Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) 486-6358 or (209) 835-8150,

Slides:



Advertisements
Similar presentations
HVAC 13a CNST 305 Environmental Systems 1 Dr. Berryman
Advertisements

Chapter 3. HVAC Delivery Systems
BUILDING AIR CONDITIONING
Federal Reserve Bank of Boston Case Study
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Re-commission 5 Buildings Goal 2012 Lighting Upgrades VFDs Historic Weather Extremes Boiler Efficiency Free Cooling AHU Schedules.
Program Overview February 25, Program Summary Approximately $14M in incentives per year Cap for Large Customers: $300,000 per year Prescriptive.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
1. 2 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Prescriptive Incentive for individual measures. ▪They did not model.
Controlling Sutardja Dai Hall Andrew Krioukov Stephen Dawson-Haggerty, Jay Taneja David Culler.
Overview of Collected Integrated Chiller Retrofit Case Studies Dr. Lisa Gartland (510) ,
CERT UPDATE TO GUILFORD COUNTY ENERGY AUDITS OF BELLE MEADE BUILDING BB&T BUILDING HIGH POINT COURTHOUSE & DETENTION CENTER HIGH POINT PUBLIC HEALTH BUILDING.
Partnership Gwinnett + Southeast Green Series- Debunking Energy Efficiency Myths: Why your bottom line depends on Energy Efficiency Property of VIS VIVA.
UTPA Energy Conservation Initiatives Oscar Villarreal Director, Facilities Management David Ortega Assistant Director, Energy Manager.
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
Denver Place North & South Towers Case Study Matt Urquhart Amerimar Realty Management Company Jack Wolpert E-Cube, Incorporated.
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
Upon completion of this training one should be able to: Identify different types of hydronic heating systems Identify key components in a simple hydronic.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Integrated Retrofits for Federal Projects Dr. Lisa Gartland.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
BEM CLASS 5 Building Thermodynamics – 2 Air-conditioning Load Calculation – latent heat, solar and internal gains.
Examples of Commissioning Cost Savings Commissioning for Sustained Building Performance September 29, 2011 Marriott Birmingham, AL.
1 Multi-use Facility. 2 Occupancy – 140 persons Building Characteristics Single story 20,000 square feet (250’ x 80’) Standard construction.
Who Says Energy Efficiency Can’t be Sexy? About Us Energy + Environment  Since 1999  Decades of experience in energy efficiency  We create jobs, lower.
Important variables Water: Air: Conversion:
Green Building Demonstration Project Adam Saling City of San Diego.
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
Managing Energy Consumption ENERGY SAVING IS ONLY GOOD IF IT SAVES YOU MONEY. ENERGY SAVING IS BETTER IF IT MAKES YOU MONEY.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
Name of Building(s) or Project Speaker(s) Organization(s)
Marriott Corporate Headquarters
Lighting systems HVAC systems Lighting Equipment HVAC Equipment Miscellaneous loads Envelope Energy Conservation Measures (ECMs)
1 Lamp operating factor Published lumen output is based on laboratory conditions Voltage  Rated at line voltage of 115V Standard reactor ballast  Electromagnetic.
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Western Regional Pollution Prevention Network Energy Efficiency Cal Broomhead Department of Environment City and County of San Francisco sfenvironment.org.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Wurster Hall MBCx Project October 30th, Project Overview Project Goals Project Objectives Identify Low Cost/No Cost Measures Identify Retrofit.
Lack of dedicated building meter – Solution: Estimate square footage of Herberger in relation to total area serviced by meter – Estimate 12% of total.
Absolute Energy Savings LLC First and foremost a service company Types of customers Customized energy savings programs Quick payback projects to detailed.
Changes for 2016 Moving Forward! 2016 ECM Fan Box Bright Energy Solutions! LED High Bay! Chillers! Ready for 2016.
Robert Greenwald, P.Eng, MBA February 26, 2004
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Why Conservation Matters
Sean Weber Energy Engineer
Sustainability Best Practices
Welcome to the Colorado Restaurant Association Pikes Peak Chapter Energy Efficiency in the Restaurant Industry.
Energy Savings Projects
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Types of HVAC Technology Used in Business Establishments
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Energy Incentive Programs
HCB 3-Chap 19A: All-Air Systems_Single Zone
LED Savings and Simple Payback at the Music Building
Minimizing Heating & Cooling Costs
Objective Revie the Cooling Cycle Learn about air distribution systems
Energy Savings for Business Program
Presentation transcript:

Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) , or

LLNL Building 111 Originally designed as the Experimental Physics Building Built in 1966 Seven stories, 107,000 square feet Now used as administrative offices & research support space

LLNL Building 111 Original HVAC and Lighting Equipment Two 225 ton Carrier electric chillers –1.0 + kW/ton efficiency, CFC-11 refrigerant Two gas-fired hot water boilers for heating Two constant volume air handling systems –For east wing, south wing & interior –Bypassed VAV air handlers and VFD motors Fluorescent light fixtures with T-12 lamps

LLNL Building 111 Project Scenario 23-year-old inefficient chillers in need of overhaul –using CFC refrigerants, 1.0+ kW/ton Poor air quality and building comfort –Air system was out of balance –Economizers stuck open High temperature hot water reheat system with supply temperature reset (didn’t work) Less efficient T-12 lamps –Lighting levels unnecessarily high in hallways –Substantial unoccupied time with lights left on

LLNL Building 111 Project Challenges Fragmented funding for projects –In-House Energy Management funding for measures with simple paybacks of < 10 years Work presented here was actually done in Three separate projects –Chiller replacements –Lighting retrofits –HVAC System Improvements

LLNL Building 111 System Solutions (2) Chillers replaced –(2) new 200 ton chillers, one chiller redundant New VAV’s & VFD’s added to air system with zone level control –250 zones –Economizer controls New T-8 lighting, occupancy sensors, LED exit signs

LLNL Building 111 Chiller Replacement Done in 1994 New McQuay centrifugal chillers 0.65 kW/ton R-134a 200 tons Expected to save 151,400 kWh per year

LLNL Building 111 Air System Improvements Done in 1996 Converted fixed balancing dampers –To variable/automatic actuating dampers –Used exist pneumatic controls –Could not afford new VAV boxes –Air flow controlled in each zone –Variable volume terminal boxes hooked up to existing zone heater thermostats New VFD to control fan motors on east, west, south & interior system Economizer controls

LLNL Building 111 Lighting Improvements Done in 1995 Delamped fixtures –Overlit building, especially in corridors –Reduced number of lamps per fixture from 3 to 2, or 6 to 3, or 8 to 4 Replaced existing T-12 lighting –New T-8 fluorescents, electronic ballasts LED fixtures replaced incandescent and fluorescent exit signs Occupancy sensors used to turn off lights in offices, corridors, etc.

LLNL Building 111 Electrical Energy Savings

LLNL Building 111 Integrated Economics Measures with lower paybacks reduce the overall project payback period

LLNL Building 111 Financing Structure In-House Energy Management Funds from US DOE used for: –Chiller Replacements –Lighting retrofits –HVAC System improvements Appropriations from US DOE, no financing charges

LLNL Building 111 Project Timeline

LLNL Building 111 Project Results Saved over $73,000 annually on utility bills –~40% of total bill New chillers without CFC’s – use R-134a, an HFC Improved air quality & comfort Increased efficiency of HVAC System

LLNL Building 111 Lessons Learned Projects not planned & executed together Reduced cooling load not accounted for in new chiller sizing Incremental funding with lots of paperwork and hassles Super-ESPC’s developed to address these problems