New ALICE Beam Pipe: Injection Protection C. Bracco on Behalf of ABT/BTP Acknowledgment: M. Giovannozzi.

Slides:



Advertisements
Similar presentations
Updates BI-TL MADX Optics Studies C. Bracco. Next Steps from last meeting BHZ40 Nominal beta, -1.4 m dispersion.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC 18 & 19 April 2015 At 450 GeV with bumps, no increased MUFO activity. Beam screen 15R8 warming up to 80 K, ongoing for the day 09:00: Orbit studies.
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
Report Friday Very efficient last 24h!.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Transfer Line Linac4 to PSB: Injection Aperture Limitations.
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Bernhard Holzer, CERN-LHC Parameter Space for HL-LHC IR8 * IP5 IP1 IP2 IP8 LEB Meeting.
Beam expected in the afternoon PM: – Establish first-turn – Establish closed orbit – Rough correction of machine parameters Evening: – RF capture Night:
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
The Large Hadron Collider Contents: 1. The machine II. The beam III. The interaction regions IV. First LHC beam [R. Alemany] [CERN AB/OP] [Engineer In.
Progress with beam Mike Lamont. BUNCH TRAINS AND CROSSING ANGLES AT INJECTION Werner Herr et al 2.
Overview WP14 Developments Hardware  Interferometry on the spare TDIs, planned to be installed Christmas stop 2015/2016. Final acceptance tests ongoing.
MKI failure event 17-April-11 Recall from logbook: MKI D (1st one seen by the beam) had a real flashover between the two sets of 36b during the 3rd 72b.
Schematics for simplified energy deposition study in IR7 R. Assmann.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
Issues Concerning Different Beam Lines Integration C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements: WP3 and.
Some ideas to optimise PSB injection chicane Wim, Brennan, Jan, Masamitsu.
Optimization of beam envelop at the injection point of PS Chenghui Yu Jan. 30, 2012.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
ALICE sensitivity to background and injection failures with the smaller aperture A. Di Mauro TREX meeting, 31/07/2014.
Proposal for change of the reference emittance for the estimate of apertures, DA, etc. G. Arduini with input from: C. Bracco, R. Bruce, H. Burkhardt, R.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
How low can we go? Getting below β*=3.5m R. Bruce, R.W. Assmann Acknowledgment: T. Baer, W. Bartmann, C. Bracco, S. Fartoukh, M. Giovannozzi, B. Goddard,W.
V. Kain AB/OP1Chamonix XV What is required to safely fill the LHC? V.Kain AB/OP Input from: B.Goddard, M.Jonker, Y.Kadi, R.Losito, V.Mertens, B.Puccio,
First evaluation of Dynamic Aperture at injection for FCC-hh
Aperture measurements during LHC commissioning 2017
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
Operating IP8 at high luminosity in the HL-LHC era
Wednesday 8.9 External crossing angles:
HL-LHC Aperture Update
fundamental equations of LHC performance
Field quality update and recent tracking results
Status and needs of dynamic aperture calculations
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
VELO detector and available aperture in IR8
Beam collimation for SPPC
Thursday morning – optics correction
Alice solenoid – orbit distortion
LHC Injection and Dump Protection
Collision bump amplitudes for the 450 GeV run
Week 35 – Technical Stop and Restart
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
LHC (SSC) Byung Yunn CASA.
IR2 aperture measurements: results, actions and proposal
Thursday :00: Physics fill from the night shift
Collider Ring Optics & Related Issues
LHC Beam Operations Past, Present and Future
Global aperture measurements at 450 GeV with 170 mrad crossing angle
LHC Closed Orbit For Beam 2
Collimation margins and *
Collision bump amplitudes for the 450 GeV run
HL-LHC operations with LHCb at high luminosity
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Thanks to S. Fartoukh, W. Herr, B. Jeanneret, M. Giovannozzi
Progress in IR8 matching for b* squeeze
Plan for 1 m b* J. Uythoven & J. Wenninger
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Upgrade on Compensation of Detector Solenoid effects
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

New ALICE Beam Pipe: Injection Protection C. Bracco on Behalf of ABT/BTP Acknowledgment: M. Giovannozzi

Outlines Reminder Assumptions Aperture and beam envelope: – Nominal injection – Grazing event (MKI failure) – Mis-injection Conclusions

Reminder

To protect the LHC aperture at injection (bottleneck in the arc) and respect the collimation hierarchy: LHC injection protection collimators (TDI, TCLIA and TCLIB) ar at 6.8  TCDI (in the TL) are at 4.5 – 5  To protect the LHC aperture at injection (bottleneck in the arc) and respect the collimation hierarchy: LHC injection protection collimators (TDI, TCLIA and TCLIB) ar at 6.8  TCDI (in the TL) are at 4.5 – 5 

5MG - TREX meeting18/07/2014 Alice aperture: results - I  *=10 m  ext =170  rad Sep=2 mm M. Giovannozzi 4  bottleneck in the experiment Minimum aperture = 13  (bottleneck in the arc) Ok!...check MKI grazing failure..

Reminder 90% MKI strength 10% MKI strength

Assumptions Normalised emittance of 3.5 mm mrad also for postLS2 case Optics for protons (minimum n1):  * = 10 m, crossing angle = 170  rad, separation =2 mm Beam envelope: 6.8   (what can go through TCDIs and TDI) + 20% beta-beating Aperture: Mech.aperture* – Mech.tol.* – Orbit** – Disp.offset*** * Data from ALICE and Massimo ** 4 mm *sqrt(  /max(  )) *** Dy*3e-4

Aperture and Beam Envelope PreLS2 TDI Nominal kick

Aperture and Beam Envelope PostLS2 TDI Nominal kick

Phase Advance Min. Aperture- MKI

Grazing Event (Vertical) TDI Nominal MKI kick grazing (10% MKI kick)

Grazing Event (Vertical) TDI Nominal MKI kick grazing (10% MKI kick) 20 sigma

Mis-injection (Horizontal) Nominal Mis-injection: x 0 = 2.5 mm x 0 ’= 30 urad Mis-injection: x 0 = 2.5 mm x 0 ’= 30 urad 15 sigma

Conclusions The new proposed aperture fulfills the n1 requirements of collimation hierarchy: bottleneck kept in the arc and > 7.5  No direct beam impact on the new aperture is expected also in case of the most critical MKI failure (grazing event) or mis-injection