Waste Management Ottawa Renewable Energy Workshop West Carleton Environmental Centre April 8, 2011.

Slides:



Advertisements
Similar presentations
Anaerobic Digestion PAK RENEWABLE ENERGY
Advertisements

Buckeye Wood Energy Converting Waste Wood Into Energy.
Renewable Energy from Landfill Gas. Corporate Overview Headquartered in Houston, Texas Operations in 47 states, District of Columbia, Canada and Puerto.
Methane Capture and Use: Current Practices vs. Future Possibilities.
Inert Gas Purification Systems Why do we need them??? Many of the materials used in research and development today are extremely air sensitive, and can.
Biogas typically refers to a gas produced by the biological breakdown of organic matter in the absence of oxygen. Biogas is comprised primarily of methane.
Anchorage Regional Landfill Landfill Gas-to-Energy Project
Water and Wastewater Focus Wireless Sales Push 2009.
DISTRICT HEATING: AN OVERVIEW PRESENTED BY: NIELSEN SYSTEMS APRIL 8, 2011.
Seneca Meadows: The First Landfill Gas-to- Vehicle Fuel Project in New York State Richard M. DiGia President EIF Renewable Energy Holdings Novi, MI - Oakfield,
Michael Carleton Paul Gosselink. Basic Positions of TxSWANA and Denton & Garland Strongly encourage PUC to adopt rules that will encourage the development.
Landfill Gas to Liquid Fuels Ryan Kent Kirk Jaunich Tyler Stewart Zachary Kerbo University of South Florida Chemical & Biomedical Engineering Department.
Landfill Gas 101 HALTON REGION Public Works - Waste Management Services May 15, 2014 – MWA Spring Workshop, Hockley Valley Resort Presented by: Art Mercer,
Waste Management Leading Our Industry in Conversion to CNG May 24, 2013.
Rodefeld Landfill Dane County, Wisconsin Mark J. Torresani, P.E. Cornerstone Environmental Group, LLC Michael DiMaggio Dane County, Wisconsin Natural Gas.
Utilization of Landfill Gas towards High-BTU Methane and Low-Cost Hydrogen Fuel by Manolis M. Tomadakis and Howell H. Heck Florida Institute of Technology.
Integration of CHP Into Waste Water Treatment Processes London 5 th November 2014 Peter Bense.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
February 12, ENGINEERING Landfills Transfer Stations Hazardous Waste Landfills Non Solid Waste Civil Design CONSTRUCTION Leachate Systems Tanks.
EcoVapor Recovery Systems
1 Experience with IR 70kW installations on LFG, will current emission performance be enough? January 26, 2005.
Intellergy Corporation Environmentally Friendly Products From Organic Resources INTELLERGYINTELLERGY.
Darden School Social Responsibility and Entrepreneurship April 2, 2007 Recycling Energy: Profitably Mitigating Climate Change Tom Casten Chair, Recycled.
Anaerobic Digestion: Turning One Man’s Trash Into Another Man’s Treasure January 20, 2009 Dr. Catherine Keske Dr. Sybil Sharvelle.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
Chris, Stephanie, Kyle, Mariam
Introduction to “Conventional” Natural Gas Kenneth M. Klemow, Ph.D. BIO / EES 105 at Wilkes University.
FOSSIL FUELS II NATURAL GAS. Natural Gas Vehicles (2009)
Proprietary work product, not for reproduction 1 BIOMASS GASIFIER 20 MW POWERPLANT Energy & Environmental Integrators Note! This system can be scaled from.
Biomass is a biological material derived from living, or recently living organisms. biomass can equally apply to both animal and vegetable derived material.
Sohail Ghanchi Energy Technology and Policy The University of Texas at Austin.
Small Scale Biogas Upgrading Experience in Kalmari Farm, Finland
Natural Resources.
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
Natural Gas PRESENTED BY SARAH SHAQUOYA & NICK. Questions to Consider  Where are the nonrenewable sources of energy located?  How easy is it to gain.
Co-Generation: Today’s Reality Larry McFall Plant Operations Manager Rock River Water Reclamation District Rockford, IL
Sustainable Alternatives In generating power for chemical plants.
Renewable EnergySection 2 Bellringer. Renewable EnergySection 2 Alternative Energy To achieve a future where energy use is sustainable, we must make the.
1 MWMA Annual Meeting March 5, 2001 Shelley Cohen Landfill Methane Outreach Program Discover the Power Potential of Landfill Gas.
……“Delivering Green” WeCare Organics LLC 9289 Bonta Bridge Road Jordan, New York
Page 1 Landfill Gas to Energy Clark Wiedetz General Manager Alternative Energy Program Overview Division: Energy & Environmental Solutions.
Coal. What is coal Coal deposits come from many epochs, but the best and most abundant are from the forests in the warm, swampy river deltas of the Carboniferous.
Benefical Use of Digester Gas Point Loma Wastewater Treatment Plant Industrial Energy Association April 8, 2015.
Introduction to “Conventional” Natural Gas Kenneth M. Klemow, Ph.D. BIO / EES 105 at Wilkes University.
Renewable Biogas: Pipeline Biomethane for California Southern California Alliance of POTWs Energy Management Committee October 22, 2009 Steve Hruby Southern.
Anaerobic Digesters Key Considerations in Feasibility.
ENERGY RECOVERY ASSOCIATES PurGas™ RENEWABLE SOURCE PIPELINE METHANE presented by 6 th. Annual LMOP Conference Washington, DC, January 6-7, 2003.
Hanock Megenta 8 th Hour. What is Alternative Energy?  Alternative Energy is the use of non- conventional energy sources to generate electrical power.
ALTERNATIVE FUELS. Alternative Fuels Non-conventional or advanced fuels Are any materials or substances that can be used as fuels, other than conventional.
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Biogas Digester Jeff Rohrer APES March 19, 2012.
Khalid Aldhahri Omar Alrajeh Daniel Marken Thomas White CLEAN AIR POWER ASU with Oxy-fuel Combustion for Zero Emission Energy University of Wyoming College.
Boiler Operations, Maintenance and Performance Conference.
PSA PLANT OXYGEN GENERATION SYSTEMS. 1. PSA Description 2. Molecular Sieves 3. Process ( Adsorption and Desorption) 4. Application for PSA process 5.
Copyright 2013 Coker Composting & Consulting Markets for Recycled Organic Wastes VRA 2013 Annual Conference Craig S. Coker Virginia Composting Council.
Fig. 16-2, p. 357 Oil and natural gas Floating oil drilling platform Oil storage Coal Contour strip mining Oil drilling platform on legs Geothermal energy.
Billy MaloneSWANA TDIBR Landfills DeKalb County Sanitation Board Clean Cities-GA Sanitation Director.
ENGINEERING CHALLENGES OF SITING RENEWABLE ENERGY AT LANDFILLS Ronald Johnson, PE, GE Brownfields Conference 2011 Philadelphia, PA April 5,
Waste Management Innovation, Sustainability and Customer Value Brownfields 2011 Waste to Watts: Redeveloping Closed Landfills for Renewable Energy April.
“Compressed Natural Gas (CNG) Fueling Systems – Integrating Alternative Fuels on NJ’s Brownfield's” Chuck Feinberg - Greener By Design Michael Sylvester.
Agenda Introduction to LMOP Why LFGE Projects? LFG Applications
Summary Why Biomethane Support for biomethane What is biomethane
TriFuel Alternative Fueling Stations
CR&R Anaerobic Digestion Facility
Company MIAB - Mölnbacka Industri AB of Deje, Sweden was established in MIAB provides equipment protecting the environment by removing solvent vapours.
Methane Capture and Use: Current Practices vs. Future Possibilities
Renewable Biogas Options
Raleigh County Solid Waste Authority
It’s 2018…so What’s new with landfill gas?
CACTUS MOON EDUCATION, LLC
Presentation transcript:

Waste Management Ottawa Renewable Energy Workshop West Carleton Environmental Centre April 8, 2011

Natural anaerobic decomposition of organic waste in the landfill Natural anaerobic decomposition of organic waste in the landfill Landfill gas is about 50% methane when it is produced Landfill gas is about 50% methane when it is produced Methane is the fossil fuel component of natural gas Methane is the fossil fuel component of natural gas Landfill Gas: A Renewable Resource Page 2©2011 Waste Management Any technology or application that uses natural gas can also use landfill gas

Landfill Gas Collection Fifth level 18pt Trebuchet Page 3©2011 Waste Management < Perforated pipe wells are drilled into the waste, about one every 50 meters < The wells are connected to a header pipe. A blower places a vacuum on the header pipe to withdraw the gas. < If it is not used as fuel for a beneficial use, the gas is simply burned off in a flare

Electricity Generation - about ¾ of total industry Small power plants at the landfill, or delivered by pipeline to an off- site power plant Industrial Fuel (“Medium Btu”) – about 20% Use in lieu of fossil fuel in steam boilers, cement kilns, heating, leachate evaporation, greenhouses, etc. Natural Gas (“High Btu”) – about 5% (25+) Clean to natural gas specifications, compress, and insert into a natural gas pipeline LNG/CNG Vehicle Fuel – 3 Clean to fuel specifications, compress or liquefy, and store in on-site fueling station or haul to off-site fueling station Types of Landfill Gas Projects Page 4©2011 Waste Management

YearNo.YearNo YTD LFG to Pipeline Quality – Project History Page 5©2011 Waste Management

LocationTypeDeveloperOutput/DayStartStatus Puente Hills, CACNGLA County1,000 GEG1993? Bowerman, CALNGPrometheus5,000 LNG Gal2006Inactive Sonoma Co., CACNGSCS Energy500+ GEG2008Pilot Columbus, OHCNGFirmGreen700 GEG2008Inactive Altamont, CALNGLinde/WM 13,000 LNG Gal2009Active Dane Co., WICNGShaw100 GEG2011Active Known LFG to LNG/CNG Projects Page 6©2011 Waste Management

Typical Ranges Methane45% - 55% CO235% - 45% Nitrogen4% - 12% Oxygen0.2% - 3% Moisture4% - 6% H2S20 - >1,000 ppm Siloxane5 – 200 mg/m3 NMOCs20 – 500 ppm Landfill Gas Constituents Page 7©2011 Waste Management Methane content is decreased as air is drawn into the collection system. The amount of air intrusion varies with the quality of the well field, priority of operations for odor control and compliance, moisture level of the waste, type of final cover, etc. Other constituent levels vary with the type of waste in the landfill

Product Specifications Page 8©2011 Waste Management ConstituentLFGNGCNG FuelLNG Fuel Methane45 – 55%> 96%> 88%> 96% CO235 – 45% < 5% < 50 ppm <5% Nitrogen4 – 12% Oxygen0.2 – 3%< 0.2 – 0.4%< 1%< 0.1% H2S 20 - >1000 ppm < 4 ppm< 16 ppm Siloxanes 5 – 200 mg/m3 ND to No Spec ND

Dry process: Applicable to lower sulfur loads Lower capital, high expense for replacement of media Wet process: Applicable to higher sulfur loads Higher capital, lower expense Biological: Applicable to higher sulfur loads Higher capital, lower expense Hydrogen Sulfide Removal Page 9©2011 Waste Management

Adsorption of siloxane on activated carbon, activated graphite, or mixed beds comprised of alumina, silica gel, or proprietary media Typically multiple beds purged sequentially (pressure swing adsorption) Siloxane Removal Page 10©2011 Waste Management

Two Design Criteria Recoverability: the percent of methane recovered from the landfill gas and available for sale. Low recoverability results in a lower revenue for the project Purity: the methane concentration in the product gas that must meet the appropriate specifications Multiple stages or multiple technologies are used to maximize recoverability and purity CO2 Removal Page 11©2011 Waste Management

Zeolite selectively adsorbs CO2 via controlled pore sizes, so larger CH4 particles pass through Multiple beds which are consecutively filled and purged by depressurizing (PSA) High purity (97%) with a single stage Second stage may be used to increase recoverability Also removes about half the oxygen and 10% of the nitrogen, which are similar in size to methane Molecular Sieve – Pressure Swing Adsorption Page 12©2011 Waste Management

Solution-diffusion through a non-porous membrane CO2 permeates quickly and pass through the membrane. Methane permeates slowly and bypasses the membrane. Single stage can have high purity or high recoverability, but not both Multiple-stage design combinations to achieve purity specification at acceptable recoverability Does not remove oxygen or nitrogen, but does remove H2S Membranes Page 13©2011 Waste Management

Many developers require the landfill owner to operate the gas collection system to maintain nitrogen contents low enough to meet the product specifications. WM avoids this approach because of the constrictions placed on compliance and odor control. Nitrogen removal adds significant capital cost. Suppliers have developed adsorption beds capable of removing nitrogen Nitrogen Removal Page 14©2011 Waste Management

MOLECULAR SIEVE SULFUR TREAT MEMBRANE SKID LIQUEFACTION LNG STORAGE Altamont LFG to LNG CH4 = 46% N2 = 12% CO2 = 37% O2 = 1.3% H2S = 100 ppm H2O = 3.4% VOC = 0.3% High BTU Fuel > 96% Methane

Capital cost is $2500 to $4000 per scfm of LFG. Most projects require 1500 to 3000 scfm of LFG Total costs range from $5 million to $20 million depending on size, LFG quality, nitrogen removal, liquefaction for LNG WM’s cost for Altamont LNG plant was $15.5 Mil. Production cost is in the $4 to $7 per mmbtu Equates to about $0.60 to $1.00 per DEG Economics Page 16©2011 Waste Management

LFG quality specs conflict with LFG collection system operations Cost to produce is about $4 to $7 per mmbtu, about the same or more than natural gas: why invest the capital? Most incentives for LFG are targeted to electricity Premium is available to renewable gas that is put in the pipeline and sold to utilities, who can claim renewable energy credits. Value may be more than fuel incentives. Most areas do not have widespread use of CNG/LNG vehicles or fueling stations Barriers to LFG to CNG/LNG Development Page 17©2011 Waste Management

Industry trend toward more CNG trucks, with fueling stations to support CNG fleet, resulting in a broader market for CNG sales. Some geographic areas have higher retail cost of CNG due to local market pricing, transportation cost, and taxes. There is value to controlling future availability and price of fuel Emerging market in US for renewable fuel credits (RINs) By meeting pipeline specs, LFG can be sold to CNG suppliers through existing pipelines, providing flexibility in delivery, production, and type of incentive There appear to be opportunities for development in selected market areas with appropriate incentives Considerations for Development Page 18©2011 Waste Management