information Understanding the User’s Information Needs At the end of this lesson you will be able to: define the.
Health Aspect of Disaster Risk Assessment Dr AA Abubakar Department of Community Medicine Ahmadu Bello University Zaria Nigeria.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Basic Concepts for Assessing Environmental Impacts [DATE][SPEAKERS NAMES]
Principles of Marketing
Add your Logo in the slide master menu Module IMPLICATIONS WP8- SERVICES WP9-SOCIOECON WP10-VALUATION.
Assessment, Data collection methods Baseline Survey Module 3 – Session 1 Assessment – Time line Data collection methods Baseline survey.
Green Recovery And Reconstruction: Training Toolkit For Humanitarian Aid Environmental Impact Assessment Tools and Techniques Session 2: Tools for Conducting.
FAO/WHO CODEX TRAINING PACKAGE
USAID Environmental Procedures. EA Training Course 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific example of.
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Environmental Mitigation and Monitoring [DATE][SPEAKERS NAMES]
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Flood Risk Review Meeting: [Watershed Name] [LOCATION] [DATE]
1 Tools and Resources With a focus on assessment methods and Emergency Shelter EIA & Action Checklist.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
Information Requirements & Tools for Screening & Preliminary Assessment.
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
The Importance of Baseline Data More Than Just Counting Things Presentation to Geology Matters November 14, 2013.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
Environmentally Sound Design & Management. EA Training Course Tellus Institute 2 Environmentally Sound Design Definition & Motivation  Environmentally.
Information Requirements and Tools for Screening and Preliminary Assessment.
What is actor analysis? … a way to understand who is affected by and who has the power to influence water policy decisions and implementation, i.e. the.
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
Mali Work Packages. Crop Fields Gardens Livestock People Trees Farm 1 Farm 2 Farm 3 Fallow Pasture/forest Market Water sources Policy Landscape/Watershed.
ECASA Initial meeting, OBAN, 7th-8th December 2004 WP 2 : Identyfying and quantifying the most relevant indicators of the interactions of aquaculture on.
Basic Concepts for Assessing Environmental Impacts.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Basic Concepts for Assessing Environmental Impacts October 23 rd 2012Ar. Aditi Padhi.
Assessments. Assessment in the Project Cycle DESIGN IMPLEMENTATION MONITORING EVALUATION ASSESSMENT.
Methods: Pointers for good practice Ensure that the method used is adequately described Use a multi-method approach and cross-check where possible - triangulation.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
Characterization, Inventory and Monitoring of trends in indigenous livestock Dr. E. D. Ilatsia D. N. Kamiti 23-Oct-15Animal Breeding and Genomics Group1.
Practice with Screening & Getting started with the Environmental Procedures Training Manual (EPTM) [DATE][SPEAKERS NAMES]
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
Writing the IEE (EPTM Chapter 4). EA Training Course Tellus Institute 2 Writing the IEE IEE Review  Used when at least one screening outcome is “IEE.
Market research for a start-up. LEARNING OUTCOMES By the end of this lesson I will be able to: –Define and explain market research –Distinguish between.
Impact Analysis 2. Impact Prediction. Environmental Impacts The change in an environmental parameter, which results from a particular activity or intervention.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
1 Identify Preferred Alternative and Finalize Plan Planning Steps 7 & 8.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
Overview of Reg Overview of Reg Visit What is Reg. 216?  Sets out USAID’s pre-obligation EIA process for new activities.
Practice with Screening & Getting started with the on-line IEE Assistant.
Kettle River Watershed Management Plan Stakeholder Advisory Group Meeting #3 – July 19, 2012.
Writing a Preliminary Assessment (The example of the Initial Environmental Examination) [DATE][SPEAKERS NAMES]
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
USAID Environmental Procedures applied to Subgrant or “Umbrella” projects.
WHY IS THIS HAPPENING IN THE PROGRAM? Session 5 Options for Further Investigation & Information Flow.
Failure Modes, Effects and Criticality Analysis
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
EIA approval process, Management plan and Monitoring
Environmental Impact Assessment:
About Market Research Making a Questionnaire
Practice with Screening & Getting started with the Environmental Procedures Training Manual (EPTM) [SPEAKERS NAMES] [DATE]
Basics of Environmental Impact Assessment
Presentation transcript:

Information Requirements & Tools for Screening & Preliminary Assessment [DATE][SPEAKERS NAMES]

ENCAP EA-ESD Course: Information Requirements & Tools2 Review: Phase 1 of the EIA Process Screen the activity Based on the nature of the activity what level of environmental review is indicated? Conduct a Preliminary Assessment A rapid, simplified EIA study using simple tools (e.g. the USAID IEE) ACTIVITY IS OF MODERATE OR UNKNOWN RISK SIGNIFICANT ADVERSE IMPACTS POSSIBLE SIGNIFICANT ADVERSE IMPACTS VERY UNLIKELY ACTIVITY IS LOW RISK (Of its nature, very unlikely to have significant adverse impacts) ACTIVITY IS HIGH RISK (Of its nature, likely to have significant adverse impacts) Phase II Phase I Understand proposed activity Why is the activity being proposed? What is being proposed? BEGIN FULL EIA STUDY STOP the EIA process

ENCAP EA-ESD Course: Information Requirements & Tools3 Limited focus Therefore, we focus on the simpler tools and more limited information required by Phase 1. Screening and preliminary assessment are straightforward processes requiring only basic analysis! ! Remember... !

ENCAP EA-ESD Course: Information Requirements & Tools4 Relationship between information and tools Analysis Tool Identification and evaluation of impacts Your Critical Judgment Tools are simply ways of organizing and analyzing information.The outputs of a tool are only as good as the information that goes in. Tools don’t provide automatic answers. Your critical judgment is always required. Information What is a tool?

ENCAP EA-ESD Course: Information Requirements & Tools5 Types of information required  Screening & Preliminary Assessment requires three basic types of information: Only the most basic biophysical and economic/social data is required for screening. Before you gather more detailed information, research likely impacts of the proposed activities. Focus information- gathering on these likely impacts! Focus, please! Economic and social data Maps Biophysical characteristics of site(s) 12 3

ENCAP EA-ESD Course: Information Requirements & Tools6 Information requirements Economic and social data Maps Biophysical characteristics of site(s)  climatic information  Soils, topography, watersheds  land use  habits/ecosystems  protected areas Again, not all information is relevant to each activity. Focus your information-gathering on likely impacts! !

ENCAP EA-ESD Course: Information Requirements & Tools7 Information requirements  agricultural practices  water resources, sanitation  demographics  land ownership, community organization, other cultural aspects that affect resource use Economic and social data is usually required for activity design. (It is necessary to identify development needs & characterize beneficiaries) Therefore, your organization should already have much useful data. USE IT! Economic and social data Maps Biophysical characteristics of site(s)

ENCAP EA-ESD Course: Information Requirements & Tools8 Information requirements  Maps (Topographic, land use, even sketch maps)  Plans and sketches of the proposed site and activity Impacts are often significant because of location. E.g.: are latrines near a water supply? Is construction near a protected area? Maps make these relationships clear. Include maps in final documents Economic and social data Maps Biophysical characteristics of site(s) Why are maps essential for preliminary assessments?

ENCAP EA-ESD Course: Information Requirements & Tools9 Where do I obtain information? 1 2 DIRECT OBSERVATION Go to the site(s)! YOUR ORGANIZATION TALK to staff who know the project, and know the sites. OBTAIN project documents and information 3 UTILIZE OTHER LOCAL TALENT & KNOWLEDGE communities, government, counterparts What about reports by donor organizations and international agencies? What about government statistics? GIS databases? All these sources can be useful (and sometimes necessary) But good local information is the most important input to preliminary assessment. Aren’t we forgetting something? ?

ENCAP EA-ESD Course: Information Requirements & Tools10 Why direct observation?  Environmental review should not be a desk exercise: Talk to men AND women. Women’s perceptions on environmental matters are critical and distinct. Are latrines close to water supplies? Is there a drainage problem? Visual inspection is the quickest and best way to check issues of location, scale and proximity that determine many impacts. You need to SEE Is there a land tenure problem? How often does the river flood? Stakeholders and local communities have local knowledge that you need. And, impacts depend on what those affected value and need! You need to LISTEN !

ENCAP EA-ESD Course: Information Requirements & Tools11 If at all possible, DON’T make the preliminary assessment a desk exercise. ! Wait! What if I can’t travel to the sites? But if you can’t visit the sites/area, you need:  MAPS and PHOTOS to help you visualize the environment.  to TALK to people who have been there

ENCAP EA-ESD Course: Information Requirements & Tools12 When many people hear “EIA” they think of these tools. All are useful in full EIAs, but they are rarely used for preliminary assessments... Tools for Screening and Preliminary Assessments Four basic tools: 1. Checklists 2. Matrices 3. Networks 4. Overlays Don’t panic! Cost-benefit analysis Multi-criteria analysis Risk assessment Simulation modeling

ENCAP EA-ESD Course: Information Requirements & Tools13 1. Checklists Proposed Activities Clearing? Cut/fill?-- Dredging? Blasting? -- Ecosystem functions present Spawning habitat? Rearing habitat? -- Existing economic uses of water resource Drinking?-- Irrigation? -- Fishing? After Sadar, 1994 Checklists are simply lists of questions focused on “warning signs” of potential impacts & risks. Questions may concern... Checklist questions are: Usually easily answered from field inspection & basic information about the activity. Answered with yes/no (or simple quantitative) responses Many sector-specific checklists exist Nature of proposed activities Topography& ecosystems Existing uses etc

ENCAP EA-ESD Course: Information Requirements & Tools14 Checklists: Pros & Cons Easy to apply for non-experts Bring structure and consistency to:  gathering and classifying information  characterizing the basic nature of a project  identifying potential environmental impacts  designing mitigation measures Help to assure that key impacts or issues are not forgotten Advantages Flaws or omissions in the checklist often become flaws in your analysis. if an impact or issue is not on the checklist, it is usually forgotten Drawbacks ! Good tools for field survey!

ENCAP EA-ESD Course: Information Requirements & Tools15 2. Interaction Matrices What are they? They are tables containing... An interaction matrix matches each action to its associated impacts Aspects of the environment Proposed actions +50%  Qualitative or quantitative estimates of how a particular action affects a particular aspect of the environment                After Sadar, 1994

ENCAP EA-ESD Course: Information Requirements & Tools16 Matrices pros & cons Filling in the matrix requires systematic consideration of the possible impacts of each action. Because actions are matched to impacts, facilitates the identification of preventive mitigation measures Summarizes a lot of information compactly & indicates the most significant impacts at a glance Easily accommodates a mix of qualitative & quantitative impact estimates Advantages  Does not characterize the baseline situation  Does not promote consideration of secondary impacts  Hard to show change over time Drawbacks !

ENCAP EA-ESD Course: Information Requirements & Tools17 3. Network Analyses A diagram of the cause and effect linkages by which proposed actions affect environmental quality and resources Salmonoid populations FishingSpawning Temperature Flow Turbidity AccessDredgingClearing Proposed actions After Sadar, 1994 Key indicator of environmental quality Key economic use + + – – – – – – – What do the signs mean? + cause and effect are directly related – cause and effect are inversely related

ENCAP EA-ESD Course: Information Requirements & Tools18 Network Pros & Cons An excellent tool for identifying indirect impacts Provides a visual summary of cause and effect relationships that is easily understood & communicated to decision-makers Identifies intervention points for mitigation measures that may not be obvious Advantages  Can be hard to show adequate level of detail  Static (cannot show change over time)  Does not show relative significance of impacts Drawbacks ! Networks show explicitly the cause and effect relationships that underlie a matrix

ENCAP EA-ESD Course: Information Requirements & Tools19 4. Map Overlays Overlays are layered maps, in which each layer contains a particular type of information. Need to develop an overlay example here Layers can be added or removed. Why? Political boundaries Land use Topography GIS is increasingly used to produce overlays. But handmade overlays on transparent plastic work well! (and more)

ENCAP EA-ESD Course: Information Requirements & Tools20 Overlays: Pros & Cons The significance of impacts often depends on location. Overlays make critical issues of location clear. Maps are well-understood (good for communication to reviewers and to local communities) Maps are a basic part of information gathering for EIA. You already have a map. Use it to help you analyze impacts Advantages  Unable to show timing, reversibility, and probability of impacts  Sharp boundary definitions can be misleading Drawbacks ! Excellent for assessing alternative routes for pipelines, roads, powerlines

ENCAP EA-ESD Course: Information Requirements & Tools21 Choosing tools Appropriateness: will the tool produce the needed output? Cost, time & effort Remember, EA is generally <1% of project capital costs Two key criteria for selecting tools In general, sophisticated and resource- intensive methods are not the most appropriate in practice & 12 !