Www.izmirekonomi.edu.tr L5: Interest Formulas – Equal Payment Series ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.

Slides:



Advertisements
Similar presentations
MER439- Design of Thermal Fluid Systems Engineering Economics Lecture 2- Using Factors Professor Anderson Spring 2012.
Advertisements

Chapter 4 More Interest Formulas
Rate of Return Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
1 Warm-Up Review Homepage Rule of 72 Single Sum Compounding Annuities.
4 The Time Value Of Money.
Chapter 2 Solutions 1 TM 661Chapter 2 Solutions 1 # 9) Suppose you wanted to become a millionaire at retirement. If an annual compound interest rate of.
(c) 2002 Contemporary Engineering Economics 1 Chapter 4 Time Is Money Interest: The Cost of Money Economic Equivalence Development of Interest Formulas.
Module 1 – Lecture 4 MONEY TIME RELATIONSHIP Prof. Dr. M.F. El-Refaie.
Borrowing, Lending, and Investing
L10: Debt Management ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Internal Rate of Return (Multiple Rates of Return Problem) ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Module 3 ANNUITY Engr. Gerard Ang School of EECE.
(c) 2002 Contemporary Engineering Economics
Interest Formulas – Equal Payment Series Lecture No.5 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
(c) 2002 Contemporary Engineering Economics
Interest Formulas – Equal Payment Series
Present Value and Loans Mat 112. Now, let’s withdraw.
Interest Formulas – Equal Payment Series
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis.
Interest Formulas (Gradient Series) Lecture No.6 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Regular Deposits And Finding Time. An n u i t y A series of payments or investments made at regular intervals. A simple annuity is an annuity in which.
Summer Time Value of Money Session 2 07/02/2015.
Finding the Payment on a Spreadsheet
L13: Equivalence Calculations under Inflation
MTH108 Business Math I Lecture 25.
ISU CCEE CE 203 More Interest Formulas (EEA Chap 4)
Economic System Analysis January 15, 2002 Prof. Yannis A. Korilis.
L9: Equivalence Analysis using Effective Interest Rates ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering.
L3: Economic Equivalence ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
1 u INTEREST- a payment made for the use of money over a period of time. u INTEREST RATE - The price of using the money over a period of time.
Chapter IV Tutorial Time Value of Money. Important Abbreviations N (number of periods) I/Y (interest per year) PV (present value) PMT (payment) FV (future.
Chapter 4: The Time Value of Money
Equivalence and Compound interest
ENGINEERING ECONOMICS Lecture # 2 Time value of money Interest Present and Future Value Cash Flow Cash Flow Diagrams.
Chapter 6: Time Value of Money
Interest Formulas (Gradient Series)
Engineering Economics. Excel Financial Functions.
L15: Present Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Interest Formulas – Equal Payment Series
L8: Nominal and Effective Interest Rates ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Equivalence of cash flows Construction Engineering 221.
Lecture No. 9 Chapter 3 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Financial Mathematics 1. i = interest rate (per time period) n = # of time periods P = money at present F = money in future –After n time periods –Equivalent.
L6: Interest Formulas (Gradient Series) ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas – Equal Payment.
ECONOMIC EQUIVALENCE Established when we are indifferent between a future payment, or a series of future payments, and a present sum of money. Considers.
EGR Single-Payment Factors (P/F, F/P) Example: Invest $1000 for 3 years at 5% interest. F 1 = (1000)(.05) = 1000(1+.05) F 2 = F 1 + F.
CTC 475 Review Simple vs Compound Interest Find F given P –(equation and factor form) Find P given F –(equation and factor form) Find i given P, F and.
Chapter 2 Solutions 1 TM 661Chapter 2 Solutions 1 # 9) Suppose you wanted to become a millionaire at retirement. If an annual compound interest rate of.
Determine the amount saved if $375 is deposited every month for 6 years at 5.9% per year compounded monthly. N = 12 X 6 = 72 I% = 5.9 PV = 0 PMT = -375.
Economic Equivalence Lecture No.3 Chapter 2 Fundamentals of Engineering Economics Copyright © 2008.
L18: Annual Worth Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
Aim: Money Matters-Annuities & Sinking Funds Course: Math Literacy Aim: How does money matter? Annuities – a savings plan. Do Now: You are 21 years old.
(c) 2002 Contemporary Engineering Economics 1. Engineers must work within the realm of economics and justification of engineering projectsEngineers must.
L7: Unconventional Equivalence Calculations
TM 661 Problems, Problems, Problems. Changing Interest Stu deposits $5,000 in an account that pays interest at a rate of 9% compounded monthly. Two years.
1 Equivalence Between Two Cash Flows Step 1: Determine the base period, say, year 5. Step 2: Identify the interest rate to use. Step 3: Calculate equivalence.
Equivalence Factors and Formulas Moving Money Around.
All figures in Lacs of Rs. A= P(1+i) n Compounding Discounting Present Sum, P Future Amount, A.
Time Value of Money Annuity.
Chapter 4: The Time Value of Money
Time Value of Money Chapter 2.
Interest Formulas – Equal Payment Series
Interest Formulas (Gradient Series)
Chapter 2 Time Value of Money
Example 2.14:Powerball Lottery
NE 364 Engineering Economy
By Muhammad Shahid Iqbal
Chapter 4: The Time Value of Money
Presentation transcript:

L5: Interest Formulas – Equal Payment Series ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences

Equal Payment Series 012 N 0 12N AAA F P 0 N

Equal Payment Series – Compound Amount Factor 012 N 0 12N AAA F 012 N AAA F

Compound Amount Factor 012 N 0 12N AAA F A(1+i) N-1 A(1+i) N-2

Equal Payment Series Compound Amount Factor ( Future Value of an annuity) Example 2.9: Given: A = $5,000, N = 5 years, and i = 6% Find: F Solution: F = $5,000(F/A,6%,5) = $28, N F A

Validation

Finding an Annuity Value Example: Given: F = $5,000, N = 5 years, and i = 7% Find: A Solution: A = $5,000(A/F,7%,5) = $ N F A = ?

Example 2.10 Handling Time Shifts in a Uniform Series F = ? $5,000 $5,000 $5,000 $5,000 $5,000 i = 6% First deposit occurs at n = 0

 Annuity Due  Excel Solution =FV(6%,5,5000,0,1) Beginning period

Sinking Fund Factor Example 2.11 – College Savings Plan: Given: F = $100,000, N = 8 years, and i = 7% Find: A Solution: A = $100,000(A/F,7%,8) = $9, N F A

Excel Solution Given:  F = $100,000  i = 7%  N = 8 years Find: =PMT(i,N,pv,fv,type) =PMT(7%,8,0,100000,0) =$9,746.78

Capital Recovery Factor Example 2.12: Paying Off Education Loan Given: P = $21,061.82, N = 5 years, and i = 6% Find: A Solution: A = $21,061.82(A/P,6%,5) = $5, N P A = ? 0

P =$21, A A A A A i = 6% A’ A’ A’ A’ A’ i = 6% P’ = $21,061.82(F/P, 6%, 1) Grace period Example 2.14 Deferred Loan Repayment Plan

Two-Step Procedure

Present Worth of Annuity Series Example 2.14:Powerball Lottery Given: A = $7.92M, N = 25 years, and i = 8% Find: P Solution: P = $7.92M(P/A,8%,25) = $84.54M N P = ? A 0

Excel Solution Given:  A = $7.92M  i = 8%  N = 25 Find: P =PV(8%,25,7.92,0) = $84.54M

Option 2: Deferred Savings Plan $2,000 Example 2.15 Early Savings Plan – 8% interest Option 1: Early Savings Plan $2,000 ? ?

Option 1 – Early Savings Plan Option 1: Early Savings Plan $2,000 ? 6531Age

Option 2: Deferred Savings Plan Option 2: Deferred Savings Plan $2,000 ?

At What Interest Rate These Two Options Would be Equivalent?

Using Excel’s Goal Seek Function

Result

Option 1: Early Savings Plan Option 2: Deferred Savings Plan $2,000 $396,644 $317,253