B2B Phase 2 – ILM Historic Data ( Field Operative Efficiency & Effective Report) Mick Williams/Jim Jackson 16th September 2013.

Slides:



Advertisements
Similar presentations
EICC Working Hours Taskforce KPI Scorecard
Advertisements

Atyrau Oil and Gas Event
Developed by: Connecting For Health Informatics Capability Development November 2011 Mobile Working in Community Services The Case for Change.
Professional Performance in Engineering Russell Scott Member PPIR Project Steering Committee Deputy President, IChemE Director, Uhde Shedden Australia.
SERVICE DELIVERY MAV Planning Improvement Conference Melbourne Water 17/10/14.
Service Management Global Network Operations CWU and Prospect Q1 business review Marc de Wit.
Strengthening Foundations
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
CWU Blueprint for the future of Deliveries The Outdoor Dept.
The University Library. slide1 Alma: a driver for organisational change Alison Little – Alma Project Manager Lynn Sykes – Head of Customer Services The.
LINks Forum PTS Update ‘Care Driven Quality’. Care Driven Quality Deliver a patient-focused, high quality, efficient PTS underpinned by key performance.
Mobile Resource Manager v2. Core Pillars  Engine - High fuel costs, vehicle maintenance  Productivity - Customers expect increasing levels of service.
TRANSFORMING CAPABILITY SUPPORT MATERIALS HUMAN RESOURCE MANAGEMENT FOR INNOVATION The Photonics Experience Case Study Introduction The Photonics case.
The Health Roundtable 3-3b_HRT1215-Session_MILLNER_CARRUCAN_WOOD_ADHB_NZ Orthopaedic Service Excellence – Implementing Management Operating Systems Presenter:
AUDIT COMMITTEE FORUM TM ACF Roundtable IT Governance – what does it mean to you as an audit committee member July 2010 The AUDIT COMMITTEE FORUM TM is.
Introducing the New College Scheme Seevic Performance Appraisal.
Ch Copyright 2007 Prentice Hall Chapter 1 The Nature of Strategic Management Strategic Management: Concepts & Cases 11 th Edition Fred David.
Supply Chain Development A step-change in Supply Chain performance 08/08/2015 OFFICIAL 1 Supply Chain Focus Group – 17 th September 2014 Vic Carlill.
Introduction to Agile.
Reliability Through Maintenance Planning and Scheduling Brad Simpkins MillerCoors Maintenance Process Manager MBAA-Rocky Mountain District Meeting March.
Winter Planning in Dumfries and Galloway. CHP involvement Dumfries and Galloway has single CHP covering acute, community and mental health settings Historically.
The Lean Sourcing Process
Meeting the Needs of the Customer: to ISO 9001 Standards Michael Donohoe, Operations and Systems Manager (CYQ)
Deductive Data Analytics Creating relevance through data mining Kris Marshall – ICE 2015.
In Strictest Confidence Flexible Resource Unit (FRU)
Overview of the IT 3 Initiative CONFIDENTIAL Discussion Document September 2008.
Introduction and Overview ‘TfL and the Primes MOU’ Tessa Staniforth Health, Work and Welfare Reform Nov 5 th 2012 Andrea Fozard Supplier Skills Project.
Chapter 1 The Nature of Strategic Management. Art & science of formulating, implementing, and evaluating, cross-functional decisions that enable an organization.
How BT uses social media with internal communications Mark Morrell – BT Intranet manager
Research Data Standards Peter Knight Deputy Director – Research Information and Intelligence 3 rd September 2013 DH – Leading the nation’s health and care.
The Future of gps technology
Exel Computer Systems SME 2014 presentation Engineer Scheduling “Get it right, first time & every time”
Activity-Based Costing (ABC). Our Clients Often Lack an Understanding of Profit Factor Trade Offs Needed for Decision Making As – Is Decision Making…
Copyright ©2009, Oracle and/or its Affiliates. All rights reserved. 1 Enterprise Project Portfolio Management Value, Visibility, Agility and Accountability.
HSCVF Support Package. Delivery agencies A highly experienced, third sector focussed team Extensive experience in capacity building, volunteering, health.
© 2002 IBM Corporation 1 315CSC323 BIT Final Year Project “The Idea”
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Hospital Operational Standards Jennie Hall, Chief Nurse Dr Ros Given-Wilson, Medical Director Martin Wilson, Director of Delivery and Improvement.
Duncan Gerrard Director of International Sales An Operational View (Not Technical ) APD Communications APD COMMUNICATIONS.
1 Union framework. The BT Way for Continuous Improvement is part of Organisational Health and is a zone within the Leadership and Core Skills faculty.
+ OTC Derivative Clearing Summary Making Great Ideas Become Reality”
© British Telecommunications plc Senior Engineer Review Field, Plan and Build.
Career Model Framework
4/24/2017 Health and Social Care Reform in Greater Manchester Developing a commissioning strategy for Primary Care Rob Bellingham — Director of Commissioning.
Introducing Project Management Update December 2011.
Service Delivery Quality Management SDQM. © British Telecommunications plc Agenda Intro / Why do we need to further define Quality check standards? What.
Event jointly staged by Ellie Grebenik Co-wheels.
Fleet Management Solutions Powered by Ctrack AJ Shaw.
All rights reserved | Phone: | Website: © 2004 Accenture All Rights Reserved.
An Overview of the Smart Metering Programme in GB.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Day Plan. Agenda Objectives 30 days 60 days 90 days Plan Measurement.
PROTECTING THE INTERESTS OF CONSUMERS OF FINANCIAL SERVICES Role of Supervisory Authorities Keynote Address to the FinCoNet Open Meeting 22 April 2016.
A year in the life of a team coach Joanne James Head of Corporate and Executive Development Newcastle Business School.
Prevention & Protection SAME ENDS DIFFERENT MEANS? THE FUTURE STRUCTURE AND PURPOSE OF CFOA’ s PREVENTION AND PROTECTION ACTIVITIES.
The Strategy Map Presentation Templates
Knowledge for Healthcare: Driver Diagrams October 2016
Programme Management Board
CAPACITY BUILDING PROGRAMME ON BOARD INDUCTION AND EVALUATION
Title of the Change Project
Responding to Barker – HMT perspective
Program Control Services – Overview
Asset Governance – Integrated Strategic Asset Management
2016 Procurement Framework Contract Management
The Benson Model: School Nursing
Core Values.
The future for plant hire… the Hewden perspective.
Agility Business Management System
Presentation transcript:

B2B Phase 2 – ILM Historic Data ( Field Operative Efficiency & Effective Report) Mick Williams/Jim Jackson 16th September 2013

Introduction  B2B Phase 1 - Bi Weekly Dashboard - Daily Dashboard  B2B Phase 2 – Field Operative Efficiency & Effective Report (Historic GPS Data Reports) - Bi Weekly Dashboard 2

Field Operative Efficiency & Effective Report The primary purpose of GPS data is to capture, measure and improve service delivery metrics to enable us to improve our efficiency and effectiveness across our end to end Field Services operations. By creating an efficient organisation, carrying out work more effectively, this will allow for the further insourcing of 3 rd party work. Access to driver data is protected under the Data Protection Act and will be restricted to FLM’s and individual team members who will only have access to their own data. Data will be updated on a daily basis and will also be available retrospectively to the individual and his line manager. Commencement of National roll-out began from the 2 nd September 2013, with the official launch on the 11 th September. A Code of Practice has been produced which is intended to provide all parties with a clear straightforward understanding of the underlying principles for the ways in which the data produced by GPS will be captured, managed and utilised in accordance with industry best practice and the law and also to identify the kind of behaviours required and expected of all parties in the operation of GPS Data Reports and other associated people management processes. The Code of Practice has been agreed with the CWU.

Key Benefits The introduction of GPS data will:  Capture and measure improved service delivery data.  Optimise work allocation and capacity planning to improve customer service.  Enhance personal safety and emergency responses for team member.  Objectively identify optimum travel patterns and help us to eradicate any unnecessary travel.  Support us in ensuring that we remain aligned to industry best practice and remain ahead of competitors in our chosen markets.  Contribute to the creation of a high performance culture that is underpinned by an open, transparent and supportive performance management process.  Drive improvement in accurate booking practices by our people, ensuring information is more accurate and reliable to support meaningful and supportive performance discussions.  Ensure more efficient utilisation of fleet vehicles and reduce our carbon footprint.  Help to create wider efficiencies, bandwidth for insourcing opportunities and drive down costs.

© British Telecommunications plc 55 Why is AM GAP/Mobilisation Important ? Day 1 An engineer’s working day where he had been mobilised late. 30 mins Late Start LunchTravel Time On Site Time End of Day Non Productive Time as not enough time to complete extra task PAH Time On Site TimeTravel TimeLunchTravel Time On Site Time PAH Time Day 2 What could happen if that engineer had been mobilised on time. On this day the engineer had time to complete a Third Task. In the Day 1 example this task could have been a RFT Failure or the Controller could have had to go through many escalations to resource this job out of hours, not good for the customer, the controller or the engineer