BIS Internship Summary Powerpoint Created by BIS Student Cylor Morgan (used with permission)

Slides:



Advertisements
Similar presentations
for Storm Survival, Long Term Reliability and Safety
Advertisements

Steel Outlet Boxes Crouse-Hinds Training Module. Outline z Applications z Types of Steel Boxes y Options z Uni-Mount TM Cover z Pre-Fabricated Boxes z.
Connectors and Cables Types of connectors and cables Wiring standards Soldering principles Cable testing.
Judging The Model “A” Area 2 Electrical System
Radio Tower Safety The art of being around to make that first QSO on the new antenna…
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Ion source maintenance on the MAT 253
4/16/08SZ / Sound1 Tubular Glockenspiel How to Make Glokenspiel: 1.Get ten feet of 1/2-inch Electrical Metallic Tubing (EMT) pipe 2.Cut it into the five.
Report #5 Brief Description A laborer was steam cleaning a scraper. The bowl apron had been left in the raised position. The hydraulically controlled apron.
LED Signs Installation By LED Craft Inc. P20mm Full Color LED Sign : 32” high x 90” wide Lit Box Sign: 18” high x 90” wide
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
A PowerPoint presentation of the Use the right arrow key on your keyboard to advance the images.
Telecom Cabling Grounding and bonding.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
Grade 4 Science Unit: Light
Electromagnetics for 8th grade
Formula High School: Team Del-Tech. Team Del-Tech Left to right: Xao Yang, Rob DeLeers, Bart Amenson, Eric Simon, and Derek Blackman.
Greenhouses limit increase: GCE Greenhouse Greenhouse: Building used to house and grow plants -Climate can be controlled -Amount of water.
EET Survey of Electronics
1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.
Electrical Power Systems
General idea of a couple of check rod system and adjustments
Residential Wiring Facts
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Electric Parts list on next page White Lights Red Lights Side Referee Chief Referee Red White Off On Red White Red White 3 conductor wire 4 conductor wire.
Welcome To The 1 st Choice Electrical Estimating System #1 in Estimating software Click To Start Click F5 to open the program then Start to run.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
The Art of Grounding. Importance of Grounding Earlier, we said that the load center was the heart and soul of the electrical system. Following that trend,
Building for the Future By: Green inc.. Location Colorado Springs, Colorado Outskirts of Colorado springs Average temperature of winter is 18* Summer.
Appendices Subpart R Steel Erection
RIDDLE ME THIS! RIDDLE ME THAT!.
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
EarthScope’s Plate Boundary Observatory; a Northern California Installation.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Electromagnets By: Emily M.
CORE DRILLING MACHINES AND ACCESSORIES
Bridges Introduction to design.
Circuits A circuit always needs a power source, such as a battery, with wires connected to both the positive (+) and negative (-) ends. A circuit can also.
Installation of heating cables, a light and an outlet with a thermostat and two pole circuit breaker.
Electricity and Magnetism Erik Larson Grade 5 Unit Overview.
Ch. 24: Electric Current and Circuits Vocabulary: electrical energy, electric current, circuit, closed circuit, conductor, closed circuit.
Basic Electricity By: Rebecca Garcia. Electricity Electricity is seen around us every day. Electrical outlets are found throughout our house. Lightning.
Electrical Installation AMI- 17.0
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
How to move your horn.. 1.This one is a shot of the horn with the acorn nut removed. STEP 1.
 1. The Manual running of scenery on the stage floor  2. The Flying of Scenery  3. Moving scenery on Casters  4. Scenery coming through the stage.
Activity # 1 Problem Solving/ Engineering Design Process IET 120-Technology Systems Team Harris & Jent.
Objective 39 Honors Geometry WP: Pythagorean Theorem.
 Nonmetallic sheathed cable: copper or aluminum wire covered with paper, rubber, or vinyl for insulation  Armored cable: flexible metal sheath with.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
3’ door 32 ‘ 14 ‘ 18 ‘ Rear ramp door 8’4” 3’ x 16’ slide out 3’ x 10’ slide out 3 ‘ 8 ‘ 12 ‘ FRONT Top View Dimensions.
Grounding the Electrical System Reference: AAVIM “Electrical Wiring” Created May 2007.
ELECTRICAL INSTRUMENTS ( service and utilization )
Smitty’s Two Minute Drill Grounding
Electric Circuits SNC1P1 Findlay.
Installation Walkthrough Image Guide
Bending Electrical conduit
Topic Name: INSULATORS
Deconstructing a Hubsan and Rebuilding
Escalator Installation
Local communities and municipalities
SWITCHES W. C. “Buster” Hounshell Spring 2002.
Types of Cables.
Grounding for Amateur Radio
Installation And Estimation of Service Connection
Vanderbilt Student Volunteers for Science Training Presentation
Teacher training resource: Robotic Assembly
Smitty’s Two Minute Drill Grounding and Bonding
BUILDING AN AUTONOMOUS QUADCOPTER.
Presentation transcript:

BIS Internship Summary Powerpoint Created by BIS Student Cylor Morgan (used with permission)

Internship tasks The first three weeks I was working with the materials coordinator. We would find the proper steel needed and label it. The steel number on the prints was not the same as the stamp on the steel. We had to carry around the bill of materials to correctly identify the various products. Such as high single and double bus supports (240 on site), low singles and doubles (72 total) surge arrestors(90), CCVT’s(54), ppt’s (8), v-type switches (48). The second or third week I got my forklift license and could stage materials for the iron crew setting the steel. Soon after the iron workers quit. I was put in the position of an iron worker and had a two man crew I was operating the forklift while they spotted and bolted the steel to the piers.

Internship tasks I learned how the foreman keep track of production, each task such as setting structural steel, laying conduit, laying grounding grid to setting up a battery rack in the control house. Just about every job has a payment in hours. Examples: ground cable run is worth.098 hours per foot, setting a low bus support which was a job I had is worth 2 hours per pole and the installed insulator on top is another 1.5 hours. Everyday we got faster and better at doing the job. My goals were usually a 200 percent production rate per actual man hours used. Soon that became easy until we were running close to a 300 % So if my crew was not on overtime we used up 30 hours of labor and averaged close to 60 hours of production per day. The last day setting steel we had 101 hours of production so an ump of 3.36

Internship tasks That was my job the entire internship until we finished the structural steel. Currently we are setting two part insulators on top of some of the steel we have set. My job has been pretty much the same since I arrived. Nothing too new. I learned how to make exothermic welds that we used to connect the copper ground grid. But since the steel crew quit its only been my guys doing steel. Currently this week we have had a surge of new workers so my crew has grown by three.

Edith Clarke Station No. 454 Crowell, Texas Upon Arrival

Edith Clarke Station No. 454 Crowell, Texas two weeks ago.

Pictures and Descriptions Dead-End Sructures: 14 on site 95’ to the top of the static line. String bus: carries the electricity that comes into the station. The electricity will be brought to the aluminum pipe that runs on top of insulators attached to the steel. It is brought down using jumpers welded onto it. Hangs at 80ish feet off the ground.

Pictures and Descriptions High Double bus support: single structure that has two insulators mounted on top. High V-type switch: not completed. The beam on top of the legs was the heaviest thing I had to set that high. It weighed 1938 and is 26’ 11” off the ground.

Pictures and Descriptions The very top of the insulators has a support that will eventually get a 6” aluminum pipe place in it. That pipe will carry the electricity that is dropped from the string bus by jumpers.

Pictures and Descriptions Fernando and Crespin attaching the nuts to the anchor bolts, securing the steel to the pier.

Pictures and Descriptions Unboxing insulators: print # 6337, weigh 550 pounds 8 feet long and are solid porcelain with steel top and bottoms. Come 6 to a box We used doneage to protect the glass from the ground. Used a variety of techniques to get them out of the box. Settled with using a 16 foot choker to catch the ends.

Pictures and Descriptions Insulators 6337: these particular ones will get the plates seen in the picture attached to the bottom. They will then be put on either a high or a low double.

Pictures and Descriptions Pier for a dead-end structure. The pier is six foot in diameter and is 26 feet deep.

Pictures and Descriptions Foreman installing the mounting horns on the dead-ends for the station lights.

Pictures and Descriptions Fernando bolting the two piece insulators together. This item will be placed on top of the CCVT steel.

Pictures and Descriptions CCVT insulator: first piece can be picked and placed by the top. The entire structure has to be rigged from the bottom. We use 4 16’ chokers to set these. It weighs only 730 pounds.

Pictures and Descriptions CCVT steel: 54 on site worth 2 hours. 13 feet 11 inches tall without the two part insulator.

Pictures and Descriptions Cable trench: a cable tray will be covered eventually but this runs around the control building and also a north to south run on both sided of the site.

Pictures and Descriptions A switch crew from Tahlequah, Oklahoma came in last week they are only setting v-type switches.

Pictures and Descriptions A completed v-type switch: the middle insulator is able to swivel and a motor operated switch is used to divert the direction the a b c phase electric current.