CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
L. Tavian, TE/CRG, Page 2 12 th September 2013 Accelerator Consolidation Workshop L. Tavian, TE-CRG.
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
EN-CV during LS1: Upgrade, Consolidation, Maintenance, Operation M Nonis EN/CV Chamonix 2012 – LHC performance Workshop On behalf of EN/CV Group.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Cooling and Ventilation Activities M. Battistin – EN/CV/PJ IEFC Workshop th March 2012 « CONSOLIDATION and UPGRADE PLANS for the INJECTOR COMPLEX.
Associated detection/extinction systems D. Swoboda.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
EN-CV interventions during YETS
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
First results from the study of the LHC cycle power consumption FCC I&O meeting 24 th June 2015 Davide Bozzini With the contribution of G. Burdet, B. Mouche,
LS1 Day EN-CV M. Nonis on behalf of CV group / CERN
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
LS2 Cooling & Ventilation Activities M. Battistin EN/CV Acknowledgements: P. Barriere, R. Bozzi, A. Broche, O. Crespo,
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
INFRASTRUCTURE CHANGES AND UPGRADES Presented by: Fernando Baltasar dos Santos Pedrosa in the name of the four LHC experiments.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
TE-CRG Activities D. Delikaris, TE-CRG.
Cryogenics Fault Tree A. Niemi & E. Rogova. Contents 1.Introduction of the current tree structure 2.Failure rates observed in 2015 failure data 3.Unsure.
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Update on the PSB Cooling and Ventilation Systems
EN-CV activities for LHC during LS2
YETS & LS2 Works EN-EL / Power distribution
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
YETS & LS2 Works EN-El on LHC / Power distribution
the high-voltage network of CERN ToMORROW
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Accelerator and Experiment Interface Session: LS2, LS3
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
Renovation of the 45-year old PS magnets
CV maintenance works during YETS
Cooling systems for HL-LHC (WP17.3)
EN-CV interventions during EYETS for PS and PSB
YETS & LS2 Works EN-EL / Power distribution
COOLING & VENTILATION INFRASTRUCTURE
EN-CV: P8 systems and Detector Cooling
Maintenance at ALBA facility: Strategy for the conventional services
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011

Contents –Maintenance –Upgrade projects UW pumping upgrade Back up for the primary cooling for cryo Back up for the primary cooling for Atlas CCC Other projects –Consolidation –2012 → 2013 –Conclusion 2Chamonix 2011 – session 3 shutdown 2012 (part II)S. Deleval

Maintenance status 3Chamonix 2011 – session 3 shutdown 2012 (part II)S. Deleval EquipmentMaintenance done Cooling Cleaning of the cooling towers Mecanical maintenance of the pumps Ventilation underground units Filters and belts replacement Ventilation on the surface, sump and compressed air Complete maintenance For the long shutdown: → Need for real stop of the cooling 4 weeks/point → Need longer acces for the ventilation in the underground: 2 weeks/point Maintenance not done1/1/2012: missing since Safety tests Instrumentation Electrical maintenance Test alarm transmission... 3 years Instrumentation Mecanical maintenance Electrical maintenance Test alarm transmission... 2 years -1 year

Projects Chamonix 2011 – session 3 shutdown 2012 (part II)S. Deleval Type of projectExampleNumber UpgradeUW, CCR, Chilled water point 218 New installationsLinac 4, critical power 513, CMS clean room, Isolde, bldg Original CV consolidation plan PM32, PS and Booster ventilation36 Consolidation injectors 25 years Cooling of the PS magnet and Central bldg 12 Total87 Foreseen projects : 37 One project might concern several plants (i.e. cooling tower back up)

SectorPresent overflow Sector % Sector % Sector % Sector 4-59 % Sector % Sector 6-70 % Sector % Sector % UW upgrade : stand by pumps –Aim of the project: Increase the reliability, decrease the downtime in case of failure, and integrate the new need. –Project consist of : Installing the redundant pump for each sector + TI2 and TI8. Changing the pumps for two sectors. –Duration of the work: 8 months Stop of the circuits for 6 weeks (sensible point in the alcoves) – Cost estimate : 850 kCHF 5Chamonix 2011 – session 3 shutdown 2012 (part II)S. Deleval

Back up for the primary cooling for cryo 6Chamonix 2011 – session 3 shutdown 2012 (part II)S. Deleval –Aim of the project: Ensure the cooling during the maintenance of the cooling tower for point 4, 6 and 8. –Project consist of : Installing a back up cooling plant for 6MW, only for the cryo. Connect it to the existing distribution circuit. –Duration of the work : 3 months/point Stop of the cryo circuit for 2 weeks. – Cost estimate : 3.6 MCHF

Back up for the primary cooling for ATLAS 7Chamonix 2011 – session 3 shutdown 2012 (part II)S. Deleval –Aim of the project: Ensure the cooling during the maintenance of the cooling tower for ATLAS (coordination with SPS schedule) –Project consist of : Connecting the ATLAS primary circuit to the SPS ring. Pipework and civil engineering –Duration of the work : 4 months Stop of the ATLAS circuit for 4 weeks – Cost estimate : 500 kCHF

CCC upgrade 8Chamonix 2011 – session 3 shutdown 2012 (part II)S. Deleval –Aim of the project: Remove the dependency from the BA3 chilled water (Test AUG) Increase the cooling capacity Get a redundant system Resist to the power cut –Project consist of : Adding two dedicated chillers for the CCR, Modifying the electrical supply with new UPS and diesel generator, Installing new air handling units, Installing a cooling system directly on the racks –Duration of the work: 6 months. 1 month stop of cooling (incl. BA3). – Cost estimate : 2 MCHF

Other projects –Upgrade of the primary water in point 4 Add a stand by pump and reduce the risk of affecting LHC in case of failure. Reduce the energy consumption of the plant (EDF). –Upgrade of the chilled water production of point 2 Install new chillers to get a redundant system. –Overpressure in Point 8 tunnel vs LHCb cavern Install a ventilated sas in the RB84 and RB86 to achieve correct dynamic confinement between tunnel and cavern –Monitoring of the air in the LHC tunnel Install new sensors for air speed, temperature, and delta P 9Chamonix 2011 – session 3 shutdown 2012 (part II)S. Deleval

Consolidation –PM32 : Evacutation of the underground water Replace the electrical and control cubicles (no spare parts) New type of pump and civil engineering work to integrate the new acces constraint → avoid the manual operation of sand removing. 3 months of work. Keeping the existing system running in degraded mode. –SR building ventilation refurbishment Replace the electrical and control cubicles (no spare parts) Motors, ventilators, sensors and actuators change 1 year of work. Condition inside the building could be affected. 10Chamonix 2011 – session 3 shutdown 2012 (part II)S. Deleval

If the long shutdown : 2013 –Maintenance and reliability: 4 years without any safety test and very light maintenance could lead to longer and frequent stops. Run for one more year with the actual weakness: UW sector, SR ventilation, no redundant chiller in point 2, no redundant primary pump in point 4,... –Projects : Not affected Important project like Linac 4, 513, Hiradmat will be completed by Chamonix 2011 – session 3 shutdown 2012 (part II)S. Deleval

Conclusion 12Chamonix 2011 – session 3 shutdown 2012 (part II)S. Deleval –Maintenance Will be a strategic activity to recover correct technical condition of the equipment for the successive run. A stop of the installations will be mandatory. –Project Very important workload Impact on the availability of the plant – coordination with other activities ? No major issue