Monitoring working group Preliminary draft report (to be consolidated) Eric Marboutin, Fridolin Zimmermann, Claudio Groff, Paolo Molinari.

Slides:



Advertisements
Similar presentations
Project Eco-pedological Map for the Alpine Region SUMMARY 1. The Alpine Convention context 2. Ecopedological map project proposal 3. Preliminary APAT approach.
Advertisements

Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
THEME: Togo’s experiences regarding the elaboration of national GEF strategies and priority setting. By : Mr. Yao Djiwonu FOLLY GEF Operational Focal Point.
Contribution of Silva Mediterranean Contribution of Silva Mediterranea to the Initiative on forestation and landscape restoration in drylands: Analysis,
Identification of critical success factors for implementing NLLS, through collaboration and exchange of expertise IDENTIFY LLP-2008-RO-KA1-KA1NLLS.
J.M. Iriondo 1, N. Maxted 2, S. Kell 2, B. Ford-Lloyd 2 & C. Lara 1 1 Universidad Rey Juan Carlos, Madrid, Spain 2 University of Birmingham, UK Towards.
Comprehensive M&E Systems
“”Capacity and services to road users” Task descriptions Paul van der Kroon, Paris November 2005.
CEDR TG Road Safety Rome, 31 October 2005 CEDR and Road Safety Goals, Priority issues and working programme of the TG “Road Safety” and its Task Groups.
This project is funded by the European Union M EDSTAT II  Euro-Mediterranean Statistical Co-operation Introduction and objectives of the training session.
. GLOBAL LAND COVER NETWORK/ASIACOVER WORKSHOP Overview Of The Global Land Cover Network Initiative (GLCN) Strategies for Land Cover Mapping and Monitoring.
Prepared for the 3rd SBB telecon 20 Mar 2012 Michele Walters, BI-01 task coordinator.
Global AMR Surveillance | 3 December |1 | AMR surveillance: Roadmap for a global programme AMR surveillance: Roadmap for a global programme.
Assessment on the implementation of the Mediterranean Strategy for Sustainable Development Dr Nicola Cantore Overseas Development Institute,
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of MICS Tools, Templates, Resources, Technical Assistance.
Improving Coverage and Management Effectiveness of the Protected Area System in the Republic of Moldova Maria NAGORNII Head of the Analysis, Monitoring.
EC CHM and EUNIS Presentation of IDA project results
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
Survey Priorities Discussion Group Participants: Wang Hao, Cristiano, Megan, Wiggy, Curtis, Simon, Henni, Kristen, Naamal, Matt, Lisa, Leeanne, Tom L.
EUROPEAN REGIONAL DEVELOPMENT FUND Event – date, place About INTERREG EUROPE INTERREG EUROPE INTERREG IVC Joint Technical Secretariat.
Spanish-Portuguese Meteorological Information System for Trans-Boundary Operations in Forest Fires Agreement number ECHO/SUB/2014/
Characterization, Inventory and Monitoring of trends in indigenous livestock Dr. E. D. Ilatsia D. N. Kamiti 23-Oct-15Animal Breeding and Genomics Group1.
Introduction 1. Purpose of the Chapter 2. Institutional arrangements Country Practices 3. Legal framework Country Practices 4. Preliminary conclusions.
WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) 1 st Innovation Dialogue Forum Becici, 8-9 November 2010.
Transboundary Trust Space February 16, 2012 Ensuring trust in information exchange – proposal and approaches from Russia and CIS-states (RCC states) National.
JRC - IRMM – 17/18 June 2008 – EAQC-WISE project workshop – Held1 The EAQC-WISE blueprint: Recommendations for a quality control system for chemical monitoring.
Workshops to support the implementation of the new languages syllabuses in Years 7-10.
ACTIONS AT NATIONAL LEVEL Proposal on criteria to choose ERFP activities/projects on national (sub-regional) level Elżbieta Martyniuk on behalf of the.
The partnership principle and the European Code of Conduct on Partnership.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
1 FAO REGIONAL WORKSHOP ON RICE AND AQUACULTURE FOR PRODUCTIVITY INCREASE AND MARKET DEVELOPMENT IN EAST AFRICA, KAMPALA,UGANDA, APRIL 2009 AQUACULTURE.
ESPON Info Day on New Calls and Partner Café 18 May 2010 in Bruxelles Call for Proposals on Transnational Networking Activities (Projects carried through.
Partnership Health: Evaluation and possibilities for an adapted structure Agenda item 11 Madhavi Bajekal, ONS (UK) PH coordinator Directors of Social Statistics.
10 August Inter-Regional Workshop on the Production of Gender Statistics New Delhi, India, 6-10 August 2007 Strengthening National Gender Statistics.
Project “Eco-pedological Map for the Alpine Region” APAT- Agency for Environmental Protection and Technical Services Harmonization of Soil Information.
A forum for coordinating state, federal, and tribal aquatic monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring Partnership.
HUMANITARIAN RESPONSE MONITORING. HOW TO USE THIS PRESENTATION This presentation contains a complete overview of all aspects of Response Monitoring Presenting.
Background The Sustainable Development Goals (SDGs), which the UN Members States jointly committed to in September 2015, provide an ambitious and long-term.
Session 2: Developing a Comprehensive M&E Work Plan.
Progress Report on Quality Issues SIPUS – Strengthening of Internationalisation Policies at Universities in Serbia February 18, 2015 Belgrade, Serbia.
RECOMMENDATIONS: Red Listing  Compile all Red List assessments for European CWRs (national, European, global)  Contact Plantlife re data from IPA, etc.
PARIS21 workshop, Accra, July 2005 Meeting the data challenge: National Strategies for the Development of Statistics (NSDSs) Frances Harper PARIS21.
Auditing Sustainable Development Goals
The International Plant Protection Convention
REPORT OF THE ELECTRONIC WORKING GROUP UNEP(DEC)/CAR WG.29/INF.12
National Policy Dialogues under the EU Water Initiative
EC FP7 - Cooperation Theme 6: Environment (incl. climate change)
The Natura 2000 Biogeographical Process in its strategic context
Urban Agenda Partnership on Circular Economy
Wolves in the western Alps: monitoring and conservation status
JRC’s Follow-up work to improve GES assessment
Overview of working draft v. 29 January 2018
Institutional Framework, Resources and Management
RECARE set-up Rudi Hessel on behalf of coordination team
Helene Skikos DG Education and Culture
Task Force on Target Setting and Reporting TFTSR
CIS progress June-November 2011: main highlights
Preparatory Workshop of the Pilot Boreal Natura 2000 Seminar
OECD good practices for setting up an RIA system Regional Capacity-Building Seminar on Regulatory Impact Assessment Istanbul, Turkey 20 November 2007.
European Commission, DG Environment, Marine Unit
4th Meeting of the MIG-P, Brussels, June 2016
5.b3 Monitoring & Reporting 2019
Draft revision of ISPM 6: National surveillance systems ( )
DG Environment, Unit D.2 Marine Environment and Water Industry
NEW STEPS IN THE PROJECT GIS NATURA 2000
Preparatory meeting for the establishment of the Project Coordination Group (PCG) for the implementation of the MSFD 13 November :00-13:30 European.
cooperation in statistics Proposal for the organizational structure
Presentation transcript:

Monitoring working group Preliminary draft report (to be consolidated) Eric Marboutin, Fridolin Zimmermann, Claudio Groff, Paolo Molinari

Guidelines WISO, page 10, §5a, « development of an Alpine programme for monitoring large carnivores », but monitoring what for (questions, objectives, time scale and spatial frame ?) WISO research projects (Recovery of wolf & lynx in the Alps) need data to feed the modelling work (SEIBM for Ke, MVP for P extinct, SDP for optimised management options… etc.)

Our best guess : WISO wants to monitor L.C. populations so as to implement evidence-based management MANAGEMENT OPTIONS Very conservative not conservative Monitoring system Rough & coarse-grained elaborated and fine-grained Associated costs Low High Knowledge improvement Low High Ability to feed-back the system (adaptive management) Low High

Review of state of the art in monitoring: What do we know? Who is doing what? How is cooperation organised? The current « state-of-the-art »: existing groups (SCALP, WAG, italian bear PACOBACE, no name alpin bear group !) having their own « way-of-life », their relation to institutions (E.C., C.o.E) and other groups (LCIE/IUCN), and using classical protocols to monitor large carnivores (low density, large range, low encounter rate) - One coordinator for SCALP appointed to coordinate and field biologists in charge of monitoring within their respective countries. - PACOBACE coordinated by Ministry of Env.; at least one yearly meeting - WAG: a mostly I-CH-F group, with one meeting every 2 years, but no coordinator - No name alpine bear group: occasionnal meetings, more regularly , now irregularly (like yesterday)

index of population AREA W olf A lpin G roup Number of packs italian transboundary french

Identify fields of further activities: Gaps of knowledge in monitoring Where do we need to improve cooperation? How can we achieve a more consistent cooperation? Sampling related issues such as: uncontrolled observation effort (false positive signs  SCALP categories?; false negative  occupancy ) Gaps of knowledge: Where do we need to improve cooperation? SCALP  OK Enlarge the wolf alpine group to all potentially interested countries of the Alps (not only I, F and CH) For the bear try to improve technical reporting (distribution map)? How can we achieve a more consistent cooperation? Success stories analysis (to see why it works well and some times not) Win-win strategy

Recommend concrete activities to the WISO Platform: Additional tasks Define clear management objectives before implementing any monitoring scheme A lot of reporting to different organizations (EU, LCIE, SPOIS, WISO,…): could WISO help to harmonize the reporting system (time frame, content)? Involvement of the WISO network Could WISO mandate somebody (technical coordinator) to do these tasks? Which tasks should be tackled first in the MAVA project To start feeding the models  Build up a common data base of (already existing) geo-referenced presence signs for all three carnivore species across the Alps Identify what ideal data would be required (GPS telemetry data)?

Specific questions: SCALP, Alpine Wolf Workshop and Alpine Bear Workshop relation to WISO Platform? Implement an internal consulting process (SCALP, WAG,...) to check how far already existing members could collaborate with WISO in a win-win framework Harmonization of genetic protocols for identification of LC species and individuals? Check with genetic labs

Minimum species specific tool kit for monitoring Caution: management objectives so far unknown Two step approach based on biological issues: Core area: elaborated methods to survey breeding units Implement a good network of field observers to improve efficiency in documenting population changes and detection rates of vagrants Bear tool kit:Wolf tool kit:Lynx tool kit: Genetic and systematic sampling (hair traps, rub trees) Genetic Wolf howling? Snow tracking? Camera-trapping in reference areas Genetic In core areas: Every where: define a common protocol to analyze animals found dead (diseases, genetics, poison) Collection of signs of presence

A review of current state of the art An « historical » founding event (without genetic bottleneck ): the SCALP (lynx) More or less (more > less) standardized validation protocols to compile field data (presence only data) to build and compare over time presence maps (how to switch to P/A maps: occupancy modelling …)

First thoughts (1/2) Get explicit objectives for monitoring as a function of WISO/Alpine Convention objectives / strategies Get feedback from « modelling working group » in order to check what we should ideally « feed » them with, and how to make already existing data available to them? How to favour transboundary approaches? Analysis of key- factors explaining success stories (e.g. having a SCALP coordinator, win-win strategy … etc.).

A review of current state of the art Another « outbreeding » group: the WAG (wolf) No common protocol to validate presence signs data, but genetic data «on the road again, again, again », so only and robust basic outputs (e.g. number of packs) are provided.

First thoughts (2/2) Should already existing groups get « closer » to WISO/Alpine Convention and how far (change name, simply provide data, formalize collaborations – F-I-CH political agreement) Should new groups be implemented (e.g. bear group)? Should all groups be somehow to some degree pooled under a commun WISO umbrella (e.g. LCAG: Large Carnivores Alpine Group) ? Many other and more interesting suggestions from you all I hope ?