Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference October 2011 Completing a Project – Cradle to Grave Completing a Project – Cradle to Grave
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
Risk of failure Project Need canal river
Water loss Project Need
Maintenance Project Need
Public Health and Safety Project Need
Regulatory Project Need
Capital Improvements Plan Project Need
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
Preliminary Engineering Report (PER) Technical presentation (alternatives analysis) Environmental evaluation Financial presentation Project management and implementation Resource and citizen benefit Planning
Alternatives analysis Renewable resource benefit Cost effectiveness Reliability Environmental impact Operational ease Planning
Planning Grants - Department of Natural Resource Conservation (DNRC) Call DNRC Renewable Resource Grant and Loan (RRGL) Program Apply for planning grant Hire Engineer Prepare Preliminary Engineering Report (PER) Submit (PER) for RRGL grant Planning grant (2011)/RRGL grant (2013) Planning
How to hire an engineer District vs. Company if fees > $20,000, then MCA MCA Title 18.8.Part 2 – Procurement of Services MCA Title – Publication and content of notice Planning
How to hire an engineer Planning
Engineer’s team Survey Environmental Drafting Geotechnical Cultural Grant writer Owner Legal Insurance Planning
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
Preferred alternative from PER Design calculations and documentation Preliminary drawings and specifications Funding/grants in place Preliminary Design
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
Talk to your engineer Reference environmental evaluation in PER Call agencies Examples: MPDES (Erosion) Section 404 (USACE) Floodplain Navigable Rivers (DNRC) Permitting
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
Final drawings Technical specifications Review package Engineer’s quality assurance review Owner Regulatory agencies Permitting agencies Final Design – Construction Documents
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
Bid documents 1.Plans 2.Technical specifications 3.Front-end contract documents Bidding
Front-End Invitation to bid Bid form Owner – contractor agreement General conditions Special provisions Misc. forms Notice of award Notice to proceed Bidding
State procurement rules If bid >$75,000, then MCA MCA title 18.2.Part 3 – Contract Requirements and Restrictions MCA Title – Publication and content of notice Bidding
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
Owner Engineer Contractor Construction
Resident Project Representative Construction diary Payment applications Requests for information Shop drawings Close-out Construction
Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out
Punch-list Warranties Record drawings Final payment Funding agencies Close-out