Drift Chambers and Pattern recognisation  Fabrizio CeiPattern recognition ideas INFN & Pisa University  Hajime NishiguchiKapton foils for DC cathode.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
TPC status Marian Ivanov. Outlook TPC performance ExB correction Alignment Nonlinearities and edge effects Drift velocity calibration.
TRACK DICTIONARY (UPDATE) RESOLUTION, EFFICIENCY AND L – R AMBIGUITY SOLUTION Claudio Chiri MEG meeting, 21 Jan 2004.
7/5/05,MEG DC,je MEG DC 1.Foils 2.Wires 3.Frames + tools 4.Preamplifier 5.Gas pressure control 6.final.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
GEM DHCAL Simulation Studies J. Yu* Univ. of Texas at Arlington ALCW, July 15, 2003 Cornell University (*on behalf of the UTA team; S. Habib, V. Kaushik,
Muon Tracker Overview The PHENIX Muon Arms detect vector mesons decaying into muon pairs, allow the study of the Drell-Yan process, and provide muon detection.
Position sensing in a GEM from charge dispersion on a resistive anode Bob Carnegie, Madhu Dixit, Steve Kennedy, Jean-Pierre Martin, Hans Mes, Ernie Neuheimer,
July 2003American Linear Collider Workshop Cornell U. Development of GEM-based Digital Hadron Calorimetry Andy White U.Texas at Arlington (for J.Yu, J.Li,
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Analysis strategy of high multiplicity data Toshiyuki Gogami 24/Feb/2011.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
26 Jan, MEG Software Status Framework for MEG MC, Unification of LargePrototype/beam test, Schedule and DC reconstruction MEG Software Group.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Software and analysis Malte‘s Garfield isochronal Lines.
Drilling a Double Cosine-Theta Coil Hunter Blanton, Spencer L. Kirn, Christopher Crawford University of Kentucky Abstract: A double cosine theta coil is.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
Yosuke Watanabe….. University of Tokyo, RIKEN A, KEK C, Development of a GEM tracker for E16 J-PARC 1 Thanks to ???????????
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
V.Patera – KLOE GM – Otranto – 10 June 2002 K  reconstruction status K + K - retracking features New vs Old : resolution New vs Old : efficiencies Conclusion.
Mitglied der Helmholtz-Gemeinschaft Calibration of the COSY-TOF STT & pp Elastic Analysis Sedigheh Jowzaee IKP Group Talk 11 July 2013.
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
21 Jun 2010Paul Dauncey1 First look at FNAL tracking chamber alignment Paul Dauncey, with lots of help from Daniel and Angela.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting Rutherford Appleton Lab Tuesday 25 th April 2006 M. Ellis.
W-DHCAL Analysis Overview José Repond Argonne National Laboratory.
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
Luca Spogli Università Roma Tre & INFN Roma Tre
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
3D Event reconstruction in ArgoNeuT Maddalena Antonello and Ornella Palamara 11 gennaio 20161M.Antonello - INFN, LNGS.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Calibration Malte‘s Garfield isochronal Lines and drift.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
00 Cooler CSB Direct or Extra Photons in d+d  0 Andrew Bacher for the CSB Cooler Collaboration ECT Trento, June 2005.
1 DT Local Reconstruction on CRAFT data Plots for approval CMS- Run meeting, 26/6/09 U.Gasparini, INFN & Univ.Padova on behalf of DT community [ n.b.:
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
1 M2-M5 Efficiency and Timing checks on 7TeV beam data Alessia, Roberta R.Santacesaria, April 23 rd, Muon Operation
N. Saoulidou & G. Tzanakos1 Analysis for new Period 3 Events N. Saoulidou and G. Tzanakos University of Athens, Department of Physics’ Div. Of Nuclear.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
 0 life time analysis updates, preliminary results from Primex experiment 08/13/2007 I.Larin, Hall-B meeting.
David Silvermyr Lund University for the PHENIX Collaboration Early global event results using the PHENIX Pad Chambers at RHIC.
Giuseppe Ruggiero CERN Straw Chamber WG meeting 07/02/2011 Spectrometer Reconstruction: Pattern recognition and Efficiency 07/02/ G.Ruggiero - Spectrometer.
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
3 May 2003, LHC2003 Symposium, FermiLab Tracking Performance in LHCb, Jeroen van Tilburg 1 Tracking performance in LHCb Tracking Performance Jeroen van.
Status of physics analysis Fabrizio Cei On Behalf of the Physics Analysis Group PSI BVR presentation, February 9, /02/2015Fabrizio Cei1.
Pattern recognition with the triplet method Fabrizio Cei INFN & University of Pisa MEG Meeting, Hakata October /10/20131 Fabrizio Cei.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Results from an in-beam prototype test of a high resolution tracking detector for the International Linear Collider The department of Experimental High.
Status of MEG-I physics analysis
Tracking System at CERN 06 and 07 test beams
Integration and alignment of ATLAS SCT
DT Local Reconstruction on CRAFT data
Slice Test: Preliminary Data Analysis The Ohio State University
Project Presentations August 5th, 2004
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
m -> eg Drift Chambers
Gain measurements of Chromium GEM foils
Presentation transcript:

Drift Chambers and Pattern recognisation  Fabrizio CeiPattern recognition ideas INFN & Pisa University  Hajime NishiguchiKapton foils for DC cathode University of Tokyo  Johny EggerDC status and tests PSI

DC Status and Tests Hood and inner cathodes Print foils  M1 test –Drift time measurement –Cathode read out Next future

Cathode hood Delivery and first tests: second half of July

Inner cathodes - measurement of deformation with applied forces - simulate forces (level arm) with wires through the gas holes - eventually stabilize free edges with tiny foam support(rohacell)

Print foils Good results of  M1 tests possible foil pattern deformations hood-foil tests with mounting tool Inner cathode foil mounting test Final design of the foil pattern Ordering if all requests are satisfied by the manufactory

H. Nishiguchi H. Nishiguchi Kapton foils for DC cathodes Requirements Low-Mass: reduce resolution deterioration due to multiple scattering Kapton film 12.5 µm thick; Aluminum deposition 50 nm thick (NOT copper !! ) Accuracy: precise position reconstruction with vernier pad method requires manufacture accuracy ~ ±20 µm and deposition by “Etching”. Situation Sample foils with 3 Japanese companies suffered from many problems, but a sample foil which satisfies all requests (except cost) was built. Contacts with european factories under way from PSI group.

  M1 test with the 4 test chambers Anode 1, 2 plan 0 to 4 digital Scope 8 channels 500 MHz 500 points, 8 bits Cathodes of anode 2 plan 2,3 FLASH ADC 8 channels 100 MHz 500 points, 8 bits 24 Cathodes Anode 1,(2,3) LRS ADC 24 double channels Anode 3 plan 0 to 4 AD811 Read out

Not staggered Parallel beam + tilted chambers

 =.21 ns 1.00 &.60 Tesla P= 158 & 258 MeV/c  parallel < 1 % No Field P= 158 & 258 MeV/c DC tilted by  1 DC tilted by  2

Behavior of amplifiers in the 1 Tesla magnetic field -no measurable difference on induced test pulses - time definition :  t =.12 ns (  =.8 ns) - pulse integral :  I <.04 % (  =.16 % ) -no measurable effect in the magnetic field even with magnetic SMD capacitors and resistances ( contacts) - approximate the field distortion with the new „non magnetic“ SMD elements, cables, connectors

Subtract y = b1 + b2*(sin[w*(t-t0)]): fit of the 225 first points  M1 run : w = 2  * 50 MHz Look for the first n=4,5 adjacent points above threshold Linear fit of first n signal points and n last background points (=0) Drift time threshold

Drift time (Fit-measured time) against drifttime t3 against t0 Sqrt(  (Fit-measured time) 2 ) = > 2.0 ns 2.8 ns(~.1 mm) 1.0 ns <  (Fit-measured time) < 2.1 ns Difference between 2 colors in t1 shows misalignment of anode w2p1 of ~.1 mm

u1 u2 d1 d2 Cathode readout d1+d2 d1-d2 u1-u2 u1+u2 Anode has a shielding effect of a few percents Cathode u1 = n1*Anode * (1+c2 * sin[c3*x] +  * c2* sin 2 [c3*x]) Cathode u2 = n2 *Anode * (1-c2 * sin[c3*x] -  * c2*sin 2 [c3*x]) Cathode d1 = n3 *Anode * (1+c2 * cos[c3*x] +  * c2*cos 2 [c3*x]) Cathode d2 = n4 *Anode * (1-c2 * cos[c3*x] -  * c2*cos 2 [c3*x])  value for traces on 1 side of the anode is the opposite of the value for traces on the other side

 and the cathode normalization factors ni are correlated in the calibration procedure Calibration procedure not yet optimal : distributions are not flat 0.34 mm <  (Fit-measured value) <.60 mm 0.11 mm <  (Fit-measured value) <.35 mm June 27 July 8

Cross talks a) to next plane < 1% b) To adjacent anode: 1) small on integrals 2) important for timimg c) to near cathode of adjacent anode: Important Corrections to b) and c) well defined by measurement of events without signal on the adjacent anode   „Domino „ read out on all channels is important 1000 points, 500 MHz, 10 bits is ideal

Present and near future plane Analysis of  M1 run (rich sample of data)Analysis of  M1 run (rich sample of data) –Magnetic field –Anode shielding, cross talk –Exotic events TestsTests –Foils –Amplifiers and prints –High rates OrderingOrdering –Foils –Frames and prints –Amplifiers and cables ConstructionConstruction Test with first elements (maybe within this year)Test with first elements (maybe within this year)

Positron Tracker Test Milestone AssemblyDesignManufactoring Full Prototype Medium PrototypeCharge division & Cosmics FP Full Detector (18 DC)

Fabrizio Fabrizio Ideas for pattern recognition Pattern recognition problem in MEG: DC integration time ~ 1  s Positron rate on drift chambers ~ 5 MHz Some superimposed tracks in each DC readout. Two turns (a rather frequent case)

Assumptions Chambers are formed by two independent sensitive elements;  Chambers are formed by two independent sensitive elements;  From each of them a three-dimensional information of the crossing point (“hit”) can be extracted crossing point (“hit”) can be extracted DC signals were already analysed up to this level DC signals were already analysed up to this level  Wires and signal formation not simulated.

Strategy outline  Define a segment of track as two pairs of hits (or a pair and an isolated hit) within two adjacent chambers (one wedge);  Perform a fast and reliable estimation of the positron momentum associated to any segment;  Look at any couple of segments which have the same pair of hits (or the same isolated hit) as end (one segment) and beginning (the other);  Select the couples of segments having compatible momentum components and total momentum;  Within this sample, join the couples of segments which satisfy the geometrical requirements for a good track;  Save all “tracks” formed by a minimum number of segments (4 or 5);  Absolute timing information not used (by now).

Not enough time for details; only Technique: principal component analysis in quadratic approximation: to determine a i, b ij. h i = one of the three spatial coordinates of one hit. Sum over the hits (3 or 4) in one wedge associated to a segment. Training by MC events: sample of 5 x 10 5 Michel positron tracks, corresponding to ~ (1  3) x 10 4 tracks in each wedge. Minimize: Fast momentum estimation

Tracks with  4 segments Total momentum pzpzpzpz MeV pzpzpzpz pxpxpxpx pypypypy Black: true Red: estimated p N.B. This is NOT a momentum reconstruction a momentum reconstruction. Momentum reconstruction in one segment minus true value

Linking segments Any chamber (except #1 and #17) is a part of two“wedges” we can link two segments in adjacent wedges requiring that they have one common point. Further selections:  compatibility of momentum vectors in adjacent segments;  compatibility of new segment with extrapolated track. with extrapolated track. Segments with the same starting point.

Example of reconstructed tracks

Algorithm performances # of correctly reconstructed tracks # of correctly reconstructed tracks Efficiency = ——————————————— Efficiency = ——————————————— # of generated tracks # of generated tracks Michel positrons in the solid angle covered by the spectrometer or isotropically over the whole detector; no significant differences; positron momentum > 30 MeV;

A “by-product”: momentum estimation Not a momentum reconstruction, but a reasonable starting point for more refined tracking algorithms (like MINUIT).

Conclusions  Algorithm looks to work well;  > 95 % for 5 mixed tracks & > 91 % for 10; more efficient for higher momentum tracks (encouraging !).  Performances be only slightly (~ 1 %) affected by worsening the z resolution or reversing the scanning direction. z resolution or reversing the scanning direction.  Technical note soon.  Suggestions (to investigated): begin the search from outermost radii & try to recover isolated hits. begin the search from outermost radii & try to recover isolated hits.  Possible improvements:  perform a cuts fine tuning;  follow all possible links between segments;  use absolute timing information as linking tool;  perform a better track extrapolation;  include random noise;  insert signal propagation in the simulation code …

 M1 tests with four test chambers and various readout (digiscope 500 MHz, flash & other ADCs..)  =.21 ns 1.00 &.60 Tesla P= 158 & 258 MeV/c  parallel < 1 % No Field P= 158 & 258 MeV/c DC tilted by  1 DC tilted by  2 Trigger timing resolution Measurement of four DC times