Graphing Behavior & Measuring Change Graph Construction Research Design Graph Interpretation Using Excel to Construct a Graph
Graph Construction
x-axis y-axis Quantity Time
Graph Construction Explicit Graph Title y-axis Title y-axis Labels x-axis Title x-axis Labels
Graph Construction Phase Labels Phase Lines Data Points
Research Design A-B A-B-A A-B-C-A Changing Criteria
A-B design
A-B-A design
A-B-C-A design
Changing Criteria design
Graph Interpretation Common Data Patterns
LEVEL
SLOPE A B A
Abrupt Change in Level A B
Delayed Change in Level A B
Temporary Change in Level A B
Decaying Change in Level A B
Abrupt Change in Slope A B
Delayed Change in Slope A B
Temporary Change in Slope A B
Accelerated Change in Slope A B
Change in Variability A B
Pattern 1 A B
Pattern 2 A B
Pattern 3 A B
Pattern 4 A B
Pattern 5 A B
Pattern 6 A B A
Using Excel to Construct a Graph
Using Excel to Draw Graphs (A) Baseline Graph (A-B) Two Phase Graph (A-B-A) Three Phase Graph
Baseline Graph A
Step 1. Enter data for the Baseline Phase
Step 2. a. Highlight the graph information b. Click on the Graph Icon; c. Choose Line Graph d. Choose Graph Style e. Click on Next Graph Icon Line Graph Graph Style Next Highlight Graph Info
Step 3. Click on Next Next
Step 4. a.Type Chart Title b.Type X axis Label c.Type Y axis Label d.Click Next Chart Title X axis Label Y axis Label Next
Step 5. Click Finish Finish
Step 6. Admire Your Work
Two Phase Graph A-B AB
Step 7. Enter data for second phase. Note: data is not entered into same column as Baseline data
Step 8. Do exactly as you did in Step 2 except you must choose the line graph style indicated. Choose This Line Graph Style Only Step 9. Do exactly as you did in steps 4 and 5.
Step 10. Add a Phase Line a. Click on the line shape b. Draw the phase line on the graph
Step 11. Add Phase Labels a. Click on the text Box b. Align the text box and type the phase label
Step 12. Enjoy Your Work AB
Three Phase Graph A-B-A ABA
Step 13. Add additional data to appropriate column Step 14. Do everything else the same
Enjoy Your Work ABA
Practice Graph #1 Time = consecutive school days. Behavior = number of errors on a daily 10 word spelling test. Baseline = no intervention. Intervention = mental rehearsal prior to taking the test. Baseline 1Intervention Phase 1 Baseline 2Intervention Phase
ABAB