RPS Model Methodology Arne Olson, Partner Doug Allen, Consultant.

Slides:



Advertisements
Similar presentations
Study Results PC8-PC16 System Stress Tests This slide deck contains results from the 2012 TEPPC Study Program related to the various stress tests performed.
Advertisements

ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Procuring Our Way to Compliance IEP 27 th Annual Meeting September 23, 2008 Fong Wan, PG&E.
ROLE OF RPS CALCULATOR IN >33% RPS STATEWIDE TRANSMISSION PLANNING? 1.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
Capacity Valuation.
SMALL UTILITY-SCALE RESOURCES (DISTRIBUTED GENERATION) 1.
1.  What is a Renewable Energy Credit (REC)?  What are they used for?  Who uses them?  How is REC ownership tracked?  What is the Renewable Portfolio.
Potential Impacts of an Advanced Energy Portfolio Standard in Pennsylvania Ryan Pletka, P.E. Black & Veatch April 12, 2004 Supported by: Heinz Endowments.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Renewable Net Short.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
TRANSMISSION COSTS. Summary  The availability and cost of transmission are primary components in the Net Market Value (NMV) calculation used to rank.
Update on the 2015 Special Study June 29, 2015 Arne Olson, Partner Nick Schlag, Managing Consultant Gabe Kwok, Senior Consultant.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Implementing one of the most ambitious renewable energy standards in the country California’s Renewable Energy Programs Implementing one of the most ambitious.
Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.
California Energy Commission Renewable Energy in California Rasa Keanini and Heather Raitt Renewable Energy Program Efficiency, Renewables & Demand Analysis.
Summary of PV Potential Assessment in RETI and the 33% Implementation Analysis Re-DEC Working Group Meeting December 9, 2009.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
1 Connecting the Dots Edward Randolph Director, Energy Division California Public Utilities Commission Date (example: April 26, 2012)
1 Introduction, scope, context Terminology, high-level approach Methodology, Inputs, Assumptions –Portfolio development –Discounted core –Environmental.
Renewable Energy Delivery, Scheduling, and Firming / Shaping
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
California’s Renewable Energy Credits (REC) Market Update
Distributed Generation Benefits and Planning Challenges CREPC/SPSC Resource Planners’ Forum October 3, 2012 Arne Olson.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 7/07/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
R / I Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code :15pm.
1 Energy Division Workshops: LTPP Planning Standards (Part 1) & Procurement Rulebook June 11, 2010 Workshop R , Tracks 1, 2, & 3.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Rob Oglesby Executive Director California Energy Commission C ALIFORNIA E NERGY P OLICY G OING F ORWARD.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
SOUTHERN CALIFORNIA EDISON SM REC cost estimation April 23, 2010 Eric Lavik.
What do we mean by “Energy?
Renewable & Alternative Power Senate Energy, Utilities & Communications Committee Stuart R. Hemphill Director, Renewable and Alternative Power Southern.
1 Long-term Renewables Planning Methodology, Inputs and Assumptions for the 2010 Long-Term Procurement Plan Proceeding California Public Utilities Commission.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
1 August 3, 2015 Environmental Considerations in RPS Calculator CEC IEPR Workshop.
Integrating Land Conservation and Renewable Energy Goals in California: A Study of Costs and Impacts Using the Optimal Renewable Energy Build-Out (ORB)
2010 Long-Term Procurement Plan 33% RPS Calculator Training California Public Utilities Commission January 7, 2011.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Renewables Portfolio Standard Status Report California Public Utilities Commission February 26 th, 2008.
Overview: California Renewables Portfolio Standard (RPS) Program Presented by Paul Douglas RPS Program Manager California Public Utilities.
RETI Workshop March 16, 2015 Arne Olson, Partner Lakshmi Alagappan, Sr. Managing Consultant Identifying High Value Renewable Resources.
DG Projections in the Western Interconnection March 15, 2016 Zach Ming, Consultant Nick Schlag, Managing Consultant Arne Olson, Partner.
1 RETI 2.0 Plenary Group Meeting 3/18/2016 DRAFT 2016 RPS Portfolios.
Renewable & Alternative Power Implementation of the California Renewables Portfolio Standard February 6, 2007 Senate Energy, Utilities, and Communications.
BLACK & VEATCH RETI 1.0 BACKGROUND AND RPS CALCULATOR RESOURCE DEVELOPMENT.
November, 2008.
Integrated Resource Plan 2016
Mike Jaske California Energy Commission
DG Projections in the Western Interconnection
Study Results PC8-PC16 System Stress Tests
Tyler Butikofer, WECC Tom Carr, WIEB
Presentation transcript:

RPS Model Methodology Arne Olson, Partner Doug Allen, Consultant

2 Contents Updates to Previous 33% Implementation Analysis Resource Potential, Cost, and Performance Portfolio Selection Methodology

Updates to Previous 33% Implementation Analysis

4 Current Analysis Compared to 2009 Implementation Analysis 33% RPS Implementation Analysis was focused on informing state RPS policy Key tasks: 1. Develop “plausible scenarios” for achieving 33% by Estimate the net ratepayer costs associated with each plausible scenario 3. Highlight key obstacles to reaching the 33% goal, including the need for new transmission and the integration costs of new resources The current analysis is focused on informing state RPS planning Key tasks: 1. Develop “plausible scenarios” for achieving 33% by Estimate year-by-year resource build-outs under each alternative scenario 3. Feed information into LTPP proceeding to inform the Commission’s decisions regarding fossil procurement

5 Weaknesses of Previous 33% Implementation Study New transmission is assumed for most projects  No way to determine which projects could get built without new lines Renewable projects are selected in aggregated “bundles” and could not be selected individually Crude methodology for addressing potential out-of-state REC resources (“Out-of-State Early”, “Out-of-State Late”) Did not look at operational impacts of renewables at such high levels of penetration  Integration costs for intermittent resources based on a rule of thumb Lack of transparency in handling of short-listed CPUC projects Project viability ratings not very scientific

6 Key Improvements in Portfolio Development Methodology Improved handling of transmission requirements for new renewable resources  Allows some resource to be delivered over existing transmission or with minor upgrades  Allows individual selection of Non-CREZ resources Incorporation of unbundled REC resources  Can now model out-of-state REC-only resources as well as out-of- state CREZs Incorporation of “Discounted Core” of commercial projects  Projects in advanced stage of permitting and development

7 Other Updates to Analysis Improved detail on Commercial projects in CPUC ED Database  CREZ assignments  2009 solicitations  Confidential projects either aggregated or excluded to improve transparency New Aspen environmental scores Updated resource list based on RETI Phase 2B analysis Updated RPS Net Short based on:  2009 IEPR Load Forecast  New load decrements for EE and CHP calculated by CPUC  Existing renewable resources from 2008 Net System Power Report

Resource Potential, Cost, and Performance

9 General Approach Determine renewable resource gap (GWh) in 2020 Compile database of resources available to meet RPS target Rank available resources based on cost, commercial interest, environmental sensitivity and timeline Select resources to fill renewable resource gap

10 Determining Demand for Renewables Demand for renewables in California is based on 2020 RPS target, equal to 33% of eligible retail sales  2020 retail sales based on CEC 2009 IEPR load forecast  Excludes retail sales by small LSEs (<200 GWh/yr) Estimate quantity of renewable resources online in base year  Used renewable resource “claims” from CEC 2008 Net System Power Report  Added new resources online in 2009 based on ED Database RPS resource gap is the difference between the 2020 target and the 2009 renewables claims

11 Renewable Net Short

12 Sources of New Resources to Fill Resource Gap 1. Commercial Projects  ED Database of IOU projects  POU procurement plan data obtained from CARB 2. Additional “Theoretical” Projects  RETI pre-identified and proxy projects for California  WREZ projects for the rest of the WECC 3. Original Renewable DG resource potential estimates  Developed as part of 2010 LTPP

13 Updated ED Database Analysis incorporates the latest ED Database, including 2009 IOU solicitations  Contracted projects are included individually  Shortlisted projects are aggregated by resource type and zone in cases where there are at least three such projects to preserve confidentiality (otherwise they are left out) Distribution of projects among zones has changed since previous analysis

14 Changes in the ED Database

15 Breakdown of the ED Database

16 Treatment of Commercial Projects Commercial projects are divided into two categories: 1. Discounted Core: Project has obtained or has made significant progress towards obtaining a permit 2. Non-Discounted Core: Project has made limited progress towards obtaining a permit Discounted Core projects are given first priority in the resource selection sorts, reflecting their high probability of development Non-Discounted Core projects are given priority over generic resources but are not guaranteed development POU planned resources treated as Non-Discounted core

17 POU Resources E3 has included POU resource procurement plans in the development of the resource portfolios based on CEC data POU resources are included as Non-Discounted Core commercial resources

18 RETI Phase 2B Database The updated RETI Phase 2B Database contains site-specific information for renewable resource potential, cost, and performance in California Out-of-state resources from the WREZ Transmission Model have been incorporated with the RETI data  WREZ estimates of potential represent high-quality remote renewable resources that would require significant transmission upgrades to reach load centers

19 Out of State Renewable Resource Data from E3 Models E3 maintains a database of renewable resource cost and performance data in the West  Wind and solar data based on NREL GIS modeling  Geothermal and hydro data from EIA  Biomass aggregated from various sources  Additional resource data for BC and Alberta Used to supplement WREZ data for out-of-state resources (Montana, Colorado, BC, Alberta)

20 Estimates of Statewide DG Potential As part of the 2010 LTPP, E3 and Black & Veatch collaborated to develop original estimates of the statewide potential of solar PV The RPS model integrates these estimates, allowing it to evaluate the viability of the development of these resources

21 Resource Cost and Performance E3 used site-specific data on resource cost and performance where available (RETI and WREZ projects) Generic assumptions were developed for resources without specific information based on averages of the RETI data (shown below)

22 Generic Resource Cost Assumptions

23 Transmission and Geographic Classification of Resources Each resource is assigned one of three classifications 1. CREZ: resources located within one of the 48 Competitive Renewable Energy Zones (either in California or in other states) 2. Non-CREZ: resources in California or directly across the border that are not located within a CREZ and can be delivered with minor transmission upgrades 3. Out-of-State REC: out-of-state resources that would deliver energy to the local market

24 Transmission Bundles Resources in CREZs are aggregated into transmission bundles in the following order: 1. Existing transmission bundle 2. Minor upgrade bundle 3. New transmission bundle Discounted core projects given first priority to fill each transmission bundle  Non-core Commercial projects given next priority to fill the New Transmission bundle  Any remaining transmission capacity in the bundle is allocated to the lowest-scoring generic projects  Up to 3000 MW of new transmission allowed for each CREZ

25 Examples of Transmission Capacity Allocation

26 Examples of Transmission Capacity Allocation

27 Out-of-State REC Resources Out-of-State RECs previously included in two “zones” (“Out-of- State Early” and “Out-of-State Late”) New model can select REC resources individually Assume physical limitations on wind integration for each region REC resources priced at long-run “Green Premium” or Cost minus Value  REC resources optimized for access to transmission, not for resource quality – RECs are allowed for average quality resources, not best sites  Pricing based on long-run cost, not REC market price forecast (analogous to in-state resources)  No pricing distinction between different types of RECs (bundled vs. unbundled, with or without delivery requirement)

28 Unbundled Out-of-State REC-Only Transaction Leg 1: Developer to Mid-C Mid-C Market Leg 2: CAISO to load Pure REC transaction with no energy purchase requirement and no delivery requirement Developer sells energy at Mid-C California LSE purchases REC from developer at LCOE minus Mid-C price Separately, California LSE arranges for energy transaction from CAISO market to load California LSE never owns energy No incremental imports to California

29 Out-of-State REC with Delivery Requirement Leg 1: CA utility to Mid-C Mid-C Market Leg 2: CAISO to load REC transaction with energy purchase requirement and delivery requirement California LSE purchases energy and REC from developer at LCOE of wind facility and sells energy at Mid-C Separately, California LSE arranges for energy transaction from CAISO market to load California LSE rebundles REC with transaction from Mid-C to CAISO that would have occurred anyway! No incremental imports to California Leg 3: Mid-C to CAISO

30 Pricing of Out-of-State REC vs. In-State Resource In-State Resource priced at LCOE, ratepayer impact is cost relative to market value or “Green Premium” Out-of-State REC priced directly at “Green Premium” Energy and capacity values vary by market (higher in California) Pricing is the same for all flavors of RECs Example of In-State vs. REC-only Pricing

31 Physical Limits on Out-of-State REC Supply Market Value of Wind Energy $/MWh MW of Intermittent Renewables Initially, wind displaces gas resources More wind reduces market prices and raises integration costs Value decreases significantly as wind displaces baseload There is a practical limit to how much intermittent energy each zone can easily accept

32 Physical Limits on Out-of-State REC Supply There is a practical limit to how much intermittent energy each zone can easily accept Market Value of Wind Energy $/MWh MW of Intermittent Renewables Initially, wind displaces gas resources More wind reduces market prices and raises integration costs Value decreases significantly as wind displaces baseload E3 limited the REC supply based on a simplified representation

33 Limits on Wind Penetration Ability to easily absorb wind is limited to load served with flexible generation E3 estimated hourly flexible generation in each zone:  Load – Nuclear – Coal – Base Hydro + Export Transmission Capacity  Wind limit is min value Other regions also have RPS requirements – assume CA can soak up 50% of each region’s limit 6,461 MW 2,257 MW 738 MW 404 MW 1,231 MW 461 MW 229 MW 47 MW 0 MW 3,665 MW 1,371 MW 3,968 MW 1,939 MW 2,135 MW 947 MW 1,700 MW 850 MW 2,211 MW 808 MW 13,745 MW Total limit on wind in region Wind available to California

Portfolio Selection Methodology

35 Resource Selection Methodology 1. Calculate project score for each resource 2. Allocate lowest-scoring out-of-state theoretical projects to other states until all non-CA WECC RPS targets for 2020 are satisfied 3. Rank remaining CREZ projects and select to fill transmission bundles 4. Calculate aggregate score for each transmission bundle 5. Rank transmission bundles against individual non-CREZ and REC resources 6. Select resources and bundles to meet 33% RPS target in 2020

36 Detailed Portolio Development Resource Sort for Local Use Potential CREZ Resources Potential Non-CREZ and REC Resources Resource Sort for CA Use as RECs Resource Sort for CA Use Towards RPS Resources Remaining After Local Sort Resource Sort for Existing Tx Resources on Existing Transmission Resources Remaining After Existing Tx Sort Resource Sort for New Tx New Transmission Bundles Resources Remaining After Local Sort Non-CREZ and REC Resource Rankings Resources Selected for Local Use Resources Selected for CA RPS Portfolio

37 Project Scoring Methodology Each project is scored on a scale based on four metrics (0 is better):  Net Cost  Environmental Score  Commercial Interest Score  Timing Score Final score for each project is a weighted average of the four individual metrics  Weights are user-defined and vary by scenario

38 Net Cost Score Cost score is based on a modified version of the RETI Ranking Cost Includes integration and T&D avoided costs Scores are converted to 0 – 100 scale, bounded by the model’s lowest and highest net cost resources Modified RETI Ranking Cost +Levelized cost of energy +Interconnection (gen-tie) costs +Deemed integration costs +Levelized, per-MWh incremental transmission costs –T&D avoided costs –Energy value –Capacity value =Final project ranking cost

39 Environmental Score Handicaps resources in areas where environmental issues might hinder development Considers a variety of factors:  Disturbed lands  Right-of-Way  Significant species  Air quality  Others Scores for each resource in each CREZ on scale

40 Commercial and Timing Scores Commercial Score: Scale of reflecting contracting activity of California utilities  Commercial projects receive a score of 0, while generic projects receive a score of 100  POU-planned projects considered “Commercial” and receive score of 0 Timing Score: Gives better score to resources that can be developed on a relatively short time scale  Online date 2021 gets 100  For ED database projects, online dates filed with the applications  For other resources, dates based on size and type of project

41 Selection of RPS Portfolio Each transmission bundle is assigned an aggregate score based on an average of the constituent resources and compared against individual non- CREZ and RECs resources Discounted Core Projects are selected first unless in New Transmission bundle After Discounted Core, resources & bundles with the lowest score are selected to fill the 2020 RPS gap