CDF Decommissioning Status Jonathan Lewis D&D Task Force 22 November 2011.

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

Safety Training Safety First. EXITS All exit doors shall be maintained in operable condition. Exit doors shall not be locked, chained, bolted, barred,
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
LArTF and MicroBooNE Installation
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
CDF → ORKA: Preliminary Cost and Schedule Estimates Jonathan Lewis ORKA Task Force 2 March pm Jonathan Lewis ORKA Meeting 2 March 2012date corrected.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
Feedback and Improvement Bizarre Accident of the Week Safety Photo of the Week Collider-Accelerator Department Take 5 for Safety.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Section B Inventory Process and Forms. General Inventory Actions %Getting Started Set inventory goals and objectives %Who District Program Manager Site.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
FLOOD MITIGATION OBSERVATIONS AND LESSONS FROM A FLOOD IN THE SMITH FIELDHOUSE BRIGHAM YOUNG UNIVERSITY AUGUST 2006.
CDF Decommissioning Status Jonathan Lewis Master Planning Meeting 9 November 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Safety Aspects of the Disability Empowerment Center.
Building Plans.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
ORKA Preservation Task Force ORKA Preservation Task Force first meeting Wednesday, February 8, Notes by Peter H. Garbincius Notes from meeting are.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
Missoula County Space Needs Plan Planning Logistics Phasing Plan Schematic Designs Questions.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Detector Decommissioning Related Activities at DØ George Ginther Fermilab and University of Rochester 23 January 2012.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Exhibit plans for CDF/DZero/Tevatron Kurt Riesselmann Director’s Review Sept. 15, 2011.
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
WBS Experiment Infrastructure: Design Status Discussion Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 6/17/11.
OTE Building PMG Report June 25, 2012 Rhonda Merchut 1.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
This talk is not a summary of costs for conventional facilities This talk is Review of conventional facilities used by CDF Discussion of status of systems.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
SCSPF CLEANROOM UPDATE Flood Recovery Plan and Status April 30, 2012 Allan Rowe.
S A Griffiths CM42 June 2015 Electrical & Control.
Far Experimental Hall Hutches Civil Construction
J. Seeman Assistant Director for PPA/LCLS
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

CDF Decommissioning Status Jonathan Lewis D&D Task Force 22 November 2011

J. Lewis--CDF Decomminssioning Status2 Schedule (Review) October-December  Secure detector  Recover electronics  Cleanout highbays  Consolidate/remove cabinets  Remove gas racks, motor-generators, etc. December  Demolish mezzanines January  IARC construction begins  No access to west door  Recover PMTs, etc. from detector

Schedule, cont. March-April  Remove cable bridge April  IARC tie-in work on north side  Begin collision hall work Ongoing  Counting room clean-up  Remove process systems  Life safety improvements for tours  IARC integration J. Lewis--CDF Decomminssioning Status3

Status Systems secured  No refrigerants, flammable gas, or HV  All detector power off  Solenoid warm Clean-up in full swing  Priority to recover of items useful to other efforts  Throwing away CDF-specific items as we encounter them  ~30 skids out the door in the past month New lab space for mu2e  2 nd floor work room, main floor welding area  Trying to make more space soon to meet demand J. Lewis--CDF Decomminssioning Status4

5 Gas racks gone Scrap Mezzanine ready for demolition MGs and test magnet ready for removal 1 st floor CR being cleared Status 11/8

Status Today J. Lewis--CDF Decomminssioning Status6

Schedule Status Mostly on schedule  West bay nearly done  Mezzanine demolition delayed to January to accommodate IARC ground breaking  Need west door truck access.  East bay work rearranged  Ahead on gas systems  Behind on cabinet clean out  More control system work than anticipated  First floor counting room pushed earlier to make equipment recovery easier  More equipment recovery work than planned  Collaborators showed up at the end of the run with requests and demands J. Lewis--CDF Decomminssioning Status7

Issues Proposed experiments create significant uncertainty for D&D  Protoplasma  ORKA Cable bridge plan assumed 20-year display phase  Removing bridge before detector makes detector removal trickier If CDF is to be rolled out in the next few years, we should defer cable bridge removal until then  Work is on hold pending guidance from the Director If CDF will be dismantled for experiments, how far do we go with the display plan  Dismount plug? J. Lewis--CDF Decomminssioning Status8

Coordination with IARC Electrical  Freeing up experimental power substation  Moving conduit for doorway Mechanical  Coordinating moves of sprinkler and chilled water pipes for interferences with interconnects, etc. Mezzanine removal Planning (Dervin Allen)  Tours for A&E, contractors, etc.  Locating utilities, electrical circuits  Reduced generator needs during utility work  Evaluating access, connections  Truck access  CDF roof access  etc. etc. etc J. Lewis--CDF Decomminssioning Status9

CY2012 CDF Building Improvements on D&D Budget Main Stairwell  Remove abandoned chilled water pipes  Relocate elevator pump 1 st Floor  Remove abandoned chillers, etc. 2 nd floor  Improve exits  Isolate conference rooms and egress paths from assembly area Collision hall  Sprinklers  Fire doors  Exit lighting J. Lewis--CDF Decomminssioning Status10

Backup J. Lewis--CDF Decomminssioning Status11

Overview PPD is implementing Phase 1 of the DOE-approved decommissioning plan  Remove all hazards related to the experimental program  Put experimental areas on display to be included in Fermilab’s educational visitor program J. Lewis--CDF Decomminssioning Status12

J. Lewis--CDF Decomminssioning Status13 Scope All hazards related to CDF experimental program mitigated 2nd floor, collision hall and adjacent section of Tevatron tunnel ready for tour groups of ≤49 people West high bay cleared for iARC use East high bay prepared for PPD detector development and construction lab Assembly pit prepared for joint PPD/iARC use Office areas and 1 st floor counting room cleaned and ready as adjunct to PPD activities in high-bay 3 rd floor computer room for CDF analysis servers

J. Lewis--CDF Decomminssioning Status14 Counting RoomTheatre Stairs to parking lot West Bay-- IARC: Broom Clean Mezzanine Removed 30’ Deep Pit: Cable Bridge Removed East Bay--PPD: Useful hardware recovered Workspaces readied Collision Hall Access to section of Tevatron tunnel

Plans for Display Theatre  Place for visitors to assemble  Meet scientist?  Movie? Trigger room  Electronics on display  Other displays? Control room  Flashing screens look almost like we are running Collision hall  North and west sides blown open  Plastic covers, view of COT face, etc.  South and east, closed up in running configuration J. Lewis--CDF Decomminssioning Status15

Display Effort Working with Public Affairs and Education Making posters to document our achievements  Mix of hardware and physics  Ben Kiliminster coordinating Interactive activities geared mostly toward middle school  Cosmic-ray test stand, etc. CDF people: Ben Kilminster, Anna Mazzacane, JDL Life safety improvements in tour areas  Doors, walkways  Remove obstructions  Remove halon, sprinkler mods J. Lewis--CDF Decomminssioning Status16

J. Lewis--CDF Decomminssioning Status17 Planned Collision Hall Layout

J. Lewis--CDF Decomminssioning Status18 Storage of components that may have future use Detector Items  They are safe in situ  Not worth labor to pull down if no use identified  Phototubes, Radeka preamps, etc. Shelf Items  Over the years CDF has collected lots of good stuff  What you want for a detector lab (fittings, valves, connectors)  We will sort to keep what is most generally useful  Don’t want building to be a warehouse  Plan for storage mezzanines in pit alcoves without crane coverage  Sufficient space for all lockers now in high-bay

Alcove Plan J. Lewis--CDF Decomminssioning Status19 Stairs N