Materials developed by K. Watkins, J. LaMondia and C. Brakewood Stop/ Station Design & Access Unit 6: Station Design & Access.

Slides:



Advertisements
Similar presentations
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Advertisements

Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Los Angeles Bus Rapid Transit Tour Lessons Learned.
PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri
Capacity, Level of Service, Intersection Design (1)
Transit Capacity & Quality of Service Manual, 3rd Edition Station Capacity.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Chapter 14: Basic Freeway Segments and Multilane Highways
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Network Design Unit 4: Service Planning & Network Design.
East Bay Bus Rapid Transit Project Description August 11, 2011.
Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project.
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Juneau Downtown Tourism Transportation Study May 27, 2003.
Chap 4 Cross Section Elements (pp.4-1 – 4-66 ) The following topics (pages) are covered in this lecture: Pavement (p.4-1 – 4-7) Pavement (p.4-1 – 4-7)
Florida Department of Transportation, November 2009
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Route Design Unit 4: Service Planning & Network Design.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity.
Euclid Corridor Design TRB BRT Workshop July 21, 2008.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
Chapter 2 (supplement): Capacity and Level-of-Service Analysis for Freeways and Multilane Highways Objectives of this presentation: By the end of this.
Capacity Analysis CE 453 Lecture #14.
Vehicle Flow.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Chapter 221 Chapter 22: Fundamentals of Signal Timing: Actuated Signals Explain terms related to actuated signals Explain why and where actuated signals.
2 $ Million investment in three transportation projects prioritizing the movement of people to and through the Loop Washington/Wabash CTA Station.
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
1 Design of Evacuation System for High-Rise Building Danqing Yu.
Lec 31, Handout: Public passenger transport (objectives) Be familiar with mass transit classifications and characteristics Know how urban transport demands.
Lec 5: Capacity and LOS (Ch. 2, p.74-88)
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Understanding Changes in Ridership Unit 7: Forecasting & Encouraging Ridership.
Cross Sections CE 453 Lecture 22 Iowa DOT Design Manual Chapter 3.
Design Speed and Design Traffic Concepts
Bus Stop Design Guidelines - In Support of Effective Service Planning
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Regulation & Finance Unit 7: Forecasting and Encouraging Ridership.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
1 Corridor Cities Transitway Presented to: Amberfield HOA January 15, 2015.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
Business Logistics 420 Public Transportation Lecture 20: Transit System Design.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Service Planning & Standards Unit 4: Service Planning & Network Design.
ORIENTATION AND MOBILITY USING TRANSPORTATION SYSTEMS BROUGHT TO YOU BY MICHELLE, LAURA AND CARLA.
Terminal Design Passenger Processing. errata  Consider TSA impacts.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Communicating with Travelers Unit 8: Improving Transit Quality.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Chapter 20: Actuated Signal Control and Detection
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Timetabling Components Unit 5: Staff & Fleet Scheduling.
Parking Instructors: Dr. Yahya Sarraj Dr. Essam Almasri.
Design of Parking Facilities Chapter 16 Dr. TALEB M. AL-ROUSAN.
Geometric Design (I). Learning Objectives To understand the considerations and quantifiable aspects of geometric design.
Vehicle Flow. Homework Ch 3 # 1,4, 7, 15 Vehicle Flow How do vehicles operate in the system –capacity –speed –headway –density.
TRB/APTA 2004 Bus Rapid Transit Conference Implementing a BRT Project: The Preliminary Steps 8:30 – 9:50 a.m. Frank SpielbergBMI-SG Incoming Chair, TRB.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
America Walks Assessing the Path of Travel: Considerations and Effects on Older Adults and Persons with Cognitive Disabilities.
Intersections.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Frequency Determination Unit 5: Staff & Fleet Scheduling.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
Geometric Design: General Concept CE331 Transportation Engineering.
Complete Streets Training
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
Lecture 2: Improving Transit Service Through Planning, Design, and Operations This lecture was originally prepared by Dr. Kari Watkins, Georgia Institute.
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Transportation System Engineering 1 , 61360
Freeway Capacity and Level of Service
Bus Rapid Transit Study
Terminal Design Passenger Processing
Presentation transcript:

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Stop/ Station Design & Access Unit 6: Station Design & Access

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Three Main Considerations Station Types and Configuration – Structure based on transit type Vehicle Circulation – Number and movement of buses Passenger Circulation – Number and movement of riders

Materials developed by K. Watkins, J. LaMondia and C. Brakewood STATION TYPES AND CONFIGURATIONS

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Bus Stops Located along streets Consist of – Waiting area on public sidewalk – Signage to mark stop – Lighting – Sometimes amenities

Materials developed by K. Watkins, J. LaMondia and C. Brakewood ADA Compliant Bus Stop Pad Firm, stable surface Clear dimension of 96 by 60 in. No steeper than 1:48 slope

Materials developed by K. Watkins, J. LaMondia and C. Brakewood ADA Compliant Bus Shelters Connected to accessible routes Signage at shelters and stops is highly visible Low-level platforms 8” above top of rail or coordinated with typical vehicle floor

Materials developed by K. Watkins, J. LaMondia and C. Brakewood DISCUSSION QUESTION What works with this solar-powered bus stop?

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Transit Centers Multiple bus routes converge to transfer Layover area for bus routes Transfer to rail, intercity bus, park and ride Located off-street Wayfinding Larger or more elaborate shelter and amenities Driver break room and restrooms

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Busway and BRT Stations Along roadways (on of off-street) More elaborate 40 to 100 ft Amenities Possible vertical circulation Fare collection

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Vancouver BRT

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Eugene BRT

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Light Rail Stations 180 to 400 ft Center, side, or split On-street, off-street, rail ROW, transit mall High or low platforms Usually include canopies, limited seating, TVM More amenities

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Heavy Rail / AGT Stations More elaborate High-level platforms due to third-rail power Platform screen doors to control access Often underground or elevated Center or side platform 600 to 800 ft long Fare control Possible parking Other amenities

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Commuter Rail Stations Wide range – Suburban locations with one or two platforms – Major urban terminals with many tracks and platforms Center or side platforms or combination Passenger and freight 300 to >1,000 ft Heavy park-n-ride Often amenities Can be complex passenger interactions

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Possible Amenities AmenityAdvantagesDisadvantages SheltersComfort, protection from climate, identify stop Maintenance, graffiti, visual impact BenchesComfort, identify stop, lower costMaintenance, graffiti, no climate protection Lean BarsSome comfort, lower cost, less spaceNot as comfortable, maintenance LightingVisibility, securityPower, maintenance, cost MapsInfo on transit, areaPeriodic updating Real-time Arrival InfoPerceived reliability, wait timePower, communications, maintenance, cost HeatComfort in coldPower, maintenance, cost, liability Vending machinesServices, revenueTrash, visual, vandalized TrashCleanliness,Cost, odor, security TelephonesConvienice, securityLoitering, cell phones negate ArtAestheticsPerceived wasteful cost

Materials developed by K. Watkins, J. LaMondia and C. Brakewood VEHICLE CIRCULATION

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Required Bus Berths At least two berths (one for each direction) Possible layover berths Based on recovery time divided by route headway times safety factor (1.2) Need to calculate for whole day and use the greatest plus growth room

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Bus Berth Designs

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Bus Berth Designs

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Private Vehicles Park-and-Ride – Per passenger rates of 0.4 – 0.6 Kiss-and-Ride – Average wait time 7-8 minutes Bike Parking

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Bike Parking Bike LockersBike Share

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Bike Parking

Materials developed by K. Watkins, J. LaMondia and C. Brakewood PASSENGER CIRCULATION

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Station Access Includes Many Aspects Sufficient safe space for movement – Horizontal Space Corridor widths Doorways – Vertical Space Stairway widths Escalators Efficient time for purchasing and collecting fares – Number of ticket machines – Number of fare gates

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Decisions Based on Walkway LOS

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Pedestrian Speed

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Pedestrian Circulation Terms Pedestrian capacity: max people occupying or passing through facility (persons / area / min) – “absolute” capacity - max possible – “design” capacity – max desirable Pedestrian speed: average or range of walking speed (f/s or m/s) Pedestrian flow rate: peds per unit time passing a point (escalator, fare control gate, etc) – Pedestrian flow per unit width (walkway width in in, ft, or m

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Pedestrian Circulation Terms (cont’d) Pedestrian density: average number of persons per area within a walkway or queuing area Pedestrian space per person: average area for each pedestrian – Inverse of density – Varies by activity and characteristics of peds Pedestrian time-space: space required multiplied by time spent doing activity in area Effective width or area: walkway or stairway space actually used by pedestrians

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Design Capacities Passenger demand volumes under typical peak-period Additional demand from service disruptions and special events Emergency evacuation situations Breakdown in pedestrian flow occurs with dense crowding – Desirable pedestrian LOS – Not max pedestrian capacity

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Horizontal Circulation Walkways Multi-activity Passenger Circulation Moving Walkways – Same as walkways

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Steps to Determine Required Walkway Width 1.Choose analysis period (15 min or less) 2.Based on the desired LOS, choose max ped flow rate (p/ft/min or p/m/min) 3.Estimate ped demand 4.Compute design ped flow (p/min) by dividing the demand by # minutes. 5.Compute required effective width of walkway (in feet or meters) by dividing design ped flow by the max ped flow rate. 6.Compute the total width of walkway (in feet or meters) by adding 2 to 3 ft ( to 1.0 m), with a 12- to 18-in. (0.3- to 0.5-m) buffer on each side to the effective width of walkway.

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Steps to Determine the Required Doorways 1.Based on the desired LOS, choose max ped flow rate 2.Choose analysis period (15 min or less) 3.Estimate pedestrian demand 4.Compute the design pedestrian flow (per/ min) by dividing the demand by # minutes. 5.Compute the required width of the doorway (in feet or meters) by dividing the design pedestrian flow by the maximum pedestrian flow rate. 6.Compute the number of doorway required by dividing the required entrance width by the width of one doorway (always round up). 7.Determine whether the design pedestrian flow exceeds the entrance capacity

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Doorway LOS

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Vertical Circulation Stairways Escalators Elevators 1.Entering / exiting 2.User characteristics (luggage) 3.Elevator travel time 4.Capacity Ramps – Use walkways

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Steps to Determine Required Stairway Width Two methods: 1.LOS Method 2.Pedestrian Paths Method

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Option 1: LOS Method 1.Based on desired LOS, choose max ped flow rate 2.Select analysis period 3.Estimate directional ped demand 4.Compute design ped flow (ped/min) by dividing the demand by # minutes 5.Compute required width (in ft or m) by dividing design ped flow by max ped flow 6.Increase the stairway width by one or more traffic lane (30 in) when reverse-flow pedestrian volumes occur frequently

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Stairway LOS

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Option 2: Pedestrian Paths Method

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Steps to Determine the Required Escalators 1.Determine analysis period (15 min or less) 2.Estimate directional ped demand 3.Compute the design ped flow (ped / min) by dividing the demand by # minutes 4.Based on width and speed of escalator, choose nominal capacity (ped / min) 5.Compute # escalators by dividing the design pedestrian flow by the nominal capacity of one escalator, rounding up.

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Steps to Determine the Required Ticket Vending Machines Two methods (round up to at least 2) 1.Install sufficient TVMs so that peak-period queues do not exceed “tolerable” levels, except during periods of unusually high demand. 2.Install sufficient TVMs to meet off-peak demand, and supplement them with on-site fare sales during peak times. NTVM = # TVMs (round up), Parr = # arriving pass / hr pt = % purchasing ticket 3,600 = sec/hr tt = avg transaction time (sec/pass)

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Steps to Determine the Required Faregates 1.Choose analysis period (15 min or less) 2.Estimate ped demand 3.Compute design ped flow (pass / min) by dividing the demand by # minutes 4.Compute # gates, turnstiles, or combination required by dividing the pass flow by capacity of individual units (always round up or add one for each direction of flow)

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Faregate Capacity

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Conclusion It is important to design attractive stations in order to obtain ridership. Enough space should be given to vehicles and passengers to maneuver. Elements of a transit station such as corridors, fare boxes etc. have levels of service.

Materials developed by K. Watkins, J. LaMondia and C. Brakewood Reference Materials in this lecture were taken from: TCRP Report 165, “Transit Capacity and Quality of Service Manual, 3 rd edition”, 2013 TCRP Report 153, “Guidelines for providing access to public transportation stations” Manual, Highway Capacity. "HCM 2000." Washington, DC: Transportation Research Board (2000).