Southern Nevada HOV Plan Update ITE Luncheon July 17, 2014 Jeff Lerud, Project Manager.

Slides:



Advertisements
Similar presentations
I-66 Corridor Improvements Outside the Beltway CTB Briefing
Advertisements

Measure M Sunset Action Plan. Overview  Promises Made, Promises Kept  Funding Picture  Use of Measure M (M1) Freeway Funds  Next Steps 2.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
Project Prioritization - 1 Project Prioritization Using Paramics Microsimulation: A Case Study for the Alameda County Central Freeway Project Presented.
Colorado Rail Passenger Association Spring Meeting June 1, 2013.
I-394 Express Lane Community Task Force March 18, 2004.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Environmental Assessment Public Meeting
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
Tropicana Avenue To Blue Diamond Road I-15 South Design-Build Project Paving the Way to a More Mobile Las Vegas Presented to Las Vegas Convention and Visitors.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
Davie Road/S.R. 84 Transit Facility Demand Estimation Presented by Jeff Weidner & Jeremy Mullings Florida Department of Transportation Yongqiang Wu & Kasey.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Public Involvement Meeting June 11,  Introduce the project  Provide history and current status of the project  Explain the benefits of the project.
Update on MOITS Strategic Plan Development Andrew J. Meese, AICP COG/TPB Staff MOITS Technical Subcommittee September 9, 2008 Item # 5.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
National Road Pricing Conference June 4, 2010 Mark Burris, Texas Transportation Institute Jessie Yung, Federal Highway Administration.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
Major Transportation Corridor Studies Using an EMME/2 Travel Demand Forecasting Model: The Trans-Lake Washington Study Carlos Espindola, Youssef Dehghani.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
Challenges in Using Paramics in a Secondary Plan Study – Case Study of Downsview, Toronto Paramics Users Group Meeting October 5, 2009.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
Anchorage Metropolitan Area Transportation Solutions Freight Advisory Committee (FAC) Freight and Land Use: Making the Connection December 15, 2010 Ms.
I-95 Managed Lanes CORSIM Analysis Status Meeting Presented by David Stroud, PE, AICP Reynolds, Smith and Hills, Inc.
Draft 2008 Congestion Management Process (CMP) Technical Report Andrew J. Meese COG/TPB Staff TPB Technical Committee June 6, 2008 Item # 8.
Modeling Various Tolling Schemes Using Emme: Seattle Experience Andrew Natzel, Parsons Brinckerhoff Bhanu Yerra, Parsons Brinckerhoff Craig Helmann, Puget.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Presentation to Traffic Working Group February 6, 2014.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Metro Highway Program Presentation to CMAA Abdollah Ansari
A Sketch Planning Assessment of Managed-Lane Options for the I-5 Freeway Corridor Master Plan William R. Loudon, DKS Associates.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
STEERING COMMITTEE JANUARY 24, INTRODUCTIONS 2 WHO IS ON THE PROJECT TEAM?  Dakota County Regional Railroad Authority  Ramsey County Regional.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
SYSTEM MANAGEMENT PERFORMANCE MEASURES, RANKING AND PRIORITIZATION CORRIDOR MANAGEMENT PLANS INCORPORATION INTO STIP & TIP STRATEGY IMPLEMENTATION MONITOR.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
BUS RAPID TRANSIT (BRT) PLANNING EFFORTS STATUS 1 Planning & Development Committee April 5, 2016.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Transportation Initiative Sales Tax Prioritization
Central Polk Parkway PD&E Study
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Project Management Team Meeting #3
TVTC Impact Fee Update Nexus Study January 30, 2008
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Project Overview Multimodal improvements to 22.5 miles of I-66
The Oakton Condominium Association September 12, 2017
Current and proposed HOT facilities update
2040 Regional Transportation Plan Sparks Citizens Advisory Board
Statewide Needs Assessment for Next-Generation Travel Demand Models
2020 RTP Update - Proposed Changes to Transit Projects
Presentation transcript:

Southern Nevada HOV Plan Update ITE Luncheon July 17, 2014 Jeff Lerud, Project Manager

Southern Nevada HOV Plan Update Background of 2007 HOV Plan Purpose Results and Recommendations Next Steps

HOV Plan Background 2030 Traffic Forecasts and RTP Enhance mobility Near and long term priorities

Current HOV System HOV lanes on US 95 MLK to Ann Rd. and Summerlin Pkwy to Rampart Blvd. – 2+, motorcycles, emergency vehicles (no trucks) – Peak hour – Continuous ingress/egress Express lanes on I-15 Silverado Ranch Rd. to Sahara Ave. – All vehicles including trucks – 24 hr. – Limited ingress/egress

I-15/US 95 HOV System Project NEON will connect US 95 to I-15 with a direct flyover ramp I-15 Express lanes will be converted to HOV lanes I-15 south of Sahara Ave. one HOV lane each direction (1 HOV, 4+ General Purpose) 22 miles of HOV system – Silverado Ranch on I-15 to Ann Rd on US 95 Most of the near term system from the 2007 HOV Plan

HOV Plan Update Validate the 2035 RTC regional traffic demand model includes mode-choice Phase 1 HOV system near term priorities Phase 1 HOV system near term priorities on I-15 Update overall HOV plan Workshops and Public Outreach

HOV Plan Update Validate the 2035 RTC regional traffic demand model includes mode-choice – Model Task Force (MTF) – 2025 forecasts – Project NEON – Deliverable: Technical memorandum 1

HOV Plan Update Phase 1 HOV system near term priorities (NEON) – Identify Phase 1 HOV needs for NEON – HOV Direct Connector from US95 to I15 – Express Lane conversion feasibility – Deliverable: Technical Memo for NEON limits; Express lanes Implementation Plan (if needed)

HOV Plan Update Phase 1 HOV system near term priorities (I-15) – Limits of Blue Diamond to Sahara – Re-evaluate direct access points – Preliminary design level line work – Preliminary cost estimates – Deliverable: Recommendation for number of HOV lanes; re-evaluation results of direct connector and new locations

HOV Plan Update Update overall HOV plan – Re-evaluation and validation of 2007 HOV Plan – Performance Measures for HOV implementation – Conceptual design for up to 3 direct access points – Deliverable: Final report detailing recommended HOV Plan for Southern Nevada

HOV Plan Update Workshops and Public Outreach – Today – Agency and stakeholder workshops – Share recommendations and receive input/feedback from stakeholders – Public Information Plan (if needed) on how to address Express Lane to HOV Lane conversion

Results and Recommendations 2025 Number of HOV Lane Requirements

Results and Recommendations 2035 Number of HOV Lane Requirements

Results and Recommendations

Operational Recommendations

Results and Recommendations Express Lane Conversion Need for connectivity between Express Lanes and HOV direct connector from US-95 Convert Express Lanes to HOV 2 Express Lanes became 1 HOV and 1 GP

Results and Recommendations HOV Direct Access Ramps (Between St. Rose/Sahara) Direct connects to arterial – 7 locations screened St Rose, Blue Diamond, Warm Springs, Sunset, Hacienda, Harmon, Meade – 4 locations proposed Blue Diamond, Hacienda, Harmon, Meade HOV to HOV flyover – Propose I-15/I-215 to/from east (Airport) – AND to/from the west

HOV Plan Next Steps Initial modeling and analysis nearly complete Agency, stakeholder, and public involvement ramping up Make recommendations on operations issues with the HOV system – Hours of operation – peak hour or 24 hr.(recommended) – Vehicle eligibility – allow high mileage vehicles (NRS ) – Ingress/egress – continuous or limited (recommended) Direct access connectors

HOV Direct Access Interchanges 2007 HOV Plan studied Harmon-Hacienda for access to the strip LV strip due to high volumes and employment center is critical to system Direct access from park and ride and transit centers Direct access to freeways in the long term plan (I- 215)

Thank you. Jeff Lerud, Project Manager