Vietnam research chia dragon rebuild chinatown initiative p o r t f o l i o plaza quixote olympic village planting design site grading site construction.

Slides:



Advertisements
Similar presentations
Employee Council Meeting January 2012 Office of the Architect.
Advertisements

400 North Orange Avenue Orlando, FL
The Liberty District Workshop Sacred Cowshands off! Significant historic structures Mildred Terry Library The Liberty Theater Places of Worship Ma Rainey.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
 Awarded Southern California Association of Governments (SCAG) Grant for integrated land use and transportation planning efforts ( )  Consultant.
Urban Wildlife Management PEWH Wildlife Habitat Evaluation Program.
ENCORE ACADEMY PATHWAYS TO SUCCESS DRAFT REFLECTIONS - A regular high school with an artsy name. - Unsure how to integrate arts and design.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
CHARLESTON GAILLARD CENTER ARTS PRECINCT ARTS PRECINCT … designed to bring the arts into the public realm by creating a civic destination for.
Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only.
An Urban Desert Park Tucson, Az Lee Eubank, Fall 2013 Broadway Euclid N.
 City of Mesa Council Presentation October 23, 2014.
1 RTD TOD Program University of Denver November 2004.
Presented By: By: By: Web Address: Topic Number: Topic Number: Date: Date:
ASU Downtown Phoenix Campus City Council February 6, 2007.
City & Sustainable Development Central District. Central District = CBD Land use characteristics of CBD Mainly commercial land use / absence of industrial.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Engineering and Technical Plans Description, process and standards Dh 2005.
Realizing a Fully Revitalized Downtown Mayor’s Quality of Life Forum August 18, 2007.
Part II: Case Studies 1.Arlington, VA: Transit-oriented Development Boosts Economy County-wide. 2.Portland, OR: Streetcar Increases Investment and Redevelopment.
Seattle Station Area Planning Milestones & Events Transit-Oriented Development Program Information & Schedule Station Area Atlas Station Area Recommendations.
The 21 st Century Vision Plan for Old Town Lawrence Group | Kubilins Transportation Group | Rose & Associates.
Land Use Study for the Community of Winchester May 21, 2012.
Linda K. McCarthy, Executive Director Missoula Downtown Association Missoula, Montana
CBJ Project Manager: Heather Marlow Consultant Team: Sheinberg Associates With team members: – Walker Macy – Northwind Architects – Kittelson & Associates.
ART IN THE LANDSCAPE Dr. Lou Mills LARC 1302 Spring 2014.
Long Beach West LA/ Santa Monica East Los Angeles Pasadena/ San Gabriel Valley “Make the Right Decisions to Connect the Southern California Light Rail.
RESHAPING THE LANDSCAPE SALLY BERNSTEIN JESSICA KLEISS ENVIRONMENTAL STUDIES 330 SPRING 2012 The following is a case study of the Lewis & Clark College.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Land Use Study for the Community of Winchester July 9, 2012.
W A R R E N C O U N T Y G E O G R A P H I C I N F O R M A T I O N S Y S T E M GIS in Local Government: Warren County’s Experience GIS Day November 17,
Where the Home Is Matters Planning for Healthy and Equitable Communities Julie West, MPH Jim Krieger, MD, MPH Public Health – Seattle & King County May.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
How Would a Transportation – Land Use Grant Program Work in the Washington Region? Presentation to the Transportation Planning Board Technical Committee.
09/03/2004 /Apinya/KMUTTarc354site planning process 1 Site Planning Process Environmental scale Basic procedure in designing site plan.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
City of Carrollton Transit Oriented Development January 5, 2008 Peter J. Braster TOD Manager.
How to Add Active Transportation into Your Daily Life Photos courtesy of Bike Walk Ambassador Program.
Integrating Uses.
 Urban design involves the arrangement and design of buildings, public spaces, transport systems, services, and amenities.  Urban design is the process.
Careers in the Landscape Industry What types of careers are available in the landscape industry?
Some work samples - Leslie Wagle Community Development Assistance - as planner in High Point. I provided site plans and façade sketches for this project.
Grand Canalscape Phase I and II General Update October 30, 2015.
Board of County Commissioners Second Public Hearing August 10, /10/
Dennis Schroeder ED 142 9/14/06 Construction Systems.
Tide Light Rail Line By: Alec Rilee, Kimberly Gayle,& Steven Taylor School: Petsworth Elementary.
Urban Wildlife Management Plan 4 Students learn how to evaluate, improve or create small areas of wildlife habitat for selected species which may live.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
EASTSIDE ACTIVITY CENTER MASTER PLAN PROPOSED COMPREHENSIVE PLAN AMENDMENT CPA Board of County Commissioners Hearing May 13, 2008.
City of Redmond: Northwest Redmond & U.S. Highway 97 Plan - October 11, 2006 What Makes a Great Neighborhood.
Kentwood Fire and Transportation. Windshield Survey  Avenue G and Third Street are the main roads going through the town. They are also the only roads.
C ENTRAL E STUARY P LAN A V ISION F OR O AKLAND’S W ATERFRONT Central Estuary Plan A VISION FOR OAKLAND’S WATERFRONT Specific Plan and Environmental Assessment.
DeSoto Hampton Corridor Revitalization Overview of Mixed Use Development.
Is Sprawl Still the Law? Linking Land Use Law and Transportation Planning for Building the Green Metropolis Judd Schechtman, JD, MUP Rutgers Bloustein.
南京河西新城區 CBD 一期景觀工程 PROPOSED DEVELOPMENT AT NANJING CBD PHASE ONE 16 SEPTEMBER 2003 初步景觀概念設計初步景觀概念設計 CONCEPTUAL LANDSCAPE CONCEPTUAL LANDSCAPE.
2035 General Plan Update Planning Commission Study Session on Draft Circulation Element February 2, 2016.
Finance Committee & City Council October 10, 2016
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
Campus Construction Projects
Emeryville Marketplace is a 14-acre mixed-use commercial and residential development located at the eastern terminus of the Bay Bridge in the small city.
What is Landscape Design? Landscape design is an independent profession and a design and art tradition, practiced by landscape designers, combining nature.
Place Type: Urban Center
PREPARED BY: Joshima V.M., University of Nizwa.
254 East Union Street Pre Development Plan Review
Presentation transcript:

vietnam research chia dragon rebuild chinatown initiative p o r t f o l i o plaza quixote olympic village planting design site grading site construction bailey plaza mary brooks garden

plaza quixote Plaza Quixote, West New York, New Jersey- Working with a team of real-estate students, I designed a $306 million dollar high density mixed-use transit oriented development centered around a lively plaza.This plaza would maximize property value and views for the development while also creating a civic and commercial core for the existing neighborhood. With this design, we worked out the phasing and total square footage of each use to calculate how much this development could make using ROI and ROE. Spring semester, 2004: Form Z, Adobe Premier, Adobe Photoshop, Adobe Illustrator

plaza quixote

new york olympic village Olympic Village, New York- For this project I designed an Olympic village for the NYC 2012 olympic bid using primarily digital media. The main element of the design is a central pedestrian street that will serve as a connection between the ferry terminal, rail station and subway stop. This street will provide a central gathering spot during the Olympics, as well as help integrate the village with the surrounding neighborhood after the Olympics are finished. Fall semester, 2003: Partner Bret LeBleu Form Z, Adobe Premier, Photoshop

new york olympic village

Bailey Plaza- Cornell University. I designed a plaza for this heavily trafficked site which currently is a parking lot. In my design, I strove to address circulation by analyzing time- lapse photography taken from a nearby building. These pedestrian and vehicular circulation lines became the basis for the ultimate form of my design. Spring 2003: ink on mylar bailey plaza

bailey plaza

mary brooks wind garden Kendal Retirement Home, Ithaca- I designed a wind garden for an open courtyard site at Kendal Retirement Home. The main elements of my garden are memorial wind sculptures surrounded by hardy ornamental grasses and low shrubs. These moving sculptures would both provide visual and kinetic interest throughout the seasons. While taking advantage of the difficult conditions of the site, these sculptures would also be fitting living memorials for a retirement home. Spring 2003: ink and marker on mylar.

mary brooks wind garden

rebuild chinatown Chinatown New York- I carried out this project while working for Asian Americans for Equality. I supervised a team who surveyed over 3,000 parcels in Chinatown NYC. Using ArcView GIS, I spatially mapped and analyzed the imported data. This data was used as part of the community report which can be viewed at Summer 2002, Arcview 3.2.

vietnam research Transportation and Streetlife Research, Hanoi Vietnam- In the summer of 2003, I traveled to Vietnam to do independent research on traffic in Hanoi for the group Asian Coalition for Housing Rights based out of Bangkok. During this summer I wrote two reports as well as conducted a 100 person survey on transportation perceptions. In the first report I analyze how foreign funded development projects have failed to addressed the unique nature of traffic in Hanoi. In the second report, I argued that Vietnamese cities unlike other developing cities has been able to balance a vibrant multi-faceted streetlife with motorization because traffic in Vietnamese cities is primarily on two-wheels I also took many still photographs to prove how these balance between streetlife and motorization is maintained

chia dragon Chia Dragon- Cornell University Using two abandoned shopping carts, rubber bicycle tubes, bolt cutters, burlap, grass seed, and hyrda-gel, two other landscape architects and I breathed life into a Chia dragon complete with movable wings and mouth in the annual Cornell dragon day parade.

planting design Cornell Campus- This is the final project of my horticulture class: For this yearlong class we learned over 300 woody plants as well as learning the importance of conducting in-depth site and soil analysis. This project was on Cornell campus, and our class implemented the design from site condition assessment to installation. My design specifically focused on winter- interest plants that would thrive in the hot and dry conditions and dense, basic soil of the site. Fall Autocad

site grading Martha Van Renesselaer Hall- Cornell University- This project was the culmination of a two semester site-engineering course taught by the “king of grading” Marv Adelman. In this course, I learned the basics of grading such as grading swales, calculating runoff, and determining horizontal and vertical road alignment. For this project I graded a walkway and the nearby landscape around a building on a very steep slope on campus. spring 2002: ink on vellum

site construction Performing Arts Plaza, Ithaca- This plaza design was the final project for my site construction class. The plaza chosen was designed by the post-modernist architect Stirling and did not function at all. I did all the construction drawings for the my design including the details, the plant design, lighting design, and grading. I chose to design an aluminum arbor as well as a fountain with polyurethane tubes that would bring life into the plaza. Spring 2003, Autocad.

site construction