PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Software Quality Assurance Plan
PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
EQUIPMENT VALIDATION.
Establish Verification Procedures (Task 11 / Principle 6)
PACS IQR13 Jan 2005 Optical Plans PFM 1 Optical Qualification and Plans for PFM N. Geis MPE.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.
Supplementary Training Modules on Good Manufacturing Practice
Quality Assurance/Quality Control Policy
TCCA Aircraft Certification
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
PACS IHDR 12/13 Nov 2003 PACS FPU Mirrors and Black Paint R. Graue, D. Kampf Kayser-Threde.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
Your project title here Your name Construction Management University of Houston PROGRESS REPORT Reporting Period: From date – To date.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
PACS IBDR 27/28 February 2002 PACS Grating Assembly1 Grating Assembly E. Renotte Centre Spatial de Liège (B)
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
1 ACSF Test Procedure Draft proposal – For discussion OICA and CLEPA proposal for the IG Group ACSF Tokyo, 2015, June Informal Document ACSF
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IHDR 12/13 Nov 2003 Filters1 N. Geis MPE. PACS IHDR 12/13 Nov 2003 Filters2 PACS Filter Scheme Filter scheme with 5 or 6 filters in series in each.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
CEA DSM Dapnia SAp Readout mode of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/SAp.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
PACS ICC Readiness Review MPE, July 3/ PACS Photometer PV Phase Plan 1 Status Report M. Nielbock: PACS PHOT PV Phase Plan Markus Nielbock (MPIA)
Assembly, Integration & Verification 2015 SKA Engineering Meeting Richard Lord 11 November 2015.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope
HMI Top Level Requirements
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
Presentation transcript:

PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher

PACS IHDR MPE 12/13 November 2003 AIV 2 Approach to Instrument AIV: Integration, Qualification and Testing Integration of Instrument Subunits takes place at the individual manufactureres of the respective Subunit. Integration of PACS Units for Instrument testing takes place at MPE under it‘s responsibility. Qualification of Instrument Subunits and Units (performance and environmental qualification) is verified by the individual manufacturers before delivery of a Unit to MPE. Delivery reviews will be held. PACS Instrument Integration and Testing starts with the delivery of Units, acceptance of a Unit is based on a complete ADP and Incoming Inspection Plan. AIV program and updated flow charts (giving the status at the time of IHDR) will be included in AIV Plan PACS-ME-PL-018-issue1. Verification of PACS instrument performance is done by MPE and is based on Instrument Level Tests (ILTs) according to PACS-ME-PL-012-issue2. Test flows and schedules will be specified for all individual PACS models. Verification of PACS instrument performance requirements is assured by tracing the specifications listed in the PACS Calibration Document PACS-MA-GS-001 to the individual test steps carried out during ILT.

PACS IHDR MPE 12/13 November 2003 AIV 3 Content of Instrument Verification Documents 3 documents specify the PACS AIV activities on Instrument Level. The basic DDVP PACS-ME-PL-002 will not be updated any more as the general development programs are completed and remaining activities concentrate now on solving a few specific problems Instrument AIV Plan, describes general assembly organization, integration concept and integration sequences, but does not include the ILT related details; update to PACS-ME-PL- 018 iss.1 is due Instrument Test Plan, covers all test activities and all test related AIV, shows the verification control matrix w.r.t. instrument models and instrument performance; update to PACS- ME-PL-012 iss.2 is due PACS Calibration Document, PACS-MA-GS-001 draft7 is getting permanently refined and will be used to relate instrument performance specifications to certain ILT test steps (verification control document), PCD requirements traceability matrix will be included in issue 2 of Test Plan

PACS IHDR MPE 12/13 November 2003 AIV 4 AVM WE Integration Sequence (no change since IIDR)

PACS IHDR MPE 12/13 November 2003 AIV 5 General Instrument AIV Sequence including ILTs (sequence is different for individual PACS models, details see PACS-ME-PL-012 iss2)

PACS IHDR MPE 12/13 November 2003 AIV 6 Compatibility of CQM+AVM Test Program with current test time limitation Fairly comprehensive CQM characterisation program can be carried out CQM schedule is very tight because start date is dictated by late deliveries of subunits and a quite pressing delivery date of AVM and CQM to ESA Proposed 25 % shortening of CQM ILT program compared to PFM ILT program is achieved by reducing the test parameter space and not doing a perfect wavelength calibration with TUFIR facility  results in less information concerning calibration accuracy, e.g., linearity, wavelength accuracy, sample points in calibration curves etc.  provides a good information on design verification and instrument characterisation (but, search for spectral ghosts in the FPU spectrometer section is not possible).  maintains the chance of not missing a last feed-back to a PFM FPU improvement (e.g., baffling)

PACS IHDR MPE 12/13 November 2003 AIV 7 Overall Configuration of ILT Set-up during AVM+CQM, FM, FS

PACS IHDR MPE 12/13 November 2003 AIV 8 FPU STM Upgrade and Cryogenic Vibration Sequence (STM cryovibration foreseen to replace CQM cryovibration, RFW-007 issued)

PACS IHDR MPE 12/13 November 2003 AIV 9 CQM+AVM Instrument Integration and Test Sequence

PACS IHDR MPE 12/13 November 2003 AIV 10 EMC Test Sequence during ILT EMC Conducted Emission and Susceptibility Test (common mode) on Signal Reference - steady state & - transients

PACS IHDR MPE 12/13 November 2003 AIV 11 Duration AVM ctd Test and CQM+AVM Instrument Integration

PACS IHDR MPE 12/13 November 2003 AIV 12 Duration CQM+AVM Instrument Test Sequence

PACS IHDR MPE 12/13 November 2003 AIV 13 PFM Instrument Integration and Test Sequence

PACS IHDR MPE 12/13 November 2003 AIV 14 Duration PFM Instrument Integration and Cryovibration

PACS IHDR MPE 12/13 November 2003 AIV 15 Duration PFM Instrument Test Sequence

PACS IHDR MPE 12/13 November 2003 AIV 16 FS Instrument Integration and Test Sequence

PACS IHDR MPE 12/13 November 2003 AIV 17 Duration CQM FPU Refurb.+ FS Instrument Test Sequence