M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.

Slides:



Advertisements
Similar presentations
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Advertisements

1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master The Dome Project Bill Gressler Telescope.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
RF Cavity / Coupling Coil Module
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
Monday Morning J. Sebag T&S Systems Engineer. Close Past… 2 M1M3 acceptance and transportation to storage Reviews and RFPs (Dome, Software, Coating Plant,
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
Sandrine Thomas (T&S Project Scientist) & Telescope and Site Team.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
Telescope Integration and Tests Tuesday Afternoon.
M1M3 Status & Near Future Milestones C.Araujo/ J. Sebag 1.
Design Progress Allen Ellis 18-September
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
K-D-PR Fabrication and testing of KGMT FSM prototype Oct Ho-Soon Yang, Hak-Yong Kihm, Il-Kwon Moon, Jae-Bong Song, Yun-Woo Lee Korea.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
Project schedule and status R. Guida, F. Ravotti, D. Pfeiffer November 14th, 2012 GIF++ users meeting.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Telescope Mount Assembly (TMA) Status and Schedule Design Contractor: Empresarios Agrupados (Madrid Spain) Fabricator: Asturfeito (Asturias, Spain) LSST.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
OUTAGE MANAGEMENT. OUTAGE APPROACH/PHILOSOPHY A) Time based / machine operating hours based concept related to OEM recommendations - More expensive than.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Blanco F/8 Status AURA Observatory Council, Tucson, 3/2013.
BSS Prep work at CERN and Acceptance of Parts
LARP Phase II Secondary Collimator RC1
MLC Schedule Plan Proven in-house expertise and infrastructure for fabrication, assembly, and testing cryomodules Confident in our technical expertise.
Spectrometer Solenoid Fabrication Status and Schedule
Support Structure Fabrication
Camera to Top End Assembly Integration Travis Lange Camera I&T M. E
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
Magnet, Support and Infrastructure
LCLS Vacuum System Plans (July 07)
SNS PPU Cryomodule Space Frame
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1

M2 Status Oct 2014: M2 substrate received by Exelis (Harris) 2 Now in Harris waiting for optical processing 

Upcoming Reviews 3 May Optical Fab. STE design Cell Assy Fab. Readiness / Cell weldment design July Optical Fabrication & Test Readiness - Part1 Shipping container modifications/packaging Support Pad Design & Testing Cell Assembly Handling Equipment (M2 cart and cover) September Cell Assy final Design Mirror control system Finished M2/cell Assy integration & test readiness November Optical Fab & test readiness - polish

M2 Schedule Summary 4 Needed at site by Mar 2018 (60 days float)

M2 Status 5

6

Optical Fab STE 7 7 Fab equipment Full tool rotation device Large bridge profilometer Small bridge profilometer Swing Arm Profilometry Full tool polisher

Handling Equipment 8 Vacuum-lifter Steel support weldment Support Ring Full tool rotation device

M2 processing to begin soon 9

M2 Grind and Polish 10

Processing up to ion figuring 11

M2 Test Set PDR 12 Reduces stitching errors due to high frequency discontinuities between CGHs. Single CGH 28”x28” (MHAT) Collimator 40” CA larger test aperture allows the entire CA of M2 to be measured as a single zone shorter collimator height will enable the M2 to be tested with a lower ceiling height 3m New Design Mount M2 in stationary frame Rotate interferometric test set components

M2 Test Set 13 Test set modeling CodeV and Zemax Test Set Hardware

M2 Cell Design Analysis FEA performance to support cell weldment long lead procurement Mirror correctability confirmed 14

M2 Surrogate Designed 15

M2 Cover & Cart previewed 16

Pad designs reviewed 17

Container mods reviewed 18

M2 Issues LSST producing ILCs to enable testing of M2 actuators M2 lifting fixture vs spreader bar Final details of witness samples for pull tests Action items from M2 cart design review Shipping container mods 19

Near term Prepare for M2 FDR in Sept Includes M2 Controller Design Optical Fab & Test RR – mid Oct/Nov Working to update PMCS 20