LBT Q1 2008 Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Advertisements

LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
TCS3 Conceptual Design Review 1 Aug 21, 2003 TCS3 Project Replacement of the Telescope Control System for the IRTF Conceptual Design Review Aug 2003.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Chapter 1 Creating a Flyer
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
CGS 1060 Introduction to MicroComputer Usage Chapter 1 Windows 7
1. Scope of the Project Diagnostic tools are already being used by GE for compressor performance, but they are… – Too expensive – Time Consuming – Hazardous.
Mix Master Software Discussion Alex Rust & Nate Lamie.
Mix Master Status Report Alex Rust & Nate Lamie. 11/19/02Alex Rust & Nate Lamie Background Consumers enjoy elaborately mixed beverages but do not have.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
PowerPoint Presentation By: David Larson. IPA’s Identify Components of Visio 2010 interface, navigate a Visio drawing, and get help Using Visio. Manipulate.
Unit E. Image Measurements The size of an image can be measured 2 ways: Dimensions: the height and width, measured in pixels. File Size: measured in Kilobytes.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBTO software startup/shutdown and troubleshooting July 18, 2006 Chris Biddick 1 cjb.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
20 October 2008LBT Q Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
Module 1 – Lesson 6 Ms. Tracy. Bell Ringer What is the typical useful life for a personal computer?
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
Communicating Visually with Visio Gini Courter Annette Marquis.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
How to Setup Scan to on most Sharp Models.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
CSC190 Introduction to Computing Operating Systems and Utility Programs.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
Introducing Dreamweaver. Dreamweaver The web development application used to create web pages Part of the Adobe creative suite.
21 July 2008 LBT Q Eng/SW Review 1 SIN – Software Infrastructure Titus Purdin.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
Presentation transcript:

LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern

04-Apr-2008LBT Q Eng/SW Review Highlights (Q1/2008) Proximity sensors were installed on the left rear elevation pad and initial installation was made of a set of oil flow reducing capillaries. Small moves were made taking the telescope from horizon to zenith with the capillaries installed, when we attempted to move the telescope back to horizon from zenith we ran aground at 81 degrees. Ran out or Engineering time, the capillaries have been removed and installation will continue when time becomes available. Proximity sensors were installed on the left rear elevation pad and initial installation was made of a set of oil flow reducing capillaries. Small moves were made taking the telescope from horizon to zenith with the capillaries installed, when we attempted to move the telescope back to horizon from zenith we ran aground at 81 degrees. Ran out or Engineering time, the capillaries have been removed and installation will continue when time becomes available. Extraction of flowchart for existing PLC code is nearly complete (130 pages). Extraction of flowchart for existing PLC code is nearly complete (130 pages). Siemens/LINUX interface agreed upon and ordered Siemens/LINUX interface agreed upon and ordered

04-Apr-2008LBT Q Eng/SW Review Open Issues Technical Technical PLC Control law unknown, undocumented. PLC Control law unknown, undocumented. Firewall not penetrable for WinCC Firewall not penetrable for WinCC Capillaries not installed in any El and Az pads Capillaries not installed in any El and Az pads Schedule Schedule None None Financial Financial None None Resource Resource Mountain support pacing operation Mountain support pacing operation Network and Firewall communications issues unresolved Network and Firewall communications issues unresolved

04-Apr-2008LBT Q Eng/SW Review Progress (Q1/2008) Capillary adaptors installed on EL in L-R corner. Capillary adaptors installed on EL in L-R corner. Limited measurements made with proximity sensor Limited measurements made with proximity sensor Flow Chart nearly complete Flow Chart nearly complete Siemens/LINUX interface agreed upon and ordered Siemens/LINUX interface agreed upon and ordered

04-Apr-2008LBT Q Eng/SW Review Planning (Q2/2008) Move the El and Az capillaries at the pads and resize Move the El and Az capillaries at the pads and resize Systematic measurement of lift, tuning system to maximize stiffness Systematic measurement of lift, tuning system to maximize stiffness Replace hoses with hard pipe on level 5 Replace hoses with hard pipe on level 5 Receive existing S7 code properly flowcharted (VoltsDC) Receive existing S7 code properly flowcharted (VoltsDC) Install Siemens/LINUX interface Install Siemens/LINUX interface Describe new control laws correcting: Describe new control laws correcting: pressure OK pressure OK system shutdown when pocket pressures fail system shutdown when pocket pressures fail control around pressure, not lookup table (LBT) control around pressure, not lookup table (LBT) Rewrite PLC code using new control laws (VoltsDC) Rewrite PLC code using new control laws (VoltsDC) Reduce system pressure from 120 to 95 bar. Reduce system pressure from 120 to 95 bar. MCSPU software revisions: MCSPU software revisions: Modify HBS Control/monitor State machine to use newly available tags Modify HBS Control/monitor State machine to use newly available tags Amend HBS Command set as needed Amend HBS Command set as needed Display detailed HBS status in Eng. Interface display page Display detailed HBS status in Eng. Interface display page Use new CTI PLCIO to communicate with both AB TPLC and Siemens HPLC Use new CTI PLCIO to communicate with both AB TPLC and Siemens HPLC MCS needs to copy HBS status info into shared memory for rest of TCS. MCS needs to copy HBS status info into shared memory for rest of TCS. Add HBS information and commands to MCS GUI Add HBS information and commands to MCS GUI