CSRIC Working Group 7 Mike O’Reirdan. Mission Statement Working Group 7 – Botnet Remediation Chair – Michael O’Reirdan, Chairman, Messaging Anti-Abuse.

Slides:



Advertisements
Similar presentations
1 Innovation and Trend Global Ecommerce Legislation Chair of UNNeXT Legal Panel
Advertisements

Cost Recovery Working Group NANC Report Billing & Collection Working Group (B&C WG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Jim Castagna, Verizon.
TIA Activities Supporting Wireless Alerts David Su Chief, Advanced Network Technologies Division NIST SOURCE:TIA TITLE:TIA Activities Supporting Wireless.
2014 Drought Outreach Workgroup. On March 20 th the Implementing Committee created the 2014 Drought Outreach Workgroup due to the impending drought and.
ESW 7 - FCC Jeff Cohen Senior Legal Counsel Public Safety Bureau FCC Interests & Policy Around Geolocation.
Task Force Session Standards & Interoperability Task Force Stan Huff, Co-Chair Arien Malec, Co-Chair February 17, 2015.
Working Group 11: Consensus Cyber Security Controls March 14, 2013 Alan Paller, SANS Institute Marcus Sachs, Verizon Communications WG 11 Co-Chairs.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Working Group 1: NG9-1-1 June 6, 2012 Laurie Flaherty Brian Fontes WG 1 Co-Chairs.
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
Working Group #3 E9-1-1 Location Accuracy December 16, 2011 Craig Frost, Verizon Wireless, Co-Chair Stephen J. Wisely, APCO International, Co-Chair.
Young Entrepreneurs Alliance Project Proposal February 28, 2005 Erika Hammond and Michael Kalin.
Botnets, the FCC CSRIC Botnet Working Group, and Opportunities for Internet2 Industry Partners and Researchers Internet2 Spring Member Meeting, Arlington.
Working Group 7: Botnet Remediation March 6, 2013 Michael O’Reirdan (M 3 AAWG) - Chair Peter Fonash (DHS) – Vice-Chair.
A key role for co-regulation Chris Rowsell. What the White Paper says... We challenge the industry to come forward, even before legislation, with an effective.
CABRI-Volga Cooperation Along a Big RIver: Institutional coordination among stakeholders for environmental risk management in the Volga basin International.
JOINT ADVISORY COMMITTEE ON COMMUNICATIONS CAPABILITIES OF EMERGENCY MEDICAL AND PUBLIC HEALTH CARE FACILITIES Structure for Advisory Committee.
Internet2 Member Meeting Security BoF Internet2 Spring Member Meeting, Arlington VA 7:30-8:30 April 25 th, 2012, Salon K Joe St Sauver, Ph.D.
1. Unmanned Aircraft Systems (UAS) Webinar presentation January 2014 Transport Canada Ron Carter (Chief, Standards) Department of Transportation James.
Working Group 7: Botnet Remediation Status Update June 6, 2012 Michael O’Reirdan (MAAWG) - Chair Peter Fonash (DHS) – Vice-Chair.
Working Group 6: Secure BGP Deployment December 16, 2011 Andy Ogielski, Renesys Jennifer Rexford, Princeton U. WG 6 Co-Chairs.
Toby Roy, San Diego County Water Authority Task Force Chair October 9, 2012.
Working Group #4: Network Security Best Practices March 22, 2012 Presenter: Tony Tauber, Comcast WG #4 Member Via teleconference: Rod Rasmussen, Internet.
Focus Group 4 Interoperability NRIC V Council Meeting October 30, 2001 Ross Callon Juniper Networks Scott Bradner Harvard University Co-chairs, Focus Group.
Working Group 7: Botnet Remediation Status Update September 12, 2012 Michael O’Reirdan (MAAWG) - Chair Peter Fonash (DHS) – Vice-Chair.
Drowning in Codes of Conduct: An analysis of codes of conduct applying to online activity in Australia Chris Connolly and David Vaile Cyberspace Law and.
1 Local Involvement Network (LINk) for Hertfordshire Tim Anfilogoff Policy Manager Users and Carers, ACS Appendix 1.
Working Group #4: Network Security Best Practices September 12, 2012 Presenter: Rod Rasmussen, Internet Identity WG #4 Co-Chair.
WG #3 E9-1-1 Location Accuracy September 23, 2011 Craig Frost, Verizon Wireless, Co-Chair Stephen J. Wisely, APCO International, Co-Chair.
1 Presentation for: Green Pacific Conference 21 September 2010, Seattle, WA Marine Vessel Environmental Performance and Rating System (MVeP) (Voluntary.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Focus Group 1B Cybersecurity Dr. Bill Hancock, CISSP Cable and Wireless America FG1B Chair
Working Group 8 – E9-1-1 Best Practices September 23, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
Working Group 4B: Network Timing Single Source Risk Reduction Status Update September 21, 2015 Jennifer A. Manner, Chair.
Government and Industry IT: one vision, one community Cybersecurity Shared Interest Group Monthly Meeting January 12, 2011 Jim Graham, SecureIT, SIG ChairSecureIT.
Working Group 5: Cybersecurity Information Sharing Status Update December 3, 2015 Christopher Boyer, Co-Chair (AT&T) Rod Rasmussen, Co-Chair (IID) Brian.
Working Group 4B: Network Timing Single Source Risk Reduction Status Update December 3, 2015 Jennifer A. Manner, Chair.
Working Group 8 – E9-1-1 Best Practices December 16, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
Earthquake Response Cooperation Initiative Phase 1 Progress Report By Chinese Taipei May 19, 2001 APEC EWG 21 Kuala Lumpur, Malaysia.
Working Group 6: Secure Hardware and Software – Security by Design Status Update September 21, 2015 Joel Molinoff, Co-Chair (CBS) Brian Scarpelli, Co-Chair.
Working Group 6: Secure Hardware and Software – Security by Design Status Update December 3, 2015 Joel Molinoff, Co-Chair (CBS) Brian Scarpelli, Co-Chair.
Working Group 6: Secure BGP Deployment March 22, 2012 Andy Ogielski, Renesys Jennifer Rexford, Princeton U. WG 6 Co-Chairs.
Category II Faculty Evaluation Implementation Sheila Rucki, Chair, FSWC Joice Gibson, CAT II Interim Representative Ashby Butnor, CAT II Representative.
Transfer of Technology Consultative Process Wanna Tanunchaiwatana Manager, Technology Climate Change Secretariat (UNFCCC) Asia and the Pacific Regional.
Working Group 7: Cybersecurity Workforce Status Update September 21, 2015 Bill Boni, Co-Chair T-Mobile Drew Morin, Co-Chair TeleCommunication Systems FCC.
2008 ORANGE COUNTY CHARTER REVIEW COMMISSION Presentation to Board of County Commissioners August 26, 2008.
Working Group 6: Secure BGP Deployment September 23, 2011 Andy Ogielski, Renesys Jennifer Rexford, Princeton U. WG 6 Co-Chairs.
NTIA Stewardship Transition in the Internet Community July 24, 2014.
Re-cap & Next Steps Mahalingam Mani. The WG Now and from Now The main deliverables have progressed close to completion for this charter Problem statement.
Clients/Faculty Advisors Dr. Eric Bartlett May01-14 Team Members David Herrick Brian Kerhin Chris Kirk Ayush Sharma Incremental Learning With Neural Networks.
Working Group 2: Emergency Alerting Platforms Status Update September 21, 2015 Farrokh Khatibi, Co-Chair (Qualcomm) Francisco Sánchez, Jr., Co-Chair (Harris.
Project Parkway Timeline to 2011 April 1, 2010 Town Hall Meeting Steering Committee Schools February 2009 May 18, 2009 Project Parkway Community Kick-
Working Group 3: Emergency Alert Systems Status Update March 16, 2016 Kelly Williams, Co-Chair National Association of Broadcasters Steve Johnson, Co-Chair.
Working Group 8: Priority Services CSRIC V Meeting March 16, 2016 Thomas Anderson, Co-Chair (Cisco) Bill Reidway, Co-Chair (Neustar)
HFQLG Independent Science Panel Phase Two (Final review) October 17 – July 31, 2013 Onsite Review March 18 th – March 21 st.
Freight Forum RTC Washoe March 31 st, The reliable, cost effective, and safe movement of goods and products across the State of Nevada and.
Working Group 6: Secure Hardware and Software – Security by Design Deliverable 2 Status Update June 22, 2016 Joel Molinoff, Co-Chair (CBS) Brian Scarpelli,
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint June.
GST IMPLEMENTATION : THE ROAD MAP  The implementation of GST will require crossing 3 milestones: I) Legal Framework II) IT Infrastructure III) Change.
Stó:lō Business Association
NANC Report Numbering Oversight Working Group (NOWG)
NANC Report Numbering Oversight Working Group (NOWG)
Central / Mother Lode Regional Consortium Planning Conference
Structure of the final report
NDIA PMSC Guides Working Group
OpenID Enhanced Authentication Profile (EAP) Working Group
NANC Interoperable Video Calling Working Group
OpenID Enhanced Authentication Profile (EAP) Working Group
Presentation transcript:

CSRIC Working Group 7 Mike O’Reirdan

Mission Statement Working Group 7 – Botnet Remediation Chair – Michael O’Reirdan, Chairman, Messaging Anti-Abuse Working Group Description: This Working Group will review the efforts undertaken within the international community, such as the Australian Internet Industry Code of Practice, and among domestic stakeholder groups, such as IETF and the Messaging Anti-Abuse Working Group, for applicability to U.S. ISPs. Building on the work of CSRIC II Working Group 8 ISP Network Protection Practices, the Botnet Remediation Working Group shall propose a set of agreed-upon voluntary practices that would constitute the framework for an opt-in implementation model for ISPs. The Working Group will propose a method for ISPs to express their intent to op-into the framework proposed by the Working Group. The Working Group will also identify potential ISP implementation obstacles to the newly drafted Botnet Remediation business practices and identify steps the FCC can take that may help overcome these obstacles. Finally, the Working Group shall identify performance metrics to evaluate the effectiveness of the ISP Botnet Remediation Business Practices at curbing the spread of botnet infections.

What is going on elsewhere IETF bot remediation draft in last call – remediation-16 remediation-16 MAAWG recommendations – CSRIC 2 recommendations iCode in Australia botfrei.de bot remediation centre in Germany Japanese Cyberclean centre Dutch ISP treaty Finnish bot information service Bot Metric work in place at MAAWG

Draft work plan Phase 1:Based on CSRIC II output, MAAWG recommendations and IETF draft, produce initial code of conduct January 2012 / March 2012 Phase 2:Develop implementation plan June / August 2012 Phase 3: Develop bot metrics Date TBD

Members of Working group Craig SpiezleOTA Matt Carothers Cox Alfred Huger Sourcefire Kevin Sullivan Microsoft Joseph St Sauveur U.Oregon Gunter Ollman Damballa Chris Roosenraad TWC Neil Schwartzman CAUCE Bill Smith PayPal Johannes Ulrich SANS Max Weinstein Stop Badware Rod Rasmussen Internet Identity Eric Osterweil Verisign Jay Opperman Comcast Alex Bobotek ATT Brian Done DHS John St Clair Verizon Barry Greene, ISC