Kjell Nelin OVSA Site Manager, Center for Solar-Terrestrial Research New Jersey Institute of Technology.

Slides:



Advertisements
Similar presentations
2012 Desert Hills PolyPatch Fiber Optic Cable Installation Desert Hills, Carefree Arizona Cable Trench Sealing and Waterproofing With PolyPatch.
Advertisements

Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
Hargrave Street Pumpstation – Site Preparation July 2014.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Sylvan Theater Column Restoration Project
Kjell Nelin OVSA Site Manager, Center for Solar-Terrestrial Research New Jersey Institute of Technology.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 11/7/2011OVSA Technical Design Meeting.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 11/7/2011OVSA Technical Design Meeting.
Physics 681: Solar Physics and Instrumentation – Lecture 7 Carsten Denker NJIT Physics Department Center for Solar–Terrestrial Research.
Phase Difference = Phase Difference = 0.05.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Презентація за розділом “Гумористичні твори”
Центр атестації педагогічних працівників 2014
Галактики і квазари.
Характеристика ІНДІЇ.
Процюк Н.В. вчитель початкових класів Боярської ЗОШ І – ІІІ ст №4
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 03/16/2012OVSA Preliminary Design Review.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 03/15/2012Preliminary Design Review.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Fiber Optic Data Network Project Tuscaloosa County School System 2006.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 03/16/2012OVSA Preliminary Design Review.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
Gillentown Trailhead Access Control Project  Images are before the Yamaha Grant  Grant was provided to the SSRT for Access Control.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
Духовні символи Голосіївського району
MF Pad Considerations. Date: June 9, Hz Power Converter –The 400-Hz connectors installed on power pop-ups: The part number for the 400-Hz connector.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
SCC-18 Meeting NEC ROC Code Panel 3 Report Dave Mills & Mel Sanders January 3, 2007.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Miller Driscoll Building Committee Update Tuesday, January 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations Miller-Driscoll.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Paddy’s Flats Construction laydown area (Total Disturbance 12.8ha)
Building Committee Presentation March 03, MAIN ENTRANCE.
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
Planning the Project Unit 1 – Lesson 12.
ABT-EC EYETS Activities 2nd reports
Aircraft Brakes.
Solar-B Science Working Group
Site Based Preconstruction – Enabling Work
Hopewell Valley Regional School District
Ramar-Hall Addition: 2017.
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
Meeting of the LCLS Facilities Advisory Committee
Проф. д-р Васил Цанов, Институт за икономически изследвания при БАН
ЗУТ ПРОЕКТ на Закон за изменение и допълнение на ЗУТ
О Б Щ И Н А С И Л И С Т Р А П р о е к т Б ю д ж е т г.
Електронни услуги на НАП
Боряна Георгиева – директор на
РАЙОНЕН СЪД - БУРГАС РАБОТНА СРЕЩА СЪС СЪДЕБНИТЕ ЗАСЕДАТЕЛИ ПРИ РАЙОНЕН СЪД – БУРГАС 21 ОКТОМВРИ 2016 г.
Сътрудничество между полицията и другите специалисти в България
Съобщение Ръководството на НУ “Христо Ботев“ – гр. Елин Пелин
НАЦИОНАЛНА АГЕНЦИЯ ЗА ПРИХОДИТЕ
ДОБРОВОЛЕН РЕЗЕРВ НА ВЪОРЪЖЕНИТЕ СИЛИ НА РЕПУБЛИКА БЪЛГАРИЯ
Съвременни софтуерни решения
ПО ПЧЕЛАРСТВО ЗА ТРИГОДИШНИЯ
от проучване на общественото мнение,
Васил Големански Ноември, 2006
Програма за развитие на селските райони
ОПЕРАТИВНА ПРОГРАМА “АДМИНИСТРАТИВЕН КАПАЦИТЕТ”
БАЛИСТИКА НА ТЯЛО ПРИ СВОБОДНО ПАДАНЕ В ЗЕМНАТА АТМОСФЕРА
МЕДИЦИНСКИ УНИВЕРСИТЕТ – ПЛЕВЕН
Стратегия за развитие на клъстера 2015
Моето наследствено призвание
Правна кантора “Джингов, Гугински, Кючуков & Величков”
Безопасност на движението
Roof PSS Bunker Project CDR
Presentation transcript:

Kjell Nelin OVSA Site Manager, Center for Solar-Terrestrial Research New Jersey Institute of Technology

Inner Spiral Outer Spiral New Roads Trench Lines

 Mechanical inspection/repairs  Removal of cables and obsolete parts possible demolition of existing control room.  Install cables for control/motor interface, encoders all safety interlocks  Contractor to install antenna control/drive system.  Overhaul hydraulic systems?  Install new receiver/cryo system (Caltech).  Install new power cables (Caltech)  Paint

 Hydraulic system to be overhauled as required

 Roads/Grading  Pour pads (concrete contractor)  Trenching/conduit (contractor)  Fencing (contractor)  Breakout array center - to be defined (contractor)  Breaks out power and opto cables to 9 antennas.  Cable installation (NJIT) Multi-fiber optical cables Power cables  Work to proceed in 4 phases Phase 1 - Antennas Breakout Shed

 All ground disturbing work in OVSA1 - OVSA6 and in the area of telescope #13 requires the presence of an archeologist and aTribal monitor.