SHRP II R-11 Strategic Approaches at the Corridor and Network Levels to Minimize Disruptions From the Renewal Process A Web Presentation to the Technical.

Slides:



Advertisements
Similar presentations
Feedback Loops Guy Rousseau Atlanta Regional Commission.
Advertisements

Performance Testing - Kanwalpreet Singh.
Breaking the Static Barrier: Building Regional Support for Implementation of Dynamic Traffic Assignment in Long-Range Planning Processes TRB Planning Applications.
SHRP II R-11 Strategic Approaches at the Corridor and Network Levels to Minimize Disruptions From the Renewal Process June 10, 2014 Webinar.
Dynamic Traffic Assignment: Integrating Dynameq into Long Range Planning Studies Model City 2011 – Portland, Oregon Richard Walker - Portland Metro Scott.
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
Step-by-Step Tutorial NEXTA: Simulation Data Visualizer for TRANSIMS
Session C2: Promising Research Roundtable An Integrated Work-Zone Computer System For Capacity Estimation, Cost/Benefit Analysis, and Design Of Control.
L4-1-S1 UML Overview © M.E. Fayad SJSU -- CmpE Software Architectures Dr. M.E. Fayad, Professor Computer Engineering Department, Room #283I.
Mouse Movement Biometrics, Pace University, Fall'20071 Mouse Movement Biometrics Fall 2007 Capstone -Team Members Rafael Diaz Michael Lampe Nkem Ajufor.
Agenda Overview Why TransCAD Challenges/tips Initiatives Applications.
Ch8: Management of Software Engineering. 1 Management of software engineering  Traditional engineering practice is to define a project around the product.
Amar Sarvepalli. 500 projects in 6-8 weeks Need VMT, VHT and More.
What is adaptive web technology?  There is an increasingly large demand for software systems which are able to operate effectively in dynamic environments.
LAN/WAN Optimization Techniques. Agenda Current Traffic Current Traffic Equipment Inventory and Forecasted Growth Equipment Inventory and Forecasted Growth.
* The basic components of a web site are: * Content – information displayed or accepted from users * Static – content that doesn’t change for different.
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
UPC/SHMEM PAT High-level Design v.1.1 Hung-Hsun Su UPC Group, HCS lab 6/21/2005.
Business Requirements Using Unified Modeling Language Eric H. Castain, SVP Internet Services Group, Architecture Wells Fargo March 2005.
1 The Architectural Design of FRUIT: A Family of Retargetable User Interface Tools Yi Liu, H. Conrad Cunningham and Hui Xiong Computer & Information Science.
Preventing SQL Injection Attacks in Stored Procedures Alex Hertz Chris Daiello CAP6135Dr. Cliff Zou University of Central Florida March 19, 2009.
Multi-agent Research Tool (MART) A proposal for MSE project Madhukar Kumar.
Lynn Peterson Secretary of Transportation Combining Macro Scopic and Meso Scopic Models in Toll and Traffic Revenue Forecasting SR 167 Corridor Completion.
IT Applications in Freight business B.V.L.Narayana RSC/BRC.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review SubTask CH TD Day-ahead Scheduling and Real-time Operations Tool Conventional.
Your Final Project Write an application: Language of your choosing Occupies rest of semester Individual project May NOT be: a work-for-hire for another.
A Case Study in the Deployment of a Web-based Service as a Stakeholder Involvement Tool to Support the Development of a Travel Demand Model 14 th Annual.
Research plan – LSRT Consortium. Targets Correctness approval Vs. Sybase database. Implementation of a validation scenario with TTI database. Demo preparations.
Jennifer Murray Traffic Forecasting Section Chief, WisDOT Metropolitan Planning Organization Quarterly Meeting July 28 th, 2015.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY San Francisco’s Dynamic Traffic Assignment Model Background SFCTA DTA Model Peer Review Panel Meeting July.
Getting Started: Ansoft HFSS 8.0
1 Computer Programming (ECGD2102 ) Using MATLAB Instructor: Eng. Eman Al.Swaity Lecture (1): Introduction.
S. Erdogan 1, K. Patnam 2, X. Zhou 3, F.D. Ducca 4, S. Mahapatra 5, Z. Deng 6, J. Liu 7 1, 4, 6 University of Maryland, National Center for Smart Growth.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
Unified Modeling Language* Keng Siau University of Nebraska-Lincoln *Adapted from “Software Architecture and the UML” by Grady Booch.
L6-S1 UML Overview 2003 SJSU -- CmpE Advanced Object-Oriented Analysis & Design Dr. M.E. Fayad, Professor Computer Engineering Department, Room #283I College.
FDOT Transit Office Modeling Initiatives The Transit Office has undertaken a number of initiatives in collaboration with the Systems Planning Office and.
Modeling Development CRFS—Technical Meeting November 14, 2012.
1 CMPT 275 High Level Design Phase Modularization.
August 2005 TMCOps TMC Operator Requirements and Position Descriptions Phase 2 Interactive Tool Project Presentation.
DVRPC TMIP Peer Review Dynamic Traffic Assignment (DTA) Oct. 29 th, 2014.
Travel Time Value Calculator: The Development of an Analysis Utility in Cube/Voyager.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
Function Points Synthetic measure of program size used to estimate size early in the project Easier (than lines of code) to calculate from requirements.
1 Methods to Assess Land Use and Transportation Balance By Carlos A. Alba May 2007.
UML Diagrams for Caradon developers Daniel DG Moth Core Development Group, Research Student University of Brighton, MSc Object Oriented Software Technology.
Mantid Stakeholder Review Nick Draper 01/11/2007.
Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce.
SHRP2 Project C05: Final Report to TCC Understanding the Contribution of Operations, Technology, and Design to Meeting Highway Capacity Needs Wayne Kittelson.
SOFTWARE ENGINEERING. Objectives Have a basic understanding of the origins of Software development, in particular the problems faced in the Software Crisis.
D R A T D R A T ABSTRACT Every semester each department at Iowa State University has to assign its faculty members and teaching assistants (TAs) to the.
1 PerfCenter and AutoPerf: Tools and Techniques for Modeling and Measurement of the Performance of Distributed Applications Varsha Apte Faculty Member,
Chapter – 8 Software Tools.
Understanding Web-Based Digital Media Production Methods, Software, and Hardware Objective
0 Freight Activities: Year in Review Dec. 12 th 2015.
L04 Source Code Review & Modification Options to Connect to AMS Data Hub (Xuesong Zhou) 1.
METRO Dynamic Traffic Assignment in Action COST Presentation ODOT Region 4 April 1,
Interaction and Animation on Geolocalization Based Network Topology by Engin Arslan.
Bi-Level Optimal Sequence and Schedule for Multiple Workzone Projects using WISE and Traffic Simulation By Sabya Mishra, Khademul Haque, Mihalis Golias,
Network Attributes Calculator
Unified Modeling Language
Transportation Systems Management and Operations (TSM&O)
Jim Henricksen, MnDOT Steve Ruegg, WSP
Software Engineering: A Practitioner’s Approach, 6/e Chapter 23 Estimation for Software Projects copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
Chapter 4. Modeling Transportation Demand and Supply
Objective Understand web-based digital media production methods, software, and hardware. Course Weight : 10%
Software Engineering: A Practitioner’s Approach, 6/e Chapter 23 Estimation for Software Projects copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
Chapter 26 Estimation for Software Projects.
  Advanced Tools to Assess Managed Toll Lane Operations Model Task Force Toll Subcommittee Meeting September 16, 2010.
  Use of Dynamic Traffic Assignment in FSUTMS in Support of Transportation Planning in Florida FDOT Research #BDK80 Task Work Order No June.
Presentation transcript:

SHRP II R-11 Strategic Approaches at the Corridor and Network Levels to Minimize Disruptions From the Renewal Process A Web Presentation to the Technical Committee March 21, 2012

Project Purpose Phase I of this project identified widely varying levels of effort and sophistication in sequencing renewal projects. Phase I of this project identified widely varying levels of effort and sophistication in sequencing renewal projects. A need for a software tool was identified. A need for a software tool was identified.

Primary Target Audiences DOT Program Managers in moderately urbanized States. DOT Program Managers in moderately urbanized States. MPO Program Managers Without Sophisticated Modeling Tools. MPO Program Managers Without Sophisticated Modeling Tools.

Primary Requirements The tool MUST NOT require user to abandon work done on management systems (PMS, BMS, etc.) The tool MUST NOT require user to abandon work done on management systems (PMS, BMS, etc.) The tool MUST NOT require user to collect new data or require additional personnel The tool MUST NOT require user to collect new data or require additional personnel The tool MUST NOT replicate existing capabilities The tool MUST NOT replicate existing capabilities

Phase II – Software Development Workzone Implementation Strategies Estimator (WISE)

An Engine in Two Parts Planning (Project Sequencing Optimization Engine). Planning (Project Sequencing Optimization Engine). Operations (DynusT) Operations (DynusT)

Planning Engine

Common Terms Program : One complete instance of WISE consisting of the Strategies, Planning Characteristics, Project information, Planning analysis and Operation Analysis. Program : One complete instance of WISE consisting of the Strategies, Planning Characteristics, Project information, Planning analysis and Operation Analysis. WorkSpace : The folder which contains all of the material for ONE Program(from above). This is an active directory for all activity within the current Program. WorkSpace : The folder which contains all of the material for ONE Program(from above). This is an active directory for all activity within the current Program. Project : One instance of construction with a Program. Each Program must have between 2 and 5 Projects. Project : One instance of construction with a Program. Each Program must have between 2 and 5 Projects. NeXTA: Network Explorer for Traffic Analysis which is used to import Networks to WISE. NeXTA: Network Explorer for Traffic Analysis which is used to import Networks to WISE. Network : The NeXTA generated network which contains the model where the WISE Program exists. Network : The NeXTA generated network which contains the model where the WISE Program exists. Planning Mode : Mode which allows user to generate a Program and run WISE Analysis Engine Planning Mode : Mode which allows user to generate a Program and run WISE Analysis Engine Operation Mode : Mode which allows users to interface with DynusT to run Base Scenario and individual Project Scenarios to determine Work Zone Volumes with and without Projects. Diversion Results are fed back to Planning Mode. Operation Mode : Mode which allows users to interface with DynusT to run Base Scenario and individual Project Scenarios to determine Work Zone Volumes with and without Projects. Diversion Results are fed back to Planning Mode.

The G.U.I.

Planning Inputs

Importing A Network

Data Requirements are Minimal Link – Node Network With Basic Geometry Link – Node Network With Basic Geometry Basic Traffic Flow Numbers Basic Traffic Flow Numbers NeXTA Utilizes.xml Spreadsheet Formats NeXTA Utilizes.xml Spreadsheet Formats Additional Data can be Utilized, if Available Additional Data can be Utilized, if Available

Importing A Network

Planning Inputs Planning Characteristics Planning Characteristics Project Strategies Project Strategies Project Info Project Info

Planning Characteristics

Project Strategies

Identified in Phase I Demand Based Strategies: designed to reduce the demand upon a given link Demand Based Strategies: designed to reduce the demand upon a given link Duration Based Strategies: designed to reduce the duration of the disruption Duration Based Strategies: designed to reduce the duration of the disruption

Project Info

A Six – Project Load to the Network

Running the Algorithm

WISE Behind the Scenes Table 1 Project profiles ProjectEarliest start timeLatest completion timeDuration (months)Duration StrategyActual durationPrecedance 1Jun, 2012May, Jun, 2012May, Jun, 2012May, Jun, 2012May, Jun, 2012May, Jun, 2012May, ProjectCapacity reductionOriginal posted speed limitNew posted speed limitConstruction mode Both Both Day Day Day Day

Sequencing Results

Planning / Operations Interaction Operation Mode is Built From Planning Information Operation Mode is Built From Planning Information Operation uses the same Network, Planning Characteristics and Projects as the Planning Mode. Operation uses the same Network, Planning Characteristics and Projects as the Planning Mode. Operation Mode intent is to provide an “Operation Diversion” for each project within the Planning Mode to be applied to the WISE Analysis Engine. Operation Mode intent is to provide an “Operation Diversion” for each project within the Planning Mode to be applied to the WISE Analysis Engine. Operation Diversion is calculated in the Operation Mode: Operation Diversion is calculated in the Operation Mode: Operational Diversion is made available to the user in the Project Information Section once the Base and Project Scenarios have been run for a given Project. This can be accessed by the following: Operational Diversion is made available to the user in the Project Information Section once the Base and Project Scenarios have been run for a given Project. This can be accessed by the following: Select Planning Tab -> Project Info Tab -> “Go To Project” for the Project desired. “Operation Supplied” will display the amount Select Planning Tab -> Project Info Tab -> “Go To Project” for the Project desired. “Operation Supplied” will display the amount

The Operations Engine

DynusT and D.T.A.

Dynamic Traffic Assignment

More Refined Diversion Analysis DynusT provides a more refined estimate of traffic diversion based upon: DynusT provides a more refined estimate of traffic diversion based upon: – Additional Project Information – What-if Scenarios – Interactions With Nearby Links

Now, … Back to Planning

Now Re-Run the Sequence

Next Steps Field Validation and Calibration. Field Validation and Calibration. Continued Rigorousness Testing and Code Stabilization. Continued Rigorousness Testing and Code Stabilization. Enhancement of Capabilities Enhancement of Capabilities

Questions?