PJM©2011 1 PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.

Slides:



Advertisements
Similar presentations
Technical Conference Avoided Cost Modeling January 6, 2015.
Advertisements

Resource Adequacy in PJM
NERC’s Long-Term Reliability Assessment (LTRA) Workshop: Natural Gas Dependency in New England Michael I. Henderson ISO New England Inc.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.
PJM© PJM as Part of the Eastern Interconnection KEY STATISTICS PJM member companies 750+ millions of people served 60 peak load in megawatts.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Montana Ambassadors Helena, Montana February 25, 2011.
Wind Energy in Maryland. Onshore Utility Scale MEA continues to work to facilitate development of utility scale wind energy projects in Maryland. The.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
The Value of Electric Transmission NASUCA Mid-Year Meeting June 25, 2012.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
PJM©2009www.pjm.com Council of State Government’s 50 th Annual Meeting EV Infrastructure Ken Huber PJM Senior Technology & Education Principal August 16,
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
WESTERN UNDERGROUND COMMITTEE 2015 Spring Conference 65 th ANNIVERSARY 1950‐2015 Welcome Remarks Bill Chiu Director of Engineering – T&D Southern California.
PJM © APEx Annual Conference Audrey A. Zibelman EVP and COO PJM Interconnection October 31, 2005.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
OSC Meeting April 27, Transmission Cost Allocation Overview.
Joe Polidoro, Sr. Engineer PJM Interconnection, LLC Grid of the Future: Integrating Load Response into the Markets.
PJM©2009www.pjm.com Implications of Electric Transportation for the National Grid Ken Huber PJM Interconnection February 19, 2010.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
PJM©2013www.pjm.com Deployment of smart-grid technologies – Technology and market challenges Stu Bresler VP, Market Operations PJM Interconnection University.
PJM© Welcome to PJM. PJM© Today’s Agenda 1.Introductions 2.PJM Overview 3.State and Federal Regulation Steve Boyle.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
Review of CAISO Wholesale Electricity Market Trends APEX Sydney Conference California Electricity Wholesale Market Trends October 13, 2008 Anjali Sheffrin,
Updated 1/28/2011.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
PJM©2015 ATTACHMENT TO TESTIMONY OF ANDREW OTT OHIO ENERGY MANDATES STUDY COMMITTEE MARCH 18,
Transmission Issues & Renewables Perspectives of a Wind Developer.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
PSE&G Confidential1 PSEG Electric System Overview Mackington Joseph, MSM, PhD.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
What’s happening in Spain? Access to the grid request of STE projects by Oct MW.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
CALIFORNIA ENERGY COMMISSION Why Peak Demand Offset Measures Are Necessary When There Is “Enough” Energy Lorraine White Advisory to Vice Chair Pfannenstiel.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
PJM©2013 Cyber Threats to the Electric Power Grid Steven McElwee October 16, Copyright © 2013 by PJM Interconnection, LLC.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
COMPARISION OF PJM AND INDIAN GRID. PJMINDIAN GRID.
PJM: Managing Grid Evolution Through Markets
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
North American Markets Status
Massachusetts Electric Restructuring Roundtable
Evolving Economic Dispatch in SPP
Transmission Planning at PJM Interconnection LLC
Andrew Ott, President & CEO PJM Interconnection
SunZia Project Description
Hot Topics in PJM: Price Formation and Public Policy
2018 RTEP Report Key Maps, Tables & Figures
Presentation transcript:

PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General Manager, System Planning PJM

PJM© PJM’s Role Ensures the reliability of the high-voltage electric power system Coordinates and directs the operation of the region’s transmission grid; Administers a competitive wholesale electricity market; Plans regional transmission expansion improvements to maintain grid reliability and relieve congestion.

PJM© PJM as Part of the Eastern Interconnection with ATSI Integration KEY STATISTICS PJM member companies 700+ millions of people served 58 peak load in megawatts 158,448 MWs of generating capacity180,400 miles of transmission lines 61,200 GWh of annual energy 794,335 generation sources 1,365 square miles of territory211,000 area served 13 states + DC Internal/external tie lines % of generation in Eastern Interconnection 27% of load in Eastern Interconnection 19% of transmission assets in Eastern Interconnection 20% of U.S. GDP produced in PJM As of 6/1/2011

PJM© What is the PJM Interconnection Queue? The PJM interconnection process utilizes a queue system to prioritize requests from developers to interconnect to the system Developers enter the queue and are studied for impacts to the system Queues are “open” for a 3 month period –Generation, Merchant Transmission, and Long-Term Firm Transmission Service Queues are Fully Integrated Specific Rights Based on Queue Position and Satisfaction of Milestone Requirements –Projects with earlier queue positions have first right to any existing system capability Required Transmission or Distribution Upgrades Based on Reliability Criteria – paid by developer

PJM© Interconnection Request Studies ISA/CSA Implementation ISA/CSA/WMPA Execution Commercial Operation Note: Projects May Drop Out of the Queue at any Time Feas Imp Fac Interconnection Request Process

PJM© Projects Listed as Active in the Queue

PJM© Proposed Generation (MW) – Renewables 36,376 / 59% As of January 4, 2011