Electrical & High Temperature Utility Distribution Upgrade
Last Two Years – 22 outages for total of 304 hours (12+ days)
Electrical & High Temperature Utility Distribution Upgrade Electrical Distribution Condition
Electrical & High Temperature Utility Distribution Upgrade Feeder lines are over utilized and failing Too many buildings Share the same lines Cable, conduit, and vaults are failing
Electrical & High Temperature Utility Distribution Upgrade SUBSTATIONS - Old/Obsolete - Fail to meet standards of access - Not compatible with RMP
Electrical & High Temperature Utility Distribution Upgrade STADIUM SUBSTATION UPGRADE
Electrical & High Temperature Utility Distribution Upgrade MEDICAL SUBSTATION REPAIRS AND UPGRADES
Electrical & High Temperature Utility Distribution Upgrade RED BUTTE SUBSTATION UPGRADES
Electrical & High Temperature Utility Distribution Upgrade TRANSFORMER REPLACEMENTS REQUIRED
Electrical & High Temperature Utility Distribution Upgrade FAILED CIRCUIT BREAKERS TO BE FIXED
Electrical & High Temperature Utility Distribution Upgrade BEFORE AFTER EXAMPLES OF SWITCH REPLACEMENTS BEFORE AND AFTER
Electrical & High Temperature Utility Distribution Upgrade BEFOREAFTER EXAMPLES OF SWITCH REPLACEMENTS BEFORE AND AFTER
Electrical & High Temperature Utility Distribution Upgrade Stadium substation construction schedule March 2013 – October 2013 Impacts: Power outages, equipment deliveries, and work around parking lots
Electrical & High Temperature Utility Distribution Upgrade Campus-wide electrical distribution schedule March 2013 – December 2014 Phase 1: Lower & Upper Campus
Electrical & High Temperature Utility Distribution Upgrade 15 Electrical Distribution Lower Campus Ductbank Routing
Electrical & High Temperature Utility Distribution Upgrade 16 Electrical Distribution Upper Campus Ductbank Routing
Electrical & High Temperature Utility Distribution Upgrade 17
Electrical & High Temperature Utility Distribution Upgrade Resources Construction impacts map Current projects Scott Jefferson,