Gas Development Master Plan

Slides:



Advertisements
Similar presentations
University of Glasgow Major Capital Projects Project Governance Gateway Process.
Advertisements

A Pathway for Mozambique: From Reserves to Production to Prosperity
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
1 INDONESIA GAS/LNG DEVELOPMENT POLICY BY : DIRECTORATE OF PROCESSING AND COMMERCE DIRECTORATE GENERAL OF OIL AND GAS REPUBLIC OF INDONESIA APEC EGCFE.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 GDMP Overview.
版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
DFID Work on Extractive Industry Reforms in Africa
1 Indonesia: Macroeconomic Update and Progress on Structural Reforms October 25,
Addax … The Act … The Bill … & The Plan PETAN Panel Discussion Offshore Technology Conference Houston, Texas May 4, 2010.
Center for Strategic and International Studies – CCS event 31 st March 2008 Rachel Crisp Deputy Director, Cleaner Fossil Fuels Unit, Energy Group.
Prior activities of FEWE Under the bilateral and multilateral co-operation, several projects to support the rational energy use in different sectors.
Valhall development timeline. Licence award Licence award: The Valhall block 2/8 was among the more attractive in the first offshore licensing round announced.
XVIII CONGRESO DEL IIDM and MLA FALL MEETING Puerto Rico ALESSANDER LOPES PINTO.
Changing Alaska's Oil and Gas Production Taxes: Issues and Consequences Matthew Berman Professor of Economics Institute of Social and Economic Research.
ZPC – Power and Energy Projects
Helix Energy Solutions Group, Inc. (HLX) NYSE Recommendation: BUY Price (10/3/14): $21.55.
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
NATURAL GAS. What is it? Waste product produced by bacteria and enzymes that break down organic matter Mostly methane (CH 4 ) with a small amount of other.
1 Fiscal Federalism in Iraq: OIL and GAS. The oil situation: a snapshot.
CO 2 Sequestration Options for California Larry Myer WESTCARB Technical Director California Energy Commission (916) ; ETAAC.
NATURAL GAS. What is it? Waste product produced by bacteria and enzymes that break down organic matter Mostly methane (CH 4 ) with a small amount of other.
 Dr. Ibrahim Togola The challenges of African Energy Policy in the 2010 Berlin,14th June 2010.
‘Shale’ Natural Gas A Global Warming Solution Jeffrey McManus Chesapeake Climate Action Network.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Gas Development Master Plan Scenarios for the GDMP Capacity Building Workshop Bali, 1-2 July 2013.
An Introduction to the Role of Carbon Capture and Storage in Ukraine Keith Whiriskey.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Mitigating the Social Impact of Oil Operations 18th World Energy Conference Eleodoro Mayorga Alba World Bank October 22, 2001.
Part 1.3 Mineral Rights & Leasing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 Draft Policy Note 1 : Overview of Gas Resources and Potential.
Development Partners meeting, April 9, 2013 Natalia Kulichenko-Lotz World Bank.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 Draft Policy Note 4 : Policy Support for the Development of Domestic Gas Markets.
Prospects, issues, and implications of gas exploration in the Eastern Mediterranean Focus on energy developments and commercial dynamics in Cyprus Prepared.
Improvements to Service Provisioning Platform Deployment Process Master’s Thesis – Matti Jylhä Supervisor: Professor Jorma Jormakka.
REGULATORY FRAMEWORK ON OIL & GAS SECTOR by B.S. NEGI Member Petroleum and Natural Gas Regulatory Board, India 1.
By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does.
Development of renewable energy A chance and a challenge for Poland.
© Cengage Learning – Purchasing & Supply Chain Management 4 ed ( ) Practice 19. Public procurement and EC directives.
UKCCS/003/001 - PRE098 - SEGEC Norway Visit - SP ACC Collaboration - 13 Oct 08.ppt CCS & Technology Development Group Carbon Capture and Storage Scottish.
Damage and Losses Evaluation in Cases of Disasters An Introduction to the ECLAC methodology J. Roberto Jovel, Consultant.
Does high oil price lead to increased oilrig activity? An empirical analysis Guro Børnes Ringlund, Knut Einar Rosendahl and Terje Skjerpen.
Joint Venture Agreements. Joint Ventures Joint Venture (JV) : Two or more construction contractors jointly competing for a particular project pooling.
OMV Gas Move & More. Investing in SEE – OMV´s Approach for the Region Athens, November 3rd, 2005.
Conflict Between Economic Development and Environmental Protection Jim Ryan SPC.
Public Private Partnership + EU Funds in Poland general overview and the future outlook.
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING.
Philip Lloyd, CPUT Rob Jeffrey, Econometrix.  Eskom must grow if our economy is to grow  Many decisions about Eskom’s operations in recent years have.
Solution To Wasted Gas: Flaring And Associated Gas In Nigeria
Developing Africa’s energy potential and integrating power supply systems for sustainable development in African countries (case of Niger)
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR COUNTRY October/20/2015 CSF, Brussels BETTER RESEARCH, BETTER POLICY, BETTER REFORM
Receivables Management For Management Related Notes and Assignments, Visit
R&D STRATEGIES IN SUPPORT OF INDUSTRIAL TRANSFORMATION Arm.Dpt. ROMANIA MINISTRY OF DEFENCE ARMAMENTS DEPARTMENT 01 November 2007.
MINING AND INFRASTRUCTURE INDABA 2015 ZPC PRESENTATION Presented by: N.F. Gwariro (MD)
Can Carbon Capture and Storage Clean up Fossil Fuels Geoffrey Thyne Enhanced Oil Recovery Institute University of Wyoming.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Source: Energy Information Administration
NPC Study on Prudent Development of North American Oil and Gas Resources Resources and Supply Task Group - Framing Questions Oil & Gas Resources: What.
BRIEFING ON SCHOLAR TRANSPORT TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON TRANSPORT By Mr George Mahlalela Director General 12 April April 2011.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
Indonesia Deep Water Development from West to East Present Indonesia Deep Water Blocks Development (Courtesy of
Oil and Gas Training Lusaka April 2016.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
Health and Safety Executive Health and Safety Executive The Regulatory Framework for UCG– HSE’s perspective Tony Almond Redacted Health and Safety Policy.
NATIONAL ROADS IMPROVEMENT AND MANAGEMENT PROGRAM (NRIMP) GAC LESSONS & CASE STUDY Siele Silue Senior Transport Specialist GAC Workshop, 11/30 – 12/1.
Presentation to the Portfolio Committee
HIGHLIGHTS OF UPSTREAM GOI POLICIES
EU action after Deepwater Horizon accident - Gulf of Mexico – April 2010
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
© 2016 Global Market Insights. All Rights Reserved Subsea equipment Market trends research and projections for 2019 – 2025.
Presentation transcript:

Gas Development Master Plan Steering Committee Meeting – 28 March 2013 Draft Policy Note 2 : Impediment to Developing Gas Reserves

Outline Overall gas balance Infrastructure as an impediment Other impediments CBM Fiscal terms Potential for subsea wells Recommendations

Overall gas balance

Overall gas balance 2012-25

Infrastructure

NAD region example – wrong operator, wrong technology, wrong fiscal terms Jau field (ENI) 200 bcf 600-650 m water depth 45km from NSO platform

The tendering process… Kepodang offshore field on the Muriah licence originally discovered in the 1980’s in 230 feet of water. The licence was taken over by Arco in 1999 who signed a memorandum of understanding with PLN for supply to the Tambak Lorok combined cycle power in Semarang The 1060MW Tambak Lorok power station was completed in 1998 and can run on diesel or gas Petronas of Malaysia took over the licence in 2005 and signed a gas sales agreement with PLN to supply 145 MMSCFD of gas for ten years. Petronas were intending to construct a 200km pipeline from the field to shore. However the private company Bakrie and Brothers had won the tender to construct a main pipeline from Kalimantan to Java.

The tendering process… Bakrie successfully argued in 2009 that as the planned Kepodang line would run in parallel to the line and that they had the licence for that route that they, rather than Petronas should provide the offshore transportation of the gas and operate it as Phase 1 of their longer pipeline system. Eventually in 2012 an overall development plan was agreed which incorporated Petronas developing the field and Bakrie providing the offshore transportation. Petronas is developing the field at a total cost estimated as $545 million. Production is now planned to start in October 2014. Bakrie are constructing the pipeline at a cost of around $175 million. The project has effectively been delayed by three years due to the lack of resolution of the transportation issue. The Petronas production sharing agreement was to expire in 2021. As a consequence of this the government extended the production sharing agreement to 2025.

Jawad Barah region – the cost of failure running Tampak Lorok 1000 MW on diesel

Pertamina Gundih fields – a technical problem

The technical problems Pertamina onshore gas development taking place which illustrates some of the technical problems in some Indonesian gas fields. Three fields are to be developed through a central processing plant (CPP) . However the fields contain around 21% carbon dioxide which is reduced to 15% once the fields are processed through the CPP. It is then required to inject the carbon dioxide in a suitable reservoir. Recent study indicated that one reservoir was not completed sealed and could result in carbon dioxide leakage. The other potential reservoir was of insufficient size to store the required amount of carbon dioxide. At this stage, therefore, there is no technical solution to the safe disposal of the carbon dioxide.

Jawa Timur region – successful developments Access to pipeline infrastructure Large reserve basis Productive wells Access to large customer base

Tirang Sirasun Batar

BD Gas field development

Kalimantan – supply shortage?

Kalimanatan – the problem of contract expiry and new technology but CBM has a role The existing supply shows a very steep decline. However there is still significant potential for additional recovery in the existing Tunu field. However this additional recovery would require significant additional investment in new platforms and wells. As the licence expires in four years time, this will not allow recovery of this investment by the current owners. There is a huge potential through the development by Chevron of five gas fields in very depth water called the Indonesia Deepwater Development. The Bangka field in 3,200 feet of water would be tied back to the existing west Seno Floating Production Unit. There is significant potential in the longer term for coal bed methane (CBM) projects to be further developed in Kalimantan with initial production having started in 2011

Mahakam licence…

Chevron Deepwater Development

CBM commitment wells

CBM impediments The main impediments to the successful development of an Indonesian CBM programme appear to be the following: An number of the blocks have been awarded to companies without the financial, technical or operational capacity to carry out the work programme commitments There is limited availability of purpose build CBM drilling rigs with conventional rigs being expensive to use and there is a shortage of coring and formation evaluation services Land use applications are slow to be resolved and access to some areas (such as forests) is difficult There is no dedicated government authority for CBM and the recent constitutional court ruling has further delayed the provision of such an authority

Indonesian fiscal terms – the model field The field that is modelled is similar to the offshore Kepodang gas field currently being developed by Petronas in the Muriah block off Central Java. The hypothetical field is around 180 km from shore and is in water depths of 70 metres and has reserves of 400 bcf. The field has a central processing platform and wellhead platform. Total capital investment including exploration is $645 million

Profit sharing

Government take comparison

Subsea wells

Policy Recommendations The continued delay in the completion of the Kalimantan-Java pipeline has contributed to a gas shortage in Java. It has also prevented the development of fields on the route of the pipeline meaning that expensive oil rather than gas has been used in a major power plant. The Government should undertake an immediate investigation into the failure of the tender process in getting this pipeline constructed. The Government has failed to develop a workable policy on how to deal with contract expiries. As Indonesia was the first country to use PSC arrangements it is not surprising, therefore, that it is the first country to have to deal with their expiry. The failure of the Government to deal with this issue has led directly to a reduction in development with a resultant reduction in gas production. Resolution of this issue should be an immediate requirement of the Government

Policy Recommendations The major companies are particularly strong in delivering complex massive developments. However they are weak in developing smaller incremental reserves adjacent to their major developments. The Government should consider re-licensing undeveloped discoveries to independent international companies as well as to local companies with sufficient technical and financial resources. There appears to be a lack of use in modern technology such as subsea wells in Indonesia. The Government should consider setting up a specific technical institute to support the development of this type of work.

Policy Recommendations Although in general the Consultant has found that Indonesian fiscal terms are regionally competitive it should consider where appropriate in offering better terms for particularly difficult projects such as those involving gas with a high CO2 content. The Consultant is proposing that a dedicated Government authority for CBM be set up both to support this emerging industry but also to resolve development issues