NuPECC Meeting – Athens / Greece March 17 & 18, 2006 GSI Darmstadt --- Helmholtz-Zentrum für Ionenforschung The FAIR Project -- Recent Developments and.

Slides:



Advertisements
Similar presentations
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Advertisements

Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
September 19, 2006I. Augustin, GSI at PHIBADE 2006 Status of the FAIR Project I. Augustin FAIR Coordination Group GSI.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt EU FP7 FAIR pp - 1st Reporting meeting March 6, 2009 J. Eschke, GSI EU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Peter Spiller, IHEP, Protvino GSI, Peter Spiller IHEP FAIR in kind Contributions.
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
HISPEC/DESPEC meeting GSI, 21/02/ Introduction: what happened recently (B.Rubio) 2. Beam quality: energy buncher (C.Brandau) 3. Layout.
FAIR March 20, 2007 D. Krämer GSI/FAIR Division Technical Status: status of layout status of civil engineering items under current discussions status of.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR – Facility for Antiproton and Ion Research
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
D. Krämer - Tech. Discussions GB, Oct. 11 th, 2006 Workpackages and In-Kind Contributions to FAIR The FAIR Project Preparatory Phase - R&D for FAIR Workpackages.
European Strategy Forum on Research Infrastructures Dr.- Ing. Beatrix VIERKORN-RUDOLPH ESFRI Chair NuPECC Long Range Plan 2010, 9 th December 2010.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study Annual Report meeting December 7, 2006 J. Eschke,
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The FAIR Project Walter F.J. Müller, GSI, Darmstadt CBM Technical Coordinator FAIR Joint Core Team 2 nd CBM India Meeting, VECC, Kolkata, July 2007.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
International FAIR Boris Sharkov FAIR / MEPhI Scientific Managing Director, Lomonosov MSU 2015 Sweden FranceIndia Finland GermanyPoland UK Romania Russia.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 3rd Annual Report meeting January 29, 2008 J. Eschke,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
CERN as a World Laboratory: From a European Organization to a global facility CERN openlab Board of Sponsors July 2, 2010 Rüdiger Voss CERN Physics Department.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
Facility for Antiproton and Ion Research – Research Program and a Status Report Walter F. Henning – GSI Darmstadt & University of Frankfurt Hadronic Physics,
GOVERNMENT OF ROMANIA Structural Instruments Sectoral Operational Programme „Increase of Economic Competitiveness” “Investments for Your Future”
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR CNI 2nd Annual Report meeting October 11, 2007 J. Eschke, GSI DIRAC-Phase-1.
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
O. Kester, NuSTAR annual meeting, 27/02/2013
Delivery of FAIR In-kind items (feedback from India) Subhasis Chattopadhyay VECC-Kolkata & BI-Kolkata.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
Itzhak Tserruya Weizmann Institute of Science
Status of the FAIR Project
ESS Innovation Procurement Workshop
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
(Procurement, testing of magnets)
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
FAIR – the Universe in the labororatory
Presentation transcript:

NuPECC Meeting – Athens / Greece March 17 & 18, 2006 GSI Darmstadt --- Helmholtz-Zentrum für Ionenforschung The FAIR Project -- Recent Developments and Milestones Walter F. Henning

FAIR -- Recent Developments Formal approval by the Cabinet of the German Government on the federal financial contribution to FAIR (65%; for the full construction period ) (contribution by the State of Hessen (10%) already formally approved in 2004) Formal approval by the Magistrate of the City of Darmstadt of the FAIR Construction Plan ('Bebauungsplan') Baseline Technical Report completed and reviewed; to be submitted to the International Steering Committee for FAIR (FAIR-ISC) on April 11, Legal documents for contracts developed; 2-company structure for FAIR

FAIR -- Recent Developments Formal approval by the Cabinet of the German Government on the federal financial contribution to FAIR (65%; for the full construction period ) (contribution by the State of Hessen (10%) already formally approved in 2004) Formal approval by the Magistrate of the City of Darmstadt of the FAIR Construction Plan ('Bebauungsplan') Baseline Technical Report completed and reviewed; to be submitted to the International Steering Committee for FAIR (FAIR-ISC) on April 11, Legal documents for contracts developed; 2-company structure for FAIR

FAIR -- Recent Developments Formal approval by the Cabinet of the German Government on the federal financial contribution to FAIR (65%; for the full construction period ) (contribution by the State of Hessen (10%) already formally approved in 2004) Formal approval by the Magistrate of the City of Darmstadt of the FAIR Construction Plan ('Bebauungsplan') Baseline Technical Report completed and reviewed; to be submitted to the International Steering Committee for FAIR (FAIR-ISC) on April 11, Legal documents for contracts developed; 2-company structure for FAIR

Civil-Construction Development Plan

Civil Construction Development Plan -- Procedures and Processes The plan had to go through: -2 public hearings -involvement and participation of all public, semi-public and private bodies representing public interests or officially recognised interests (together more than 100 so-called "TÖB") - preparation of 15 studies and expert statements (including reforestation, environmental impact studies, 'eco-points', radiation safety permit etc.) -several readings, discussions in local community councils and approval by the Darmstadt City Council -approval from The Regional Assembly (assembly of regional mayors, approval of the change of the Regional Development Plan) -compensatory reforestation measures (Hessen-Forst), wildlife support, purchase & exchange of farmland (private owners)

FAIR LAYOUT as of

FAIR -- Recent Developments Formal approval by the Cabinet of the German Government on the federal financial contribution to FAIR (65%; for the full construction period ) (contribution by the State of Hessen (10%) already formally approved in 2004) Formal approval by the Magistrate of the City of Darmstadt of the FAIR Construction Plan ('Bebauungsplan') Baseline Technical Report completed and reviewed; to be submitted to the International Steering Committee for FAIR (FAIR-ISC) on April 11, Legal documents for contracts developed; 2-company structure for FAIR

FAIR - Facility for Antiproton and Ion Research 100 m UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR GSI today Future facility ESR FLAIR Rare-Isotope Production Target Antiproton Production Target

Fields of Research at FAIR 100 m UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR GSI today Future facility ESR FLAIR Hadron Physics & QCD with stored and cooled antiproton beams (0 to 15 GeV/c) Nuclear Structure & Astrophysics with beams of short-lived nuclei (0-1.5 GeV/u) Physics of Dense Plasmas with compressed ion beams & high- intensity petawatt-laser Nuclear Matter QCD-Physics with HI beams (2 to 45 GeV/u) Solid-state and biological applications with ion (& antiproton?) beams Fundamental Symmetries Ultra-high electro-magnetic fields & Quantenelectrodynamics with highly stripped ions and antimatter Accelerator Physics 667 users 909 users 578 users

FAIR Baseline Technical Report 2006

PAC QCD E. Chiavassa PAC NUSTAR R. Casten PAC APPA D. Schwalm TAC Y. Cho Observers: FAIR Project CORE Cost Review Groups D. Plane, W. Bartel FCI Full Cost Issues B. Brandt AFI Working Group Administrative + Funding Issues Ö. Skeppstedt LFI Legal Framework Issues U.B. Jahn STI Working Group Scientific + Technical Issues H. Wenninger ISC International Steering Committee H. Schunck International Committee Structure for FAIR MiniTACs Cryogenics Warm and Cold magnets Power Supplies Beam Instrumentation p-Linac

STI: Working Group on Scientific and Technical Issues Chair: Horst Wenninger Sydney Gales until March 2005 Members Alex Müller, France Wolfram Korten, France Boris Sharkov, Russia John Simpson, UK Günther Rosner, UK ZHAN Wenlong, China Berta Rubio, Spain Jose Benlliure, Spain Dan-Olof Riska, Finland Juha Äystö, Finland Pasquale Fabbricatore, Italy Piero Dalpiaz, Italy Ulrich Wiedner, Sweden Håkan Danared, Sweden Walter Henning, Germany Hans Ströher, Germany Hans Gutbrod, FAIR Project Observers Peter Schroth, Germany Eberhard Widmann, Austria Nicolae Zamfir, Romania Ingo Augustin, Scientific Secretary

Programme Advisory Committees (PAC) QCD Emilio Chiavassa (Chair) Stanley Brodsky Piero Dalpiaz Donald Geesaman Hans Ake Gustafsson Serge Kox Rolf Landua Alain Magnon Rudolf Maier Bernd Müller John Nelson Eulogio Oset Dan-Olof Riska Hans-Georg Ritter Hans Ströher Itzhak Tserruya NUSTAR Rick Casten (Chair) Faical Azaiez Sherril Bradley Peter Butler Hubert Grawe Robert Janssens Shigeru Kubono Kurt Kilian Hans-Otto Meyer Alfredo Poves Berta Rubio Alan Shotter Antonio Villari Helmut Weick Michael Wiescher APPA Dirk Schwalm (Chair) Stefano Atzeni Michael Basko Gordon Drake Paul Indelicato Gilles Maynard Thomas Mehlhorn Peter Norreys Roland Sauerbrey Boris Sharkov Peter Spiller Markus Steck Dominique Vernhet Toshi Yamazaki

Technical Advisory Committee (TAC) Chair: Yanglai Cho Roland Garoby Sergey Ivanov Marcel Jacquemet Tomas Junquera Alex Müller Jerry Nolen Satoshi Ozaki Pasquale Fabbricatore Ferdinand Willeke Yoshishige Yamazaki Mini-TAC (topical sub-committees) p-linac –Raymond Fuja (Chair) –Helmut Haseroth –Roy Cutler Power supplies –Roy Cutler (Chair) –Raymond Fuja –Frederic Bordry –Gunnar Fernqvist –Hans-Jörg Eckoldt –Jens-Peter Jensen Beam diagnostics Cold magnets –Luca Bottura (Chair) –Pierluigi Bruzzone –Steve Gourlay –Jim Kerby –Marcel Jacquemet –Pasquale Fabbricattore –Tom Taylor –Walter Scandale –Erich Willen –Rob Wolf Cryogenics –Bernd Petersen (Chair) –Wolfgang Erdt –Ralf Trant –Siegfried Wolff –George Mulholland –Claus Rode –Hans Quack Warm magnets –Joseph Tuozolo (Chair) –Masayuki Muto

Cost Review Committees CORE-A for Accelerators –David Plane (Chair) –Klaus Blasche –Reinhard Bacher –Manfred Buhler-Broglin –Wolfgang Erdt –Gunnar Fernqvist –Helmut Haseroth –Ian Gardner –Dieter Kraemer –Lluís Miralles –Graham Stevenson –Pierre Strubin –Tom Taylor –Eberhard Weisse CORE-E for Experiments –Wulfrin Bartel (Chair) –Hans-Juergen Hilke –Ian Lazarus –Pierre Lazeyras –Hans Georg Ritter –John Simpson –Andrea Vacchi

PAC QCD E. Chiavassa PAC NUSTAR R. Casten PAC APPA D. Schwalm TAC Y. Cho Observers: FAIR Project CORE Cost Review Groups D. Plane, W. Bartel FCI Full Cost Issues B. Brandt AFI Working Group Administrative + Funding Issues Ö. Skeppstedt LFI Legal Framework Issues U.B. Jahn STI Working Group Scientific + Technical Issues H. Wenninger ISC International Steering Committee H. Schunck Scientific, Technical and Legal Framework for FAIR MiniTACs Cryogenics Warm and Cold magnets Power Supplies Beam Instrumentation p-Linac Baseline Technical Report - accelerator TR's - experiment proposals - civil construction plans (~ 3500 pages) PAC & TAC Review Reports Cost Book Cost Review Reports - accelerator & civil construction (CORE-A) - experiments (CORE-E) Convention Articles of Association By-Laws Final Act Document Legal Framework Report (LFI) Full Cost Structure Report (FCI)

Contract(s) Development Contract(s) Negotiations Closing ISC-FAIR International Working Group Activities Signing of MoU Phase I – Governed by MoU Phase II Governed by Contracts MoU PAC's Technical Committees: PAC's & TAC Proposals / TR's LoI's (2100 authors) Baseline Technical Report (BTR) and Project Definition (April 06) PAC and TAC Evaluations Cost Reviews TDR's 2006 Administrative and Financial Issues Working Group Scientific and Technical Issues Working Group

FAIR -- Recent Developments Formal approval by the Cabinet of the German Government on the federal financial contribution to FAIR (65%; for the full construction period ) (contribution by the State of Hessen (10%) already formally approved in 2004) Formal approval by the Magistrate of the City of Darmstadt of the FAIR Construction Plan ('Bebauungsplan') Baseline Technical Report completed and reviewed; to be submitted to the International Steering Committee for FAIR (FAIR-ISC) on April 11, Legal documents for contracts developed; 2-company structure for FAIR

Site Lab.-Services Landlord Activ. POF-Research Res.-Infrastr. Scientific- Technical Infrastructure Administrative Infrastructure FAIR (Facility) Construction / Operation GSI  FAIR GmbH Management

Reasons for 2 Legal Structures (GmbH's): Same structure (  contractual arrangements) for both FAIR and XFEL Separation of GSI activities which are not part of the FAIR program Construction, regulatory & radiation safety permits and environmental impact statements under GSI authorship Relation with Helmholtz-Association (HGF) and program oriented funding (POF) clearly defined All partners in FAIR GmbH on equal basis (Germany 'same' as others)

Site Lab.-Services Landlord Activ. POF-Research Res.-Infrastr. Scientific- Technical Infrastructure Administrative Infrastructure FAIR (Facility) Construction / Operation GSI  FAIR GmbH Management

Site Lab.-Services Landlord Activ. POF-Research Res.-Infrastr. Scientific- Technical Infrastructure FAIR (Facility) Construction / Operation FAIR-GmbH Management (Long-term) Contractual Arrangements "Geschäftsbesorgungsvertrag" Strategic Planning Budget & Financing Controlling Scientific Program & Schedule International Employment FAIR Line Management Administrative Infrastructure GSI Line Management Laboratory Facility & Site Operations Engineering Design Site Preparation and ES&H Technical & Civil Construction Production Supervision Assembly & Commissioning GSI-mbH Management

Schedule, Milestones and Critical Path Issues BUNG report on Planning of FAIR civil engineering, February 24 th, 2006, Consolidation of Planning of FAIR construction for April 10 th ISC meeting Mini-Tac or TAC on Civil Engineering ca. April/May 2006 STI presents the FAIR Baseline Technical Report to FAIR ISC April 10 th, 2006 ISC acts upon and makes decision as to the scope of the project..how quickly? Member states express (in writing?) their intention for specific in-kind contributions process is going on, see below AFI Final Results by late spring - early summer 2006 and presentation to FAIR ISC Finalization of FAIR geometry by August 2006 for starting planning for civil construction readiness for Fall of 2007 FAIR Contract closure should start in 2006 Decisions on NESR, RESR magnet technology (warm or cold) in summer of 2006  Spain If decision for NESR and RESR superconducting, prototype for end of 2008  Spain CR and Super FRS sc-dipole prototypes in 2008  China SIS 300 decision for or against curved magnets probably end of 2006  Italy, Russia SIS 300 sc magnets prototype a) straight magnets 2008, b) curved magnets 2008/9  Italy, Russia SIS 300 sc quadrupoles prototype 2008/9  France, CEA and IN2P3 SIS 100 sc magnet prototype 2008  Russia, Industry, GSI HESR curved sc magnets, feasibility study mid 2006, prototype in 2008  Industry, Jülich Design Super FRS Triplets 2007  Industry, GSI Prototype Super FRS Triplet 2008  Industry, GSI SUPER FRS Energy Buncher dipoles, delivery end of 2009  India

NuPECC Meeting – Athens / Greece March 17 & 18, 2006 GSI Darmstadt --- Helmholtz-Zentrum für Ionenforschung Thank you !!!