Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.

Slides:



Advertisements
Similar presentations
© 2010 The MITRE Corporation. All rights reserved. AERONAUTICAL COMMUNICATIONS PANEL (ACP) THIRTEENTH MEETING OF THE WORKING GROUP I Bangkok, Thailand.
Advertisements

FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
AOC/FOC Interface for Data Comm Production System
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 En Route Route Clearances Draft Use Case Introduction Boeing –
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Data Link Communications
Data Communications Implementation Team (DCIT)
Document Tracking and the Related Process Andria Roney Rob Mead Andy Fry Andrew Onken.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT23 Update To:DCIT23 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 29 From: Data Comm Production Sub-Team Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #21 Plenary 02/01/2013 To: DCIT By: Gregg Anderson.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Meeting 08/24/2011.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date:
Presented to: By: Date: Federal Aviation Administration DCIT 44 Mark Patterson, FAA, AFS Nov 2015 Flight Standards Update.
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 26, 2013 Federal Aviation Administration Data Communications DCIT FDWG Climb Via Discussion.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #15 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
| 1 harris.com Matt Maki DCL Trials Lead DCL Trials Decommissioning Plan 29 Sep 2015.
SWIM Users Forum – Session # 9
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
Federal Aviation Administration TDLS-CSP IRD and SDB-CSP IRD Update To: DCIT #24 From: Bruce Notley Date: 6/13/13.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Program Final Investment Decision (FID) – Update on May 30, 2012 Presented to:SC-214/WG-78 Plenary.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration System Wide Information Management SWIM Implementing Programs (SIPs) Status Presented to: Demonstrations and Prototypes.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
P. Muraca v0.4 Data Comm DCL Trials end to end system test.
P. Muraca v0.2 Data Comm DCL Trials end to end system test.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #16 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Subscriber Database (SDB) and Web Access To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 3/13/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #32 PLENARY DCL Trials.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 26 From: Data Comm Production Sub-Team Date:
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #12 Plenary 01/12/2011 To: DCIT By: Gregg Anderson.
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
International Civil Aviation Organization
Data Communications Program
Data Communications Implementation Team (DCIT)
Presentation transcript:

Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May 30 – 31, 2012

Federal Aviation Administration DCIT # 15 May 30 – 31, 2012 Status Documents –Test Plan complete –E-E System Test Cases Document 85% complete –VRTM 90% complete –Working on SAT plan/procedures Coordination –ARINC and SITA service / connections –FAA FNTB – nesg gateway –T.C Project Aircraft –HADDS Lab for failover and revision change testing –Boeing Air Lab –DCIT Aircraft (FedEx, United, Delta) –A. Fry AIR LAB 2

Federal Aviation Administration DCIT # 15 May 30 – 31, 2012 Status - Test Activities 3 startstop pDTAP delivery to Tech Center5/10/20128/15/2012 pDTAP / HADDS in-box Interface Testing5/14/20125/28/2012 pDTAP / HADDS via FNTB Interface Testing5/28/20126/4/2012 pDTAP / HADDS / CSP Interface Testing via FNTB6/4/20126/13/2012 pDTAP / HADDS / CSP / LAB Avionics Connectivity Testing via FNTB6/13/20126/20/2012 pDTAP (applicable) Requirements Testing via Lab infrastructure6/20/20127/18/2012 pDTAP (applicable) Requirements Testing via Lab infrastructure to Boeing Air Lab7/18/20128/1/2012 pDTAP PTR fixes / Regression Testing in LAB env.8/6/20128/15/2012 Test Plan Update5/10/20127/20/2012 Test Cases Final5/10/20127/20/2012 pDTAP Quick Look Report7/11/20128/15/2012

Federal Aviation Administration DCIT # 15 May 30 – 31, 2012 Status - Test Activities (cont.) 4 DTAP End to End System Test8/15/201210/12/2012 DTAP Requirements Testing using Lab Infrastructure (follow VRTM & Test Cases)8/15/20129/14/2012 DTAP Requirements Testing using Lab Infrastructure with Test Aircraft (follow VRTM & Test Cases)9/14/20129/21/2012 DTAP Requirements Testing using Lab Infrastructure with Boeing Air Lab (follow VRTM & Test Cases)9/21/20129/28/2012 DTAP Requirements Testing using Lab Infrastructure with FedEx / Delta / United aircraft (follow VRTM & Test Cases)9/28/201210/5/2012 DTAP Error Conditions / Abnormal Cases8/5/201210/12/2012 DTAP PTR Fixes / Regression Testing8/5/201210/12/2012 End to End Test Report9/14/201210/12/2012

Federal Aviation Administration DCIT # 15 May 30 – 31, 2012 Status - Test Activities (cont.) 5 DTAP Site Acceptance Testing10/15/201210/26/2012 Final SAT Sub_set Test Cases document9/14/201210/12/2012 End to End Connectivity & Functional testing in field10/15/201210/18/2012 Failover Conditions Testing10/18/201210/20/2012 End to End Operational testing based on Sub_set Test Cases10/15/201210/26/2012 SAT Final Test Report10/15/201210/29/2012

HADDS HID HOST ERAM HADDS HID HOST ERAM NESG ED-8 ACY Airline HOST DEMARC TEST ED-8 ACY FAA Technical Center FNTB DEMARC FTI OPS IP HADDS HID HOST ERAM DTAP MOUSE KYBRD MONITOR OS FDP DCL AFN HMI FANS 1/A+ STACK ,3 ARINC SITA IP TEST TOWER TDLS DCL Trials Architecture Airline HOST ARTCC 2 3 2,3 HADDS CSP & API DATA RECORD DEMARC TDLS PC-RCU Strip Printer