K. Slifer, UNH g2p & the LT Spin Polarizability for the E08-027 Collaboration E08-027 June 9, 2011.

Slides:



Advertisements
Similar presentations
K. Slifer, UNH JLab Readiness Review for the E Collaboration E May 6, 2011.
Advertisements

E : Spin-Duality Analysis update Patricia Solvignon Temple University, Philadelphia Hall A Collaboration Meeting, June 23-24, 2005.
G2p/GEp Preparation Overview Jian-ping Chen g 2 p /G ep Readiness Review 5/6/2011.
Extraction of G E n at Q 2 =1 (GeV/c) 2 by Measurements of May 1, 2011 Ge Jin University of Virginia.
Low Q 2 Measurement of g 2 and the LT Spin Polarizability A. Camsonne, J. P. Chen Thomas Jefferson National Accelerator Facility Karl J. Slifer University.
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky College of William and Mary, Williamsburg VA Experimental Overview The.
General Considerations Jian-ping Chen SoLID-SIDIS Collaboration Meeting.
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky for the JLab Hall A Collaboration College of William and Mary, Williamsburg VA.
The Spin Structure of 3 He and the Neutron at Low Q 2 : A Measurement of the Extended GDH Integral Vincent Sulkosky (for the JLab Hall A Collaboration)
Jin Huang PhD Candidate, MIT For MENU 2010 May 31, Williamsburg.
Spin Structure in the Resonance Region Sarah K. Phillips The University of New Hampshire Chiral Dynamics 2009, Bern, Switzerland July 7, 2009 For the CLAS.
G2P Target installation and Beyond. Schedule Pivot before.
Richard MilnerDESY April 6, OLYMPUS Overview Motivation for the experiment Progress to date on the experiment The path forward.
Min Huang Duke University, TUNL On Behalf of the E g2p collaboration Hall A Analysis Workshop, 12/12/12.
Karl Slifer University of New Hampshire Jefferson Lab User Group Meeting 6/5/2012.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
K. Slifer, UNH The 8 th International Workshop on the Physics of Excited Nucleons May 17-20, 2011 NSTAR 2011.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
High Precision Measurement of the Proton Charge Radius A. Gasparian NC A&T State University, Greensboro, NC Outline  Previous experiments and proton size.
S PIN A SYMMETRIES ON THE N UCLEON E XPERIMENT ( E07-003) Anusha Liyanage Experiment Nuclear Physics Group Meeting Hampton University May 11, 2009.
E : Proton g 2 Structure Function Fundamental spin observable has never been measured at low or moderate Q 2 BC Sum Rule : violation suggested for.
A study of systematic uncertainties of Compton e-detector at JLab, Hall C and its cross calibration against Moller polarimeter APS April Meeting 2014 Amrendra.
Hypernuclear Physics in Hall A E Status John J. LeRose December 16, 2009.
Vincent Sulkosky Massachusetts Institute of Technology Spokespeople: J.-P. Chen, A. Deur, F. Garibaldi Hall A Collaboration Meeting December 10 th, 2012.
Rosen07 Two-Photon Exchange Status Update James Johnson Northwestern University & Argonne National Lab For the Rosen07 Collaboration.
Jin Huang PhD Candidate, MIT For Hall A Collaboration Meeting June 10, JLab.
Precision Measurement of R L and R T of Quasi-Elastic Electron Scattering In the Momentum Transfer Range 0.55GeV/c≤|q|≤1.0GeV/c* Yan Xinhu Department of.
Measurement of F 2 and R=σ L /σ T in Nuclei at Low Q 2 Phase I Ya Li Hampton University January 18, 2008.
A1n Meeting R. Michaels, May 24-25, 2012 Welcome !! Recent Activity in Hall A Schedule for Early Beam in Hall A My task list for July 1 New Hall A leader,
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
Proton Charge Form Factor Measurement E. Cisbani INFN Rome – Sanità Group and Italian National Institute of Health 113/Oct/2011E. Cisbani / Proton FF.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Jixie Zhang For g2p Collaboration Hall A Collabortion Meeting, June 2012 Status Update G2P(E08-027)
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
Measuring the Spin Structure of 3 He and the Neutron at Low Q 2 Timothy Holmstrom College of William and Mary For the Jefferson Lab Hall A Collaboration.
E97-110: Small Angle GDH Experimental Status Report E97-110: Small Angle GDH Experimental Status Report Vincent Sulkosky Massachusetts Institute of Technology.
SANE Collaboration ( E07-003) Anusha Liyanage Hampton University January 12, 2010 Measurement Of the Proton Form Factor Ratio at High Q 2 by Using The.
Hall C - 12 GeV pCDR Max. Central Momentum 11 GeV/c 9 GeV/c Min. Scattering Angle 5.5 deg 10 deg Momentum Resolution.15% -.2% Solid Angle 2.1 msr 4.4 msr.
Septum Magnets in Hall A Hall A Collaboration Meeting 6/10-11/2010 John J. LeRose.
Moller Polarimeter Q-weak: First direct measurement of the weak charge of the proton Nuruzzaman (
Spin Structure of the neutron (3He) in the resonance region Patricia Solvignon Temple University, Philadelphia For the JLAB Hall A and E Collaborations.
Vincent Sulkosky Massachusetts Institute of Technology Spokespeople: J.-P. Chen, A. Deur, F. Garibaldi Hall A Collaboration Meeting June 13 th, 2013 E97-110:
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
The EG4 Experiment: A Low Q 2 Determination of the GDH Integral Sarah K. Phillips The University of New Hampshire JLab Users Group Meeting June 9, 2009.
Vincent Sulkosky Massachusetts Institute of Technology The 7 th International Workshop on Chiral Dynamics August 10 th, 2012 Newport News, VA.
E97-110: Small Angle GDH Experimental Status Report E97-110: Small Angle GDH Experimental Status Report Vincent Sulkosky Massachusetts Institute of Technology.
Double spin asymmetry measurement from SANE-HMS data at Jefferson Lab Hoyoung Kang For SANE collaboration Seoul National University DIS /04/23.
Physics Goals & Overview K. Slifer, UNH April 18, 2011 E08-027/007 Collaboration meeting.
Update/Overview of SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting Dec , 2012.
G0 Backward Angle Request: Q 2 = 0.23, 0.48 GeV 2 Main points G0 goal is to measure G E s, G M s and G A e over range of momentum transfers with best possible.
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
Min Huang g2p/GEp Collaboration Meeting April 18, 2011.
Hall A Collaboration Meeting Slide 0 Measurements of Target Single-Spin Asymmetries in QE 3 He ↑ (e, e’) Update of QE A y (E05-015) experiment.
CLAS Collaboration at Jefferson Lab Deuteron Spin Structure function g 1 at low Q 2 from EG4 Experiment Krishna P. Adhikari, Sebastian E. Kuhn Old Dominion.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Jefferson Lab PAC 30 1 August 23, 2006 PR (Hall A) ● PR (Hall C) Measuring the Neutron g 2 and d 2 at 12 GeV PR (Hall A) ● PR
New Proposal PR : SIDIS Using SoLID and Transversely Polarized Proton Target Kalyan Allada Jefferson Lab Spokespersons: K. Allada (JLab), J. P.
Sanghwa Park (Stony Brook) for the PREX/CREX Collaboration
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
University of New Hampshire Nuclear & Particle Physics Group
Special Considerations for SIDIS
GEANT Simulations and Track Reconstruction
The np -> d p0 reaction measured with g11 data
Parity – Violating Neutron Density Measurements : PREX, C-REX
Presentation transcript:

K. Slifer, UNH g2p & the LT Spin Polarizability for the E Collaboration E June 9, 2011

Inclusive Scattering ° * When we add spin degrees of freedom to the target and beam, 2 Additonal SF needed. Inclusive Polarized Cross Section SFs parameterize everything we don’t know about proton structure

Proton g 1 also well known Unpolarized SF are very well known

0.015 < Q 2 < 30 Proton World Data Q 2 = 1.3 and 5 g2g2 not quite as good... g1g1 really well determined

0.015 < Q 2 < 30 Proton World Data Q 2 = 1.3 and 5 g2g2 not quite as good... g1g1 really well determined

E : Proton g 2 Structure Function Fundamental spin observable has never been measured at low or moderate Q 2 BC Sum Rule : violation suggested for proton at large Q 2, but found satisfied for the neutron & 3 He. Spin Polarizability : Major failure (>8  of  PT for neutron  LT. Need g 2 isospin separation to solve. Hydrogen HyperFine Splitting : Lack of knowledge of g 2 at low Q 2 is one of the leading uncertainties. Proton Charge Radius : also one of the leading uncertainties in extraction of from  H Lamb shift. BC Sum Rule Camsonne, Crabb, Chen, Slifer(contact) g 2 data strongly anticipated by theorists Spin Polarizability  LT

Experimental Technique Inclusive Polarized Cross Section differences We Need: Polarized proton target (Principals: C. Keith, D. Crabb) upstream chicane (Project Lead: T. Michalski) downstream local dump (Design: A. Gavalya) Low current polarized beam Upgrades to existing Beam Diagnostics to work at 85 nA (T. Michalski) Lowest possible Q 2 in the resonance region Septa Magnets to detect forward scattering (A. Gavalya, E. Folts)

Polarized Ammonia Target 5 Tesla Transverse Field Current = 85 nA

Moller Polarimeter Third arm luminosity monitor for cross-check(not shown). Compton will not be used.

New Beam Diagnostics for low current Slow raster for target

Up Stream Chicane 2 Dipoles to compensate for target field Magnets on loan from Hall C

Low Power Local Dump Mag field of target -> beam will not make it to hall dump

Room Temperature Septum Magnets -Used in Prex, modified with new coils. -bend 5.6 o to 12.5 o -allow access to lowest possible Q 2

Source(%) Cross Section5-7 PbPTPbPT 4-5 Radiative Corrections3 Parallel Contribution<1 Total7-9 Systematic Error Budget Statistical error to be equal or better at all kins

Goal is to measure g2p in the low Q2 region with a precision ~ 5-7% by measuring transversely polarized cross section difference = A x   Measure both asymmetries and cross sections to 4-5% In addition to statistics, we need to control total systematics to 3-5%, i. e., each system to be below that (1-3%). Main systematics for asymmetries: Target polarization (3-4%) Beam polarization (2-3%) Dilution factor/packing factor (some cancellation) Main systematics for cross sections Acceptance/optics (~3%) Dilution factor/packing factor (some cancellation) Density (2-3%) Beam charge (1-2%) Position and angle determination ( mm, degree) Detector efficiencies (~< 1%) Background (pions, …) (1%) Radiative corrections (including radiative tails) (1-4%) … Experimental Goal/Considerations slide courtesy of JP Chen

Readiness Review May 6, Full Report available at:

Physics Manpower Faculty and Staff (near fulltime effort) Alexandre Camsonne (JLab): Beam line, DAQ, … Jian-Ping Chen (JLab) : Project manager, overall coordination. Don Crabb (UVA) : Target Expert. Karl Slifer : Contact Person onsite fulltime summer, fall, and ½ of spring. *For these slides, I’m not counting E manpower Guy Ron, Doug Higinbotham, Ron Gilman, Donal Day, John Arrington, Adam Sarty......

Pengjia Zhu USTC Min Huang Duke Melissa Cummings W & M Ryan Zielinski UNH Toby Badman UNH Chao Gu UVa E Grad Students + Temple student?

Jixie Zhang JLab Geant 4, Optics James Maxwell UNH Target, Spin Structure Kalyan Allada JLab Beamline, 3 rd Arm E Post-Docs + Post-Docs (Part-time effort) Hovhannes Baghdasaryan (UVa) Narbe Kalantarians(UVa) Sarah Phillips (UNH) Xiaohui Zhan (Argonne)

People Power and Tasks Overall coordination: Project manager (Jian-ping Chen, Hall A) Project coordinator for beamline (Tim Michalski, engineering division) Collaboration contacts: Karl Slifer (g2p), Guy Ron (GEp) Beamline Engineering Division/Accelerator Division (Tim Michalski coordinator) Engineer/design (Butch Dillon-Townes) Installation (Neil Wilson) Instrumentation/magnets/vacuum/alignment/software/radcon groups, as identified in 6-month-down schedule/planning Users (Alexandre Camsonne and Pengjia Zhu) on BCM/BPM/Slow raster… Target Target Group (Chirs Keith) UVA(Don Crabb, Donal Day, psotdocs and students) New Hampshire (Karl Slifer, James Maxwell) Other postdocs/students Hall A engineering/design: Septa/LC Dump/Pivot Layout … Hall A engineering/design team (Robin Wines, Al, Gavalya) With input from the collaboration Hall A installation Hall A installation team (Ed Folts) Simulation/optics/HRS/detectors/DAQ/3 rd Arm Users(Physicists/postdocs/students) slide courtesy of JP Chen

Main Items, each has it’s schedule and milestones (separate talks) Beamline Target Hall infrastructure, beam dump, septa Installation May, 2011, Main design complete. End of May, 2011 Target magnet cool-down in EEL July, 2011, Parts manufactured and arrived Aug 3, 2011, Beamline region 1 installation complete Aug 16, 2011, Beamline region 2 installation complete Mid-late Aug, 2011, Target test in EEL Sept 1, 2011, Septa, LC beam dump, scattering chamber installed. Sept 1, 2011, Target move to Hall A for installation Sept 15, 2011, Beamline region 3 installation complete Oct 1, 2011, Dump/target/magnet/chamber alignment complete Oct 10, 2011, Beamline alignment complete Nov 14, 2011, Target cool-down/polarize Nov 19, 2011, Experiment Commission Starts Jan 23 – March16, 2012, Remove Septa, Move Target back to Pivot May 2012, End of experiment data taking Schedule and Milestones slide courtesy of JP Chen

FY11 addition funding from DOE has been confirmed on the way. User groups contribution to procurement/machining : UVa (Don/Donal): target magnet repair, material irradiation Temple (Zein-Eddine): procurement Rutgers (Ron): machining + procurement UVa (Nilanga): machining HUJI (Guy): machining + procurement UNH (Karl): procurement Nice to have these contributions Budget and User Contributions slide courtesy of JP Chen

slide courtesy of C. Keith

Target Status (C. Keith and Target group) 1 st test: Mid May Located and repaired leak in the indium seal during initial LN2 cooldown. 2 nd test: Late May Performed successful (but limited) cooldown of Magnet May 30 cooled magnet to liquid Helium temperature ramped to full field (5T) and held in persistent mode for 20 mins and ramped down No Quench Next day did not have enough Helium to continue. Loss rate greater than expected. Bottom Line : Magnet seems healthy, some concern over leaks. Target group wants to thoroughly leak-test before next full cooldown. Plan to do another full cooldown when leaks are better understood.

Proposal Kinematics EG4: g1pE : g2p 0.02 < Q 2 < 0.5 GeV 2 Resonance Region

Changes from Proposal Room temp septa magnets instead of cryo septa for co-existence with QWeak. leads to a small gap in coverage at large Q 2, but the min Q 2 is unchanged. requires transition time to remove the septa.

Changes from Proposal Room temp septa magnets instead of cryo septa for co-existence with QWeak. leads to a small gap in coverage at large Q 2, but the min Q 2 is unchanged. requires transition time to remove the septa. Target field distorts the scattering plane much more than initial estimates. If ignored this would push the Q 2 coverage to 0.08 GeV 2 instead of 0.02 GeV 2

Changes from Proposal Room temp septa magnets instead of cryo septa for co-existence with QWeak. leads to a small gap in coverage at large Q 2, but the min Q 2 is unchanged. requires transition time to remove the septa. Target field distorts the scattering plane much more than initial estimates. If ignored this would push the Q 2 coverage to 0.08 GeV 2 instead of 0.02 GeV 2 We’ve addressed this by: a) Running at 2.5 T for the lowest incident energies. b) Manipulating incident angle of the electron beam.

Bottom Line All the physics proposal goals are still attainable. JLab support in dealing with this issue has been phenomenal ! Beamline/Accelerator/Design/Installation/Target

reach Q 2 = 0.03 GeV 2 run the two lowest energies with only 2.5 T target field & Manipulate the incident beam angle but 2.5T => P T = 40% Solution

reach Q 2 = 0.03 GeV 2 run the two lowest energies with only 2.5 T target field & Manipulate the incident beam angle but 2.5T => P T = 40% can regain some stat by changing from 0.5 cm target to 3 cm. Large W kinematics are typically the most time consuming so they’ve been trimmed. This is the most recent “Least-painful” choice of settings

Rates / Schedule

Runplan SEPTA IN SEPTA OUT

Runplan run at ½ field and nonzero incident angle for lowest energies

Runplan Beam Allocation is 87 days + 21 commissioning, Increasing DAQ rate from 4-8 kHz can save us about 7 calendar days.

Draft Schedule

Summary Recently passed JLab Readiness review Some issues to address, but mostly positive evaluation Target Magnet is onsite and appears to be in good shape Another full cooldown will be done prob in next few weeks. RunPlan and kinematic configuration request has been submitted to the scheduling committee 1.1 GeV and 1.7 GeV will have to be negotiated with other halls Installation is under way in the hall Lots of work to finish before the Fall Collaborators welcome!