1 Optics/Analysis Update Chris Rogers MICE Software pc 28 April 05.

Slides:



Advertisements
Similar presentations
Requirements Specification and Management
Advertisements

1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
PID Detector Size & Acceptance Chris Rogers Analysis PC
Additional Emittance Plots The following plots are derived from Mark’s analysis of the Step 1 data taken in approx. August Mark derived the (rms,
Cooling channel issues U. Bravar Univ. of Oxford 31-Mar-2004.
1 Scintillating Fibre Tracker Simulation Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
1 Emittance Calculation Progress and Plans Chris Rogers MICE CM 24 September 2005.
Updates: Misalignment, Statistics David Forrest (Happy new year)
Status – Week 247 Victor Moya. Summary Streamer. Streamer. TraceDriver. TraceDriver. bGPU bGPU Signal Traffic Analyzer. Signal Traffic Analyzer.
K.Walaron Fermilab, Batavia, Chicago 12/6/ Simulation and performance of beamline K.Walaron T.J. Roberts.
Chris Rogers, MICE CM16 Wednesday Plenary Progress in Cooling Channel Simulation.
Emittance Calculation Chris Rogers, Imperial College/RAL Septemebr
Beamline-to-MICE Matching Ulisse Bravar University of Oxford 2 August 2004 MICE performance with ideal Gaussian beam JUNE04 beam from ISIS beamline (Kevin.
Midterm Tuesday October 23 Covers Chapters 3 through 6 - Buses, Clocks, Timing, Edge Triggering, Level Triggering - Cache Memory Systems - Internal Memory.
MICE input beam and weighting Dr Chris Rogers Analysis PC 05/09/2007.
1 Emittance Calculation Progress and Plans Chris Rogers Analysis PC 18 August 2005.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
TOF Resolution Required to measure bunch length ~ 0.5 ns RMS from RF Bucket size For 1e-3 emittance measurement resolution of TOF should be
1 Tracker Window & Diffuser Radius vs Scraping Aperture Chris Rogers Analysis PC 6th April 06.
1 Chris Rogers MICE Collaboration Meeting 11th Feb 2005 Tracking and Cooling performance of G4MICE.
Diffuser Studies Chris Rogers, IC/RAL MICE VC 09 March 2005.
Analysis of MICE Chris Rogers 1 Imperial College/RAL Thursday 28 October, With thanks to John Cobb.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Input/Output. Input/Output Problems Wide variety of peripherals —Delivering different amounts of data —At different speeds —In different formats All slower.
Chapter 6 RAID. Chapter 6 — Storage and Other I/O Topics — 2 RAID Redundant Array of Inexpensive (Independent) Disks Use multiple smaller disks (c.f.
Status of Onboard Filter & Ground Software Integration Work done by Navid Golpayegani Steve Ritz J.J. Russell David Wren SLAC Ground Software Workshop:
Team Babbage Charles Maingi Seph Newman Jon Rollman Nils Schlupp.
Software Development Software Testing. Testing Definitions There are many tests going under various names. The following is a general list to get a feel.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
CS 350, slide set 5 M. Overstreet Old Dominion University Spring 2005.
Weka: Experimenter and Knowledge Flow interfaces Neil Mac Parthaláin
1 BetaFunction Void DoIntegration Double GetBeta Double GetAlpha Double GetEmittance Double GetPz Void Print Void AddMaterial Void AddQuadrupole Void AddSolenoid.
Programming for Beginners Martin Nelson Elizabeth FitzGerald Lecture 12: Programming Project.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
Statistical Arbitrage Team Xing Liu, Leo, Ying, Yandong.
MICE input beam weighting Dr Chris Rogers Analysis PC 05/09/2007.
Documentation Dr. Andrew Wallace PhD BEng(hons) EurIng
Update Chris Rogers, Analysis PC, 13/07/06. State of the “Accelerator” Simulation Field model now fully implemented in revised MICE scheme Sanity checking.
CSE & CSE6002E - Soft Computing Winter Semester, 2011 Neural Networks Videos Brief Review The Next Generation Neural Networks - Geoff Hinton.
Mark Rayner 14/8/08Analysis Meeting: Emittance measurement using the TOFs 1 Emittance measurement using the TOFs The question: can we use position measurements.
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
MICE Analysis Code Makeover Chris Rogers 14th September 2004.
1M. Ellis - NFMCC - 31st January 2007 MICE Analysis.
Structural Design Software TYLER HUTCHISON. Requirements  Develop an interface to generate a text file.  The text file is then passed to one of five.
Modularity Computer Science 3. What is Modularity? Computer systems are organized into components called modules. The extent to which this is done is.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
9/12/99R. Moore1 Level 2 Trigger Software Interface R. Moore, Michigan State University.
PID Detector Requirements for Emittance Measurement Chris Rogers, MICE PID Review, Thursday Oct 12.
M. Ellis - MICE Video Conference - 30th August Software Report Recent progress:Recent progress: –Start of code to read DATE format (two parts) One.
IT3002 Computer Architecture
Field Modelling Tools in G4MICE MICE VC Chris Rogers 1st Feb 2006.
1 Software Workshop Report Malcolm Ellis MICE Video Conference Wednesday 9 th November 2005.
14/01/2008MICE CM23 - Beam Line Parallel Session1 Simulations: tools and status Marco Apollonio, Imperial College - London.
1June 2 nd 2009MICE CM24 - RAL1 m. apollonio Beamline+( ,P) matrix.
Nufact02, London, July 1-6, 2002K.Hanke Muon Phase Rotation and Cooling: Simulation Work at CERN new 88 MHz front-end update on cooling experiment simulations.
MICE Tracker Software A. Dobbs CM32 9 th Feb 2012.
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
15 June 2010PC Analysis PC Schedule Tuesdays fortnightly Provisional dates 1 June 15 June 28 June (JC away) CM27 7 – 10 RAL Let me & Yagmur.
This presentation will describe the state of each element in the beam line with regards to the current update being undertaken. Firstly, it will describe.
Numerical Simulations for IOTA Dmitry Shatilov BINP & FNAL IOTA Meeting, FNAL, 23 February 2012.
1June 1 st 2009MICE CM24 - RAL1 Beamline Optics m. apollonio.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Marco apollonioAnalysis Meeting (9/12/2006)1 transmission vs amplitude with a finite size diffuser M. Apollonio – University of Oxford.
Accelerator Tools - Status Chris Rogers, ASTeC, Rutherford Appleton Laboratory.
C++ coding standard suggestion… Separate reasoning from action, in every block. Hi, this talk is to suggest a rule (or guideline) to simplify C++ code.
Using MICE to verify simulation codes?
How to turn on MICE Step IV
Fix Garmin GPS Map Update Error
For Tutors Introduce yourself.
Presentation transcript:

1 Optics/Analysis Update Chris Rogers MICE Software pc 28 April 05

2 Analysis Various changes –Mostly on level of code clean up/algorithm improvement Cleaned up Analysis.cc –Added Analysis.hh Altered File I/O –Added AnalysisPlaneManager File I/O causes bottleneck –Changed algorithm to read in all AnalysisPlanes in one pass through file I/O goes as (number of planes) rather than (number of planes) 2 Fixed SPE algorithm –Now works for 2/4/6 dimensions Output format solidified –Two interface classes for event-by-event output and plane-by-plane output –Mechanical angular momentum added Added functionality to pull beta function into Analysis.cc –Use it to generate a covariance matrix –Currently interfaces through a text file, eventually should go direct from Optics To do: –Change method of generating weighting for Gaussian dist n –Clean up emittance calculation algorithm to dodge rounding errors

3 Optics Several new classes (not on cvs) –Driven by Beamline design work, so I’m doing Optics first and then interfacing it into BeamTools later BetaFunction –Takes a field map, takes quadrupoles, also materials –Calculates the Beta Function Material –Calculates the change in pz, beta, alpha, emittance from passing through some (thin) material Quadrupole –Calculates kappa for a quadrupole (May be a bit buggy) Need to do: –(i) Need a wrapper to generate field maps/read in datacards –(ii) Need a minimiser Should we use minuit? –I don’t know if we need anything else… Aim is to have this finished by Frascati –Plus BeamTools work plus some Analysis toys…

4 Class Diagram BetaFunction MaterialQuadrupole OpticsFieldManager Fields/BeamTools Minimiser Output done

5 e.g. beta through MICE Channel Beta(z)

6 Summary Lots of changes Mostly lots of small changes Optics Package in preparation, but working backwards –Need to sort out BeamTools sometime