ANCIT WORKSHOP Torino, 30-31 March 1998 Conversion to simple underground facility network under modern underground facility technologies Taishi Deguchi.

Slides:



Advertisements
Similar presentations
Geneva, Switzerland, 22 September 2012 FTTx in Japan: Past, Present, and Prospects for the Future Ken-Ichi Suzuki, NTT Access Network Service Systems Laboratories,
Advertisements

4 Wiring Systems. 4 Wiring Systems Objectives Know where to find codes and authorities for an installation. Recognize the marks of the most popular.
The Telephone – Part 2. The Telephone System One of the first problems in building todays telephone network was how to connect one telephone to any one.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
University of Baltimore Telecommunications Technology
Asia Geospatial Forum, PWTC, Kuala Lumpur 25 th September 2013.
Disconnected access to network information for field personnel Bentley PowerMap Field for Communications.
Utilization of Geospatial Technologies in Telecom 3 rd April 2012 Qtel.
This Project consists of the following major elements Install new 15kV padmount switchgear Underground 15kV conduits and cable Underground Communications.
Major Underground Design John Perez. Underground Engineering Design Practices Three Phase Circuit –Infrastructure: Ductbanks & Manholes All three phase.
Fiber Distribution Point for Underground VSOF-CS403A-SD Connector type Fiber Distribution Point.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
Smart Building Solutions. Visit us at Hasibat Information Technologies Co. K.S.C.C.
Problems and solutions in optical network plants in Hungary Torino, March 1998 Technological problems and solutions in optical network plants in.
The Bright Future of Wireless Communications
The Electrical Grid: America’s Funnest Crisis. History of the Power Grid: Overview Historical Perspective Materials Capacity Regulations.
3 S HOUSING (SITE, SERVICES, STRUCTURE). RURAL HOUSING
APPLIED LOGISTICS The Productivity Improvement Program for Warehousing and Transportation.
INTRODUCTION TO FIBER OPTICS
Confined Space ASSE / San Jose – July 8, 2008 Paul R. Burnett Safety Program Administrator Santa Clara Valley Water District
A PROJECT REPORT ON DIGITAL LOOP CARRIER (DLC) Under the Guidance of MR. A.B. SINGH SUBMITTED BY: PALASH GUPTA NIDHI VERMA A.N. RAMANI P. ANUPAMA LUKESHWARI.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
The Hardware Behind the Internet A virtual tour. Pictorial View of the Internet Backbone The “Internet Backbone” refers to the principal data routes between.
Network Design Essentials
Telecom Nordic & Baltics Product Presentation Connectivity Convention Grounding kit for Finnish fiber cables with metal.
Evaluation of the environmental impact of wired telecommunication networks in Japan Kazue Ichino Takahashi NTT Energy and Environment Systems Laboratories.
SMUCSE 8344 Term Paper Topics (Always Incomplete).
Critical Need for Communications Protection in a Deregulated Power Market 1999 IEEE/PES Ernest M. Duckworth Jr., P.E., Senior Member IEEE & John S. Duckworth,
ANCIT WORKSHOP Torino, March 1998 Broadband Access Network Design Enrico Mondo Sirti S.p.A. - Design Centre Via Galileo Galilei, Cassina.
OVERVIEW GIS AN APPLICATION NATURAL RESOURCE By: Mangapul P.Tambunan Department of Geography Faculty of Mathematics and Natural Sciences University of.
EMCORE Corporation Proprietary 1. 2 Why use Satellite, RF & Microwave Fiber?
One Step At A Time Retaining Traditional PBXs While Benefiting from IP Telephony.
D2-01_12 Disaster resilient telecommunications systems for smart grid in Japan Atsushi Ohara Shikoku Electric Power Co., Inc. Japan
Estonian Broadband Development Foundation February 2014 Athens.
Title Sub-title PLACE PARTNER’S LOGO HERE European Commission Enterprise and Industry Craiova City CHUMS Changing Habits for Urban Mobility Solutions Gabriel.
Intro to Network Design
Fiber Optic Network Solutions. Aware of the growing optical fiber network market, TELE DESIGN has developed FiberDoc, a documentation system for this.
ANCIT WORKSHOP Torino, March ANCIT WORKSHOP Torino, March 1998.
ANCIT WORKSHOP Torino, March ANCIT WORKSHOP Torino, March 1998.
ANCIT WORKSHOP Torino, March 1998 Cost optimisation of optical access networks Peter Hale, Martin Davies Pirelli Cables, UK David Brittain University.
Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel
Utility Engineers, PC.  Generation  Transmission  Distribution.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.
ANCIT WORKSHOP Torino, March 1998 Optical Network Construction in Customer Premises by Sadaaki TAKANO NTT Access Network Systems Laboratories.
Torino, March 1998 ANCIT WORKSHOP Telecom Italia experience with the use of NO-DIG techniques Renato Polidoro Giovanni Ciochetto.
ANCIT WORKSHOP Torino, March 1998 NO-DIG(Trenchless method) Technologies in Reducing Information Infrastructure Costs and Creating New Construction.
Bringing together leading research institutions to advance electric ship concepts. Power Interconnect Tool Angela Card Mississippi State.
Torino, March 1998 ANCIT WORKSHOP Site investigation and output of utilities maps using GPR (Ground Penetrating Radar) Giovanni Ciochetto Renato.
1 Welcome John Mellis BT Laboratories Blown Fibre as a Reduced Cost Network Planning Solution.
1 Dr. Hakan Lucius M. Otto Hüsken Original presentation is modified for Internet use. Hazard Risk Management in Europe and Central Asia Workshop Istanbul,
Optical Termination Box VSOF-OTB-E OPTICAL TERMINATION BOX [OTB-E-48c]
Splitter Module Distribution Frame VSOF-SMF SPLITTER MODULE DISTRIBUTION FRAME.
SYNERGIES IN ROLL-out of networks by Energy UTILITIES and telecoms 26 June 2014, Brussels Joachim Hoenig, Director, Brussels Representatives Office Group.
PUBLIC UTILITIES COMMISSION OF LATVIA THE STRUCTURE OF RECOMMENDATION ON REGULATED ACCESS TO NGA AND THE ROLE OF PUBLIC CONSULTATION AS THE FIRST STEP.
The Importance of Accurate Documentation for Fiber Optic Networks Randy Anderson VP – Software Advance Fiber Optics.
6/14/06APS Fiber Facts, Paul H. Bott1 APS Fiber Optics FACTS: 1.APS regularly installs fiber optics cables on its power lines for internal telecommunications.
PUBLIC UTILITIES COMMISSION OF LATVIA PRACTICAL EXPERIENCE OF NGA SOLUTIONS IMPLEMENTATIONS, ESTABLISHMENT OF NGA INVESTIGATIONS AREAS Aleksandrs Čerņakovs-Neimarks.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
POWERLINC A flexible, reconfigurable power distribution system designed specifically for control rooms. 1.
27-28 April 2015 Eng. Mubarak Yusuf Al-Kawari Presented by:
Growth Management Amendments Land Use & Transportation
Electricity is produced at the power station.
Success story: Alfa Laval
BROCHURE & PRODUCT DETAILS
Detector hall in mountain regions
Model of block distribution system (Fukuoka City Waterworks Bureau)
Organics Waste Processing Facility Construction Progress Update December 15, 2010
SOGETREL’s experience
ELECTRICAL INSTALLATION
Presentation transcript:

ANCIT WORKSHOP Torino, March 1998 Conversion to simple underground facility network under modern underground facility technologies Taishi Deguchi NTT Access Network Systems Laboratories

ANCIT WORKSHOP Torino, March 1998 Social Background in Japan

ANCIT WORKSHOP Torino, March 1998 Social Background in Japan Expansion of Underground Facilities

ANCIT WORKSHOP Torino, March 1998 Social Background in Japan Expansion of Underground Facilities Restrictions on Underground Work

ANCIT WORKSHOP Torino, March 1998 Social Background in Japan Expansion of Underground Facilities Restrictions on Underground Work Provision of Basic Facilities using Social Capital

ANCIT WORKSHOP Torino, March 1998 Social Background in Japan Expansion of Underground Facilities Restrictions on Underground Work Provision of Basic Facilities using Social Capital Ensuring Reliability during Earthquake

ANCIT WORKSHOP Torino, March 1998 NTT Building User Buildings / Houses Configuration of Simplified Basic Facilities for Underground Networks

ANCIT WORKSHOP Torino, March 1998 Cable Tunnels Trunk Conduits Configuration of Simplified Basic Facilities for Underground Networks

ANCIT WORKSHOP Torino, March 1998 Shared Facilities Configuration of Simplified Basic Facilities for Underground Networks Cable Tunnels Trunk Conduits General Conduits

ANCIT WORKSHOP Torino, March 1998 Distribution Conduits Configuration of Simplified Basic Facilities for Underground Networks General Conduits Shared Facilities Cable Tunnels Trunk Conduits

ANCIT WORKSHOP Torino, March 1998 Cable Tunnels Routes Scheduled to be Provided Aged Conduits Existing Conduits Example of Integrating Routes Conventional

ANCIT WORKSHOP Torino, March 1998 Cable Tunnels Trunk Conduits Use of Existing Conduits Example of Integrating Routes Future

ANCIT WORKSHOP Torino, March 1998 [Route Classification] Fundamental Concepts for the Provision of Basic Facilities Routes that will become necessary in the future

ANCIT WORKSHOP Torino, March 1998 [Route Classification] [Topics][Detailed Plans] Fundamental Concepts for the Provision of Basic Facilities Routes that will become necessary in the future Provision of flexible and simple facilities Planned construction and maintenance of facilities

ANCIT WORKSHOP Torino, March 1998 [Route Classification] [Topics][Detailed Plans] Fundamental Concepts for the Provision of Basic Facilities Routes that will become necessary in the future Provision of flexible and simple facilities Effective use of existing facilities Planned construction and maintenance of facilities Prolongation of life of existing facilities

ANCIT WORKSHOP Torino, March 1998 [Route Classification] [Topics][Detailed Plans] Fundamental Concepts for the Provision of Basic Facilities Routes that are not necessary in the future Routes that will become necessary in the future Provision of flexible and simple facilities Effective use of existing facilities Planned construction and maintenance of facilities Prolongation of life of existing facilities

ANCIT WORKSHOP Torino, March 1998 [Route Classification] [Topics][Detailed Plans] Fundamental Concepts for the Provision of Basic Facilities Routes that are not necessary in the future Effective utilization for new needs Routes that will become necessary in the future Use of distribution facilities Lending facilities to other companies Provision of flexible and simple facilities Effective use of existing facilities Planned construction and maintenance of facilities Prolongation of life of existing facilities

ANCIT WORKSHOP Torino, March 1998 [Route Classification] Provision of flexible and simple facilities [Topics][Detailed Plans] Routes that are not necessary in the future Effective use of existing facilities Effective utilization for new needs Reduction of assets Fundamental Concepts for the Provision of Basic Facilities Routes that will become necessary in the future Planned construction and maintenance of facilities Prolongation of life of existing facilities Use of distribution facilities Lending facilities to other companies Elimination of unused facilities

ANCIT WORKSHOP Torino, March 1998 Promotion of productivity improvements [Environment] Replacement of cables for bringing “Fiber to the home” Lending facilities to other companies Spreading superannuation of facilities Trends within and outside the Company and Service Tools

ANCIT WORKSHOP Torino, March 1998 Simplification & Flexibility Effective use Free access Shared use [Topics] Trends within and outside the Company and Service Tools Promotion of productivity improvements [Environment] Replacement of cables for bringing “Fiber to the home” Lending facilities to other companies Spreading superannuation of facilities

ANCIT WORKSHOP Torino, March 1998 [Service Tools] Smoothening of business Management of facilities Management of installation space [Topics] Trends within and outside the Company and Service Tools Promotion of productivity improvements [Environment] Replacement of cables for bringing “Fiber to the home” Lending facilities to other companies Spreading superannuation of facilities Free access Shared use Simplification & Flexibility Effective use

ANCIT WORKSHOP Torino, March 1998 Facilities data Maps data Ground data Users data Capacity Position Aging status Cable data Facilities Management System Shared Database System Paper maps available in the market Urban plans Conversion to electronic data

ANCIT WORKSHOP Torino, March 1998 Facilities data Maps data Ground data Users data Capacity Position Aging status Cable data Facilities Management System Shared Database System Conversion to electronic data Offer the required data Paper maps available in the market Urban plans

ANCIT WORKSHOP Torino, March 1998 Facilities data Maps data Ground data Users data Capacity Position Aging status Cable data Facilities Management System Shared Database System Conversion to electronic data Applications Shared use of facilities Construction plan Maintenance Offer the required data Paper maps available in the market Urban plans

ANCIT WORKSHOP Torino, March 1998 Subscriber lead-in conduit Single conduit System Configuration of New Underground Distribution Facility Single conduit2 ~ 6 inches DiameterComponents 1 or 2 inches 2 ~ 6 inches Subscriber lead-in conduit Modified branch conduit

ANCIT WORKSHOP Torino, March 1998 System Configuration of New Underground Distribution Facility Single conduit Lead-in cable Distribution cable Single conduit2 ~ 6 inches DiameterComponents 1 or 2 inches 2 ~ 6 inches Subscriber lead-in conduit Modified branch conduit

ANCIT WORKSHOP Torino, March 1998 Conventional Type Conduits Arrangement Occupancy ratio ; 100% Concept of Trunk Conduit

ANCIT WORKSHOP Torino, March 1998 Free-space Conduit Arrangement Equal space for installing optical fiber cable cores in Compactness Conventional Type Conduits Arrangement Occupancy ratio ; 100% Concept of Trunk Conduit Occupancy ratio ; 50% Outer pipe Inner pipes

ANCIT WORKSHOP Torino, March 1998 Outer pipe Inner pipes Manhole side wall Duct sleeve Inner pipes fixing socket Arrangement of Free-space Conduit

ANCIT WORKSHOP Torino, March 1998 Large diameter optical fiber cable Cables of other companies, etc. Metalic cable (temporarily placed) Arrangement of Free-space Conduit

ANCIT WORKSHOP Torino, March 1998 Inner pipes Arrangement of Free-space Conduit

ANCIT WORKSHOP Torino, March 1998 Small diameter optical fiber cable Free space Arrangement of Free-space Conduit

ANCIT WORKSHOP Torino, March 1998 Pit High density installation of cables Installation technique of concentrating cable connection points in pit Cable Tunnel High Density Cable Tunnel

ANCIT WORKSHOP Torino, March 1998 Pit High density installation of cables Installation technique of concentrating cable connection points in pit Cable Tunnel High Density Cable Tunnel Shared use Space used by NTT Space used by other companies

ANCIT WORKSHOP Torino, March 1998 Examples of Aseismatic Technologies

ANCIT WORKSHOP Torino, March 1998 Expansible and flexible joint for open-cut cable tunnel Steel fiber mixing into manhole duct concrete Flexible conduit for building access facilities Examples of Aseismatic Technologies

ANCIT WORKSHOP Torino, March 1998 by FAX ; by ; Taishi Deguchi NTT Access Network Systems Laboratories Please notify me of questions that I could not answer to today or of additional questions