London Metropolitan University Islington College

Slides:



Advertisements
Similar presentations
CONCEPTUAL WEB-BASED FRAMEWORK IN AN INTERACTIVE VIRTUAL ENVIRONMENT FOR DISTANCE LEARNING Amal Oraifige, Graham Oakes, Anthony Felton, David Heesom, Kevin.
Advertisements

Develop an Information Strategy Plan
BSc Honours Project Introduction CSY4010
Refresher Instruction Guide Strategic Planning and Assessment Module
Project Proposal.
Role of Vendor Technologies in the Development of Network Professionals Mak Sharma and Sharon Cox School of Computing, Telecommunications and Networks.
Final Year Project COMP39X COMP390/3/4/5 Final Year Project Demonstration & Dissertation Irina Biktasheva
1 Faculty of Public Health Continuing Professional Development Scheme.
Your Project Proposal.
introduction to MSc projects
Project Report1 Dave Inman Project report. Project Report2 Ways to write a report Top down: Write the structure of the report (maybe use the web templates.
CS300 Planning and Executing a Project Terry Hinton Helen Treharne.
M.Sc Projects David Wilson M.Sc Projects Coordinator for Computing & Information Systems.
IACT303 – INTI 2005 World Wide Networking Welcome and Introduction to Subject. Penney McFarlane The University of Wollongong.
Developing Business Practice – 302LON Preparing for a Successful Work Experience Unit: 9 Knowledgecast: 2.
Standards and Guidelines for Quality Assurance in the European
Learning with a Purpose: Learning Management Systems Patti Holub, Director District Initiatives and Special Projects Miguel Guhlin, Director Instructional.
Introduction to Interactive Media 02. The Interactive Media Development Process.
The Project Planning Process
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Symposium 2001June 24, 2001 Curriculum Is Just the Beginning Chris Stephenson University of Waterloo.
Developing an IS/IT Strategy
1 The Initial Report Preparation Guidelines. 2 The Initial Report u Definition of project scope u Project aims and objectives u Initial project plan.
Hertfordshire in Action Working in Partnership to secure effective Transition and Progression.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
MSc Project How to Get Started.
Z26 Project Management Introduction lecture 1 13 th January 2005
Feasibility Study.
 Based on progressions points - learning statements that indicate what a student should be able to achieve at each level.  No set assessment, the way.
University of Leeds Ethnicity and Cultural Diversity Network The Globe Centre, Accrington 22 nd September 2005.
1 COM618: Information Systems Project Introduction Dr Madonna Herron Faculty of Computing and Engineering Room 16C18 module.
BSc Honours Project Introduction CSY4010 Amir Minai Module Leader.
BSc Honours Project Introduction CSY4010 Amir Minai Module Leader.
INTRODUCTION TO STUDY SKILLS. What are Study Skills?  Study skills are approaches applied to learning. They are considered essential for acquiring good.
FINAL YEAR PROJECT (FYP) ERT 423 SESSION 2010/2011 “INTRODUCTION” MISMISURAYA MEOR AHMAD
BSc Final Year Projects in Computing Computer Science, Creative Computing, Games Programming, Business Computing Dr Rodger Kibble.
Draft TIP for E-rate. What is E-rate? The E-rate provides discounts to assist schools and libraries in the United States to obtain affordable telecommunications.
COMP 208/214/215/216 – Lecture 8 Demonstrations and Portfolios.
BSBPMG522A - Undertake Project Work
Request for Proposal (RFP)
CMPGN3007 & CMPGN3008 BSc Project Dr T.A.Etchells BSc Project Tutor
1 CC2039 Professional Development for Communication Technology Module lecturer: Saroj Lamichhane.
FYP Preparations Week 1.
FYITS – Students Mktg Briefing Nov 2010 BSc (Hons) Engineering Management Nature of Course The course seeks to equip students with management knowledge.
Compliance Assist Refresher Instruction Guide Adding or Editing Student Learning Outcomes.
BSc Honours Project Introduction CSY4010 Amir Minai Module Leader.
Mindset 2000 LtdSlide 1 Train to Gain Provider Support Programme October 2007 Self assessment - introduction.
Peer Reviewer - Basic Workshop 2 Prof Hala Salah Consultant in NQAAP Prof Hussein El-Maghraby Member, NQAAP.
1 CC2039 Professional Development for Communication Technology Developing a Project Proposal.
Publishing Technology & Media Solutions.  Founded in  Works on Cutting-edge Technologies.  Achieved total financial stability since inception.
Now what? 1.  I have short-listed projects I am interested in  I know the types of projects I would like to pursue  I have an idea of the resources.
BSc Honours Project Introduction CSY4010 Amir Minai Module Leader.
Conducting a research project. Clarify Aims and Research Questions Conduct Literature Review Describe methodology Design Research Collect DataAnalyse.
M253 Students Study Guide Mrs. Fatheya Al Mubarak – AOU Dammam.
BE ABLE TO SELECT AND APPLY FAULT REMEDIES TO IT SYSTEMS.
Development Project Dr Kris Welsh Dr Raheel Nawaz.
Technical Business Consultancy Project
COMP390/3/4/5 Final Year Project Introduction & Specification
COMP390/3/4/5 Final Year Project Introduction & Specification
COMP390/3/4/5 Final Year Project Demonstration & Dissertation
COMP390/3/4/5 Final Year Project Demonstration & Dissertation
OCR Cambridge Technical Introductory Diploma in IT Bridging Work
MyWritingLabPlus and the Research Paper
Unit 09 – LO3 - Be able to Implement and Test Products
COMP390/3/4/5 Final Year Project Demonstration & Dissertation
COMP390/3/4/5 Final Year Project Introduction & Specification
Structure of learning content for AgriTeach 4.0
COMP390/3/4/5 && COMP593 Final Year Projects Demonstration & Dissertation Irina Biktasheva
AICT5 – eProject Project Planning for ICT
Project Closure And Termination
Presentation transcript:

London Metropolitan University Islington College BSc (Hons) Computer Networking and IT Security BSc (Hons) Computing FC3P01 Final Year Project Module

FC3P01 Project Module This module provides an opportunity for you to extend your studies in particular fields of interest that appertain to your future career aspirations. Students are expected to bring together the academic content and skills developed in a range of modules in an interdisciplinary way.

FC3P01 Project Module 2 semesters long Quarter of your final year. 100% Coursework = 20% interim report + 40% final report 40% continuous assessment

FC3P01 Project Module Project Specification/Project Plan Interim Report Final Report Log Book Project Folder CD-ROM of computer-based project work Personal Development Portfolio Project Viva

Elements of Assessment Interim Report (20%) details progress to date assesses progress against project plan discusses work still left to do amends project plan to account for slippage (report writing guide available)

Elements of Assessment Final Report (40%) full account of project work undertaken include system documentation 2 copies, bound (report writing guide available)

Elements of Assessment Continuous Assessment (40%) Log Book Project Folder CD-ROM of computer-based project work

Elements of Assessment Some components are NOT assessed: Project Plan Personal Development Portfolio Project Viva However, they are all mandatory elements.

What is a Log Book? it is a progress document add to it regularly and date each entry mostly hand-written, with sketches etc. record meetings and their outcome

What is a Project Folder? printouts from program executions iterations of user interface design interim test results hardcopy of reference materials lever-arch or box file formative feedback from supervisors

What can go into the CD-ROM Folder? information and searches from the Web copies of reports and submissions software programmes email correspondence with your tutor email correspondence with external organisations/institutions content of participation in online forums

What is a Personal Development Portfolio? 1. Your skills strengths at the start of the project: where/how you acquired them e.g. from work experience or throughout specific areas of the taught parts of your course.   2. Your skill weaknesses at the start of the project: whether they are technical or non-technical skills and how you have planned to improve them e.g. online training tools, support from other students etc. 3. Your confidence level in tackling all parts of the project from proposal definition, systems analysis, design, implementation, testing and evaluation. Also how well you feel you can cope with the writing up of the report. 4. Your career aspirations and preferences. Also whether you believe that the project has helped you decide on a career path.

What is a Personal Development Portfolio? 5. How you felt about tackling a substantial implementation and how you found working by yourself i.e. your motivation levels and your personal time management.   6. Your skill strengths at the end of the course and how they contributed to your success. 7. Your skill weaknesses at the end of the course and where you were able to achieve the most improvement. 8. Your highlights and the aspect about your work that you are most proud of.

Making a good start Start early and get organised Identify your other commitments Maintain and monitor the project plan Do plenty of background reading Start the log book now Create a set of contingency plans Use your supervisor properly

FC3P01 Project Module Your needs: What parts of my course do I find interesting? What are my strengths? What are my weaknesses? What types of academic activity do I enjoy? What things do potential employers look for? What new skills or knowledge would I like to acquire? What personal constraints do I have?

Example Project Types Using FaceBook as a Virtual Learning Environment In-door room finder mobile app development Augmented Reality mobile app development Full-text search engine based on database programming XML representation of UML diagrams Development of an online Education Forum Developing an online database of Job Opening Development of a Student Portfolio System

Example Project Types A Comparative Study of Total Cost Ownership of Open Source vs Proprietary Software A Comparative Study of IT Security Policy (Application Access) in College Management Systems Comparative Study of Web Design Strategies A comparative study on Library Information System (LIS) based on Barcode and Radio Frequency Identification (RFID) Comparing and contrasting two or more different databases

Example Project Types Challenges and opportunities of IT outsourcing in Nepal E-CRM features in telecommunication websites Cloud computing in Education System A comparative study between perceived and realized benefits after adopting e-commerce Towards an effective adoption of ERP in Nepal A comparative study on Library Information System (LIS) based on Barcode and Radio Frequency Identification (RFID)

Final Year Project Specification 1. Project Details   1. Project Details Title: Supervisor: Second Marker: Date Approved: 2. Introduction 3. Aim 4. Deliverables and Objectives 5. Suggested Starting Point 6. Estimated Costing and Resources Required 7. Bibliography

Completing your Project Specification 1. Project Details Title:   Supervisor: Second Marker: Date Approved: 2. Introduction In this section you should give an introduction and background to your project. About 10-15 lines should be adequate. 3. Aim In this section explain in general terms what you intend to achieve by the end of the project. 4. Deliverables and Objectives In addition to meeting the general requirements for the final year project as set out in the module guide, your specific objectives are set out below: In this section you should identify Specific deliverables (things you intend to produce) and objectives of the project. These do not need to include reporting as this is covered by the general requirements. You should have 4 or 5 specific objectives to your project.

Completing your Project Specification 5. Suggested Starting Point In this section give details of where you intend to start, for example focussed literature review, evaluative survey of current offerings, previous project/research results. 6. Estimated Costing and Resources Required In this section you should include estimated costs for the project in terms of components and equipment and a list of resources required, for example for example android devices, development software or subscription to websites/forums. 7. Bibliography In this section, give a list of books/papers/articles/e-resources which will provide a starting point in your literature survey. Include between 5-10 items here.

Project Plan - example

Project Plan - example

Project Plan - example

Project Plan Sample milestones: requirements elicitation problem modelling system analysis and specification system design module implementation and system integration system testing and evalaution documentation

Things to watch out for: FC3P01 Project Module Things to watch out for: client organisation problems time management plagiarism unexpected issues (e.g. illness)

FC3P01 Project Module How to do well: All assessed elements have to be undertaken to the highest professional level consistency and sustainability in-depth knowledge of project area consideration of contextual issues, alternative solutions etc. evaluative excellently delivered viva

FC3P01 Project Module References: Weaver, Philip., “Success in your Project – A Guide to Student System Development Projects”, Pearson Education Limited, 2004 Dawson, Christian. W., “Projects in Computing and Information Systems: A Student’s Guide”, (2nd Ed.) Pearson Education Limited, 2009