Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.

Slides:



Advertisements
Similar presentations
Right of Way Acquisition Process Jesse W. Smith Right of Way Manager.
Advertisements

Metro Muncipal Agreement Program
Construction Contracting
Roles & Responsibilities in Construction Management
Public/Private Partnerships for Water & Wastewater Systems 2006 ACMA Summer Conference Loews Ventana Canyon Resort Tucson, Arizona.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Alternative Project Delivery
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Phases of A BOT Project Prepared By :Afaf Bu-khawa Course title: Technology Implementation,MGT 620.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
New York State Department of Transportation
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Public Private Partnership- Identification, Viability and Implementation Prof. Yashvir Tyagi Prof. Yashvir Tyagi Department of Economics Department of.
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
U.S. Small Business Administration
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office completes Letter of Findings for internal.
New York State Department of Transportation
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
Britannia Village Flood Control System Information Meeting for Directly Affected Landowners February 5, 2009.
Skanska Scholarship at University of Portland Skanska USA
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Specification & Quantities Estimating
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
PURCHASING BASIC QUESTIONS TO ASK YOURSELF:  WHAT IS THE ESTIMATED COST OF THE SUPPLY OR SERVICE?  IS MY DEPARTMENT AUTHORIZED TO BUY THIS? (IE. IT RELATED.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
OREGON DEPARTMENT OF TRANSPORTATION Practical Design Decision Matrix.
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Calistoga Joint Unified School District Measure “A” Citizens’ Oversight Committee Meeting October 27, 2011.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Bank guarantees or letters of guarantee Know the letter of guarantee or bank guarantee is a written undertaking by a Bank, usually at the request of the.
Calistoga Joint Unified School District Measure “A” Citizens’ Oversight Committee Meeting December 19, 2012.
FEDERAL/STATE FUNDING EXCHANGE PROGRAM MICHELE RISKO, CEAO.
Welcome! February 10, Presented by: Steve Dunk (Public Works Board) Cathy Brockmann (Contracts Administration Unit) 2.
Andy Papen Community Development Block Grant Program.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Methods of Documenting Need and Proposed Solutions 2016 CDBG Applicants’ Workshop December 2-4, 2015.
PY 2005 Grant Officer Overview U.S. Department of Labor Employment and Training Administration Office of Grant and Contracts Management.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
DNRC Grants are funded by resource extraction taxes Revenue generated from resource extraction will be used to benefit or sustainably develop natural.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
PART 600 § – 612 Development Requirements PART 600 § – 612 Development Requirements 1 Capital Fund Rule – § (Subpart F)
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
POST-APPROVAL MANAGEMENT CONFERENCE CHICAGO REGIONAL OFFICE POST-APPROVAL MANAGEMENT CONFERENCE CHICAGO REGIONAL OFFICE.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Request For Proposals. Request for Proposals Book 1 Contract Book 2 Project Requirements Book 3 Applicable Standards Reference Information Documents (RID)
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
UNCITRALThird International Colloquium on Public-Private Partnerships (PPPs) October 2017, Vienna Experts for Chapter IV October 2017.
9/18/2018 Bids CONTRACTING Khamis…..
Designers’ Manual Overview and Chapter Contents
City of Roundup, Montana
THE ROLE OF THE PLANSET IN CONTRACT DOCUMENTS
PLANNING DOCUMENTS 2018 New Mexico infrastructure finance conference
Procurement Updates Lynn Rodgers, USDA, FNS
Environmental Requirements and planning grants
Electricity Transmission Network Improvement Project Grant for preparation
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference October 2011 Completing a Project – Cradle to Grave Completing a Project – Cradle to Grave

Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

Risk of failure Project Need canal river

Water loss Project Need

Maintenance Project Need

Public Health and Safety Project Need

Regulatory Project Need

Capital Improvements Plan Project Need

Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

Preliminary Engineering Report (PER)  Technical presentation (alternatives analysis)  Environmental evaluation  Financial presentation  Project management and implementation  Resource and citizen benefit Planning

Alternatives analysis  Renewable resource benefit  Cost effectiveness  Reliability  Environmental impact  Operational ease Planning

Planning Grants - Department of Natural Resource Conservation (DNRC)  Call DNRC Renewable Resource Grant and Loan (RRGL) Program  Apply for planning grant  Hire Engineer  Prepare Preliminary Engineering Report (PER)  Submit (PER) for RRGL grant  Planning grant (2011)/RRGL grant (2013) Planning

How to hire an engineer  District vs. Company  if fees > $20,000, then MCA  MCA Title 18.8.Part 2 – Procurement of Services  MCA Title – Publication and content of notice Planning

How to hire an engineer  Planning

Engineer’s team  Survey  Environmental  Drafting  Geotechnical  Cultural  Grant writer Owner  Legal  Insurance Planning

Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

Preferred alternative from PER Design calculations and documentation Preliminary drawings and specifications Funding/grants in place Preliminary Design

Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

Talk to your engineer Reference environmental evaluation in PER Call agencies Examples:  MPDES (Erosion)  Section 404 (USACE)  Floodplain  Navigable Rivers (DNRC) Permitting

Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

Final drawings Technical specifications Review package  Engineer’s quality assurance review  Owner  Regulatory agencies  Permitting agencies Final Design – Construction Documents

Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

Bid documents 1.Plans 2.Technical specifications 3.Front-end contract documents Bidding

Front-End  Invitation to bid  Bid form  Owner – contractor agreement  General conditions  Special provisions  Misc. forms Notice of award Notice to proceed Bidding

State procurement rules  If bid >$75,000, then MCA  MCA title 18.2.Part 3 – Contract Requirements and Restrictions  MCA Title – Publication and content of notice Bidding

Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

Owner Engineer Contractor Construction

Resident Project Representative  Construction diary Payment applications Requests for information Shop drawings Close-out Construction

Overview Project Need Planning Preliminary Design Permitting Final Design/Construction Documents Bidding Construction Close-out

Punch-list Warranties Record drawings Final payment Funding agencies Close-out

Questions ???