1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Transition to Operations Erik D. Johnson, Deputy ALD for Programs Science Advisory Committee April 4, 2011.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Michael Scharfenstein FAC October LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.
Michael Scharfenstein FAC April 7, 2005 LCLS ES&H Process and Documentation.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Operations Erik D. Johnson, Deputy ALD for Programs NSLS-II Project Advisory Committee February 8-9, 2011.
Breakout Group 2: Software Quality Assurance Outcome 8/18/10 1.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
1 BROOKHAVEN SCIENCE ASSOCIATES Part 851 & Vacuum Systems W.R. Casey NSLS-II Project Brookhaven National Laboratory August 12, 2008 Office of Science Accelerator.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
1.  Mission: Improve and operate accelerators, support the experimental program, and design and construct new accelerator facilities in an environmentally.
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
Environment, Safety and Health
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Conduct of Operations Administrative Controls Ray Karol May 2010.
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
1 BROOKHAVEN SCIENCE ASSOCIATES 2009 DOE Accelerator Safety Workshop BNL S-band LINAC Fire Safety Concerns August 19, 2009 A. Ackerman.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
Accelerator Safety Order Revision Process Frank Kornegay, ORNL SNS Dennie Parzyck, DOE FSO.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
Implementing Program Management Standards at Duke Energy.
Audits & DOE Walkthroughs ISO and OHSAS surveillance audits August 18 th – 20 th –CD, ESH&Q, and FESS organizations to be audited Software.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Rob Connatser NSS Instrument Work Packages and XLPM.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Camera PDR/CD1 Planning 19 September 2008
Planning for Succession
Managing the Project Lifecycle
CBP Biennial Strategy Review System
Software and Systems Integration
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
Regulatory Cooperation Forum (RCF) - Plenary 2018
CBP Biennial Strategy Review System
QA Reviews Lecture # 6.
Integrated Safety and Environmental Management
DOE Review of the LCLS Project October 2006
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009

2 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis “ The set of documents or requirements upon which a decision is made by DOE whether to authorize the commencement or continuation of activities” As defined by DOE Order 420.2B “Safety of Accelerator Facilities”

3 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Strategy Workshop AB Strategy Workshop held August 21, 2009 to; Gain consensus on NSLS-II strategy and obtain concurrence between BNL, NSLS-II and BHSO Incorporate lessons learned from other accelerator authorization experiences Begin a dialog of the details of elements of this strategy including review cycles, schedules and responsibilities Consensus achieved Actions and path forward developed Issue on fate of 420.2B was addressed (has since been resolved)

4 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Path/Strategy Overview Strategy is to: Provide a documented process that assures that the facility is safe to operate and will meet the project baseline performance deliverables Baseline performance deliverables defined as: CD-4 defined as 340K gross sq ft of conventional facilities have been installed and certified to operate properly and safely so as to provide stored electron beam at an energy of 3.0GeV with a stored current of 25mA. 6 beam lines will be installed and ready for commissioning with x-ray beam

5 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Path Baseline Hazards List – March 2006  Environmental Assessment – September 2006 (CD-1) Preliminary Hazards Analysis – January 2007 (CD-1)  Final Hazard Analysis – October 2007 (CD-2)  Preliminary Safety Assessment Document – September 2008 (CD-3)  Linac, Booster & Storage Ring Commissioning – (Commissioning SAD’s & ASE’s)  Final SAD and ASE – 2014 (CD-4)

6 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Path/Strategy Overview NSLS-II AB Strategy is based on the requirements and guidance in: DOE Order 420.2B “ Safety of Accelerator Facilities ” DOE Guide “ Accelerator Facility Safety Implementation Guide ” DOE Order 413.3B “ Program and Project Management for the Acquisition of Capital Assets ” BNL SBMS Subject Area “ Accelerator Safety ”

7 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Path/Strategy Overview NSLS-II strategy is defined in the Project Execution Plan (Appendix B) which describes the phasing and documentation expectations. – The PEP has been reviewed and approved by the Lab and DOE Process is further articulated in the NSLS-II Start-Up Test Plan Rev- 2, 9/08 (Roadmap for steps necessary to bridge the gap from construction through test, checkout, commissioning and turnover for operations) – This document is not approved by DOE Authorization Basis Strategy Workshop held in August 09 – Strategy reviewed and concurred with

8 BROOKHAVEN SCIENCE ASSOCIATES Tailoring of 420.2B Requirements “Accelerators” are classified based on potential hazard which drives level of rigor of safety analysis and approval authority As per Implementation Guide (table 1) the NSLS-II falls into; “Complex” facility with negligible offsite impacts –ASE approved at local DOE site/field office* –ASE/SAD tailored as needed to address workplace/onsite hazards and demonstrate no more than negligible offsite impacts. * 413.3B and PEP also require BHSO approval of SAD

9 BROOKHAVEN SCIENCE ASSOCIATES Modules NSLS-II Plan is to break the AB process into four modules that coincide with the accelerator equipment installation & operations The 4 modules are: Linac Booster Storage Ring Full Operations (roll-up of first three modules) 420.2B Allows “modular” commissioning Milestones for these modules are identified in schedule

10 BROOKHAVEN SCIENCE ASSOCIATES Modules Steps in each of the four modules will essentially be identical and include; Safety Assessment Document Accelerator Safety Envelope Authorization Plan (commissioning plan) Operational controls (training, procedures, organizational structure, etc.) Operational Readiness Evaluation Accelerator Readiness Review Appropriate authorizations/reviews at each step

11 BROOKHAVEN SCIENCE ASSOCIATES Commissioning (ASO Perspective) Commissioning begins after approval by BHSO of authorization basis (documentation, training, procedures etc.) for each module “ The process of testing an accelerator facility, or portion thereof, to establish the performance characteristics. It starts with the first introduction of a particle beam into the system” (as defined by 420.2B) Commissioning confirms safety systems performance and adequacy of shielding as described in SAD/ASE

12 BROOKHAVEN SCIENCE ASSOCIATES Accelerator commissioning pathway Start-Up Test Plan Established as a Framework document Clearly identified requirements –Documentation readiness –Technical readiness –Personnel Training and Qualification –Testing -Sub-system testing and qualification (safety systems, interlocks etc) -Integrated systems tests -Commissioning with beam Acceptance criteria for CD-4 clear Integrated test/commissioning activities identified in WBS

13 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Commissioning and Operation Authorization

14 BROOKHAVEN SCIENCE ASSOCIATES Conclusion NSLS-II Authorization Basis Strategy is well defined and compliant with DOE Order 420.2B BHSO has been briefed on strategy and has concurred 420.2B is expected to be modified, however modifications will not impact the NSLS-II strategy Authorization documentation preparation is starting Will need to elaborate Start-Up Test Plan through FY10 to meet schedule and provide detail