Safety and Legal Issues Section 8. Safety On The Job Site +Crawl Spaces +Demolition work +Drilling wood / concrete +Adhesive anchor use +Hard hats +Gloves.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Advertisements

Contracts for Builders Ross Kinzler, Executive Director.
Managing Construction Risks
1. Among the most important advisors to a construction firm are: –Professional surety bond producer –Knowledgeable construction/surety attorney –Construction-oriented.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
LexisNexis Pacific 1 Marcus Beveridge / Tina Hwang (Principal/ Solicitor) Queen City Law Better Building Blueprint : Build it right first time.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Builder’s Risk - Claim Adjustment Challenges
Proudly supported by: Procurement Challenges “Perspectives on Insurance” Simon Gray State Manager NSW/ACT Planned Cover.
Value Engineering: A Legal Perspective David M. Governo Governo Law Firm LLC 260 Franklin St. Boston, MA
MANAGING PRODUCTION SYSTEMS. Managing Production Systems –A project should be worked  Within schedule  Within budget  And safely –Management has to.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
Conditions of the Contract for Construction
Subcontracting. Subcontractors % of work is subbed –Significant impact on costs and schedule –Want to develop a working relationship with good.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
INT401 SURETY BONDS SOUTH OF THE BORDER. Presented by: Chad Rosenberg Principal Rosenberg & Parker Carlos Pliego Partner & Surety Vice President Intertec.
Minimizing Financial Losses Using Builder’s Risk Insurance Dayna Anderson, CFE Seth Lamden, Esq.
After the Storm Home Repairs and Replacement. What Happens After a Storm Victims of a storm suffer some type of loss and different levels.
Condominium and New Home Warranties and Rights of Action June 27, 2012 Raymond Daniel Burke Ober|Kaler 100 Light Street | Baltimore, Maryland.
April 11, 2007 Strengthening Communities Conference Managing Your Risks Ron Dennill Northern Communities Insurance Program.
Construction Defect Mitigation Construction Cost Recovery Construction Litigation Consultants, LLC Jerry Peck Slide 1 of 12 slides / Total.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Section C Nonstructural Protective Measures
1 18 International Payments and Related Issues. Summary: 18.1 Payment Currency Clauses Mobilization and Progress Payments Insurance Issues.
OCCUPATIONAL HEALTH AND SAFETY (2). The duties extend to; a) Their own employees b) Their independent contractors and their workers who may be working.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Chapter 2 Introduction to Construction Procedures
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems General Conditions of Contract and Special Conditions of Contract.
Construction Defect Litigation CAS Ratemaking Seminar 2005 Peter S. Mack, Markel Corporation.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Generic Documents for the Design, Build, Operate Contract for a Solid Waste Facility.
Legal & Technical Issues How mold affects: –Real Estate –Building Operations –Contractors Basics Additional considerations.
Professional Roofing Contractors “Using PowerPoint On Your Laptop Computer”
Housing Legal and Financial Decisions.. Lease Lease – Legal document between the owner of the property and the person wishing to occupy the property.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
 The forecasting and evaluation of financial risks  Identification of procedures to avoid or minimize their impact. Goals: ▪ Avoid or minimize losses.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Sprinkler Loads on Trusses
Seismic Retrofit Training. FocusFocus +How retrofit methods work +How to install them +Avoiding typical errors +Learn to implement a retrofit— NOT to.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
HIRING A CONTRACTOR. TIP OFFS TO POSSIBLE RIP-OFFS.
Sprinkler Loads on Trusses Educational Presentation.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
The Contract Management Process Contract Formation.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
PAUL GRIMSHAW. FIRE ISSUES IN LITIGATION Leaky Building Litigation – Traditional Defendants Council Builders Developers Architects Cladding manufacturers.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Contract Review: Practices and Pitfalls Cynthia A. Haines, Esquire Post & Schell, PC LeadingAge PA Annual Conference June 16, 2016.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Reducing the Risk of Litigation. Coach Warn athletes of potential dangers involved in sport Supervise regularly and attentively Prepare and condition.
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
CONSTRUCTION ADMINISTRATION Quality Control, Responsibility & Liability TQC Presentation 01/17/08.
MACDC Intercounty Drain Procedures Training
PROJECT MANAGEMENT 2 Chu Eu Ho
Costs and Economics of Construction
Wood Structures Topic 8 Quality Workmanship
4th Annual Construction Law Summit
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Housing Rehabilitation (Remodeling)
Construction Contracts
Presentation transcript:

Safety and Legal Issues Section 8

Safety On The Job Site +Crawl Spaces +Demolition work +Drilling wood / concrete +Adhesive anchor use +Hard hats +Gloves

Use a respirator if needed— not a dust mask

Do Not Disturb Asbestos Heating duct with asbestos insulation

Legal Perspectives -Earthquake Basics-

Contractor Legally Responsible +Damages resulting from negligence +Basic contractor standard of care >applicable law >code provisions >regulations, industry standard of care >contract, plans, specifications

Duty to Understand Earthquake Forces +Base shear +Earthquake overturning forces +Lack of stability imposed +Torsional rotation

Contractor must understand methods to minimize earthquake failure +Shear walls +Brace frame methods +Rigid frame methods

Prescriptive vs. Engineered +Check with local building dept. for prescriptive standards +When in doubt, consult design professional

Goal of Retrofit +NOT an “earthquake proof home” +IS for improved safety and performance of home during earthquake

Pre-construction Meeting +Useful tool +May be required +Purpose >review plans >ensure consistency of code interpretations >ensure adequacy and sufficiency of plan details

Statute of Limitations +3-yr: construction defects following time that owner knew that property was damaged +2-yr: errors in design +4-yr: breach of construction contract +10-yr: “latent”, undiscoverable defects

Legal Perspectives -Shear Walls-

Contractor Legally Responsible +Keep up-to-date on engineering knowledge and construction practice +Evolving standards of practice +Building code often follows standard of practice

Use Prescribed Dimensions +Do not deviate without approval ?Don’t change length or location ?Don’t change nail size or spacing +If can’t be installed as specified, call design professional +Document all changes and communications

Coordination +Contractor is responsible for coordination of trades +Do not allow un-permitted plumbing or electric through shear walls

Use Specified Materials +Sheathing Material +Fasteners +Nails

Quality Supervision +Piecework compensation can result in poor quality work +Quality supervision is important for contractor liability +Nailing patterns is big source of liability for contractors

Legal Perspectives -Connections-

Contractor Legally Responsible +No substitutions of lag screws for through bolts +Beware of non-standard framing +Use proper anchor bolt assembly +Protect workers from fumes

Legal Perspectives -Foundations-

Effective Communication When Observe Conditions Not in Scope of Work +Water or plumbing leaks +Drainage problems +Termites or wood rot +Split bottom framing members

Pre-Job Walk Through +Before bid on job +If fail to communicate observed conditions, contractors risk liability +Exclude conditions from contract or include as change order

Legal Standards & Manufacturers’ Specs Standards of care can include manufacturers’ instructions

Important +Continuity of Foundation +Shoring +Concrete Quality

Legal Perspectives Non-Structural Elements

Contractor Should NOT take Responsibility for Recommending +Carport cover bracing +Water heater bracing +Tank bracing + Veneer selection + Chimney bracing + Other bracing

Legal Issues A Contractor’s Legal Relationship with the Customer

Basic Legal Concepts +Communications +Owner’s concerns +Contractor’s liability +Contract, plan, permits +Tracking work

Communications +Communicate and Coordinate: >Customer >Subcontractors & workers >Building Department >Suppliers >Design professional +Keep accurate records

Owner’s Concerns +What they expect >Clear scope of work >Set limits on contractor’s responsibilities +Homeowner’s primary concerns >Money >Disruption >Time

Money +Retrofitting for safety concerns or obligation +Will get competitive bids +Do NOT low-ball…. unlikely to have money for change orders

Disruptions +Let customer know if & when expected +Make arrangements with customer BEFORE disruptions occur

Schedule +State clearly projected timeline +Make sure owner understands +Let owner know IN ADVANCE of possible delays

Background +Provide references +Proof of bonding and insurance +Contractor’s license number

Limiting Contractor’s Liability +Why? >People ready to sue >Make sure of paperwork for protection +How? >Liability Insurance

Contracts….. Why are contacts important? +State what will be done +How much will be paid for work +Without it, difficult to be paid for work outside the scope of work

Contracts….Key components +Scope of Work +Termination Options +Exculpatory Provisions +Liability Resolution +Additional Work

Contracts….Scope of Work +Most important part of contract +Refer to plans, specs, and codes +Clearly state what is NOT in contract +Exclusions ARE important

Contracts…Termination Options +State when and why contractor may terminate contract >Failure to pay progress payments >Undue interruption & interference >Similar circumstances

Contracts…. Exculpatory Provisions Relieves contractor from liability for existing conditions on site that are not part of scope of work

Liability Revolution +Expansion of construction defect claims against contractors >Inadequate framing, plumbing & roof work >Poor soil work >Improper window installation >Waterproofing +Include provision: No responsibility for existing conditions uncovered while performing work

Contracts….Additional Work +Retrofit often involves conditions of poor previous construction +Make clear that owner responsible for work due to unforeseen circumstances: >If increases scope of work >If owner request additional work >If necessitated by hidden pre-existing conditions

Contracts….Key Provisions +Scope of work +Time to complete project +Price and payment schedule +Subcontractor’s names +Change order provisions +Termination provisions

What Else? +Have a good set of plans +Have a building permit +Keep track of the work in writing +Get help when needed

Warranties +Do NOT guarantee an “earthquake- proof” building +Will protect occupants +Should reduce seismic damage +Building and contents may still be substantially damaged

Warranties +Typical: 1 year for workmanship +By Law: >10 yrs: latent defects >4 yrs: patent defects >3 yrs: negligence

When Should Contractor Quit? +Only if you have a right to do so +Unresolvable disagreement