Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, John Teeter for NIST, Kay Clinard UCAIug.

Slides:



Advertisements
Similar presentations
Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, for NIST August 6, 2013.
Advertisements

Impact of Smart Grid, ICT on Environment and Climate Change David Su Advanced Network Technologies National Institute of Standards and Technology ITU Symposium.
S&I Framework Testing HL7 V2 Lab Results Interface and RI Pilot Robert Snelick National Institute of Standards and Technology June 23 rd, 2011 Contact:
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
Green Button Initiative GREEN BUTTON TECH STATUS Marty Burns and Dave Wollman 1/9/2013.
AMI Home Area Network Update SAG Meeting March 18, 2014.
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview November.
Weekly OpenADE Meeting Notes Tuesday, January 14, 2014.
Presentation Topics  ESPI / DMD deeper dive o Atom feeds o ESPI Usage schema o Ontario Guidelines  CMD Technical Overview o Protocols and underlying.
What is Green Button All About? Making metered data available to consumers. All electric users have meters that are used to measure how much energy.
NAESB REQ.21 Update Dr. Martin J. Burns, Hypertek Inc. for NIST February 21, 2014.
Bryan Blunt, IAQG OASIS Administrator Montreal, Canada October, 2013 OASIS Tools for Suppliers.
VYKON Tenant Billing Service
TECHNOLOGIES AUTOMATED METERING. Proprietary Information Of Energy 2013 MACDILL AFB METERING DOD Implementation Guidance – MAJCOM Energy Mangers shall.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
OpenFMB Specification Development Plan
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
IPRM Overview Zahra Makoui SG Conformity Vice Chair March 2011 Source: SGIP SGTCC
Quality Management Systems P.Suriya Prakash Final Mech Vcet
Results you can rely on What Is New/Updated in Air Quality? TRC Companies, Inc. August 2011 TRC Companies, Inc. August 2011.
SMART METER TEXAS Status Update July 29, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
Introduction & Overview April 11, 2011 Barry Haaser Managing Director.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
PAP 10 UCAIug OpenSG Customer Domain Involvement.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
IAQG OPMT OP Assessor Training SMS, CBMC and OASIS Oversight Assessment February 2015 Module 16.
Facility Smart Grid Information Model
OpenADE Knoxville Meeting February 27 – March 1, 2012 David Mollerstuen, OpenADE TF Chair Steve Van Ausdall, OpenADE TF Vice-Chair.
Doc.: IEEE /0047r1 Submission SGIP Liaison Report to IEEE Following the SGIP (2.0) Inaugural Conference Nov 5-7, 2013 Date:
SMART METER TEXAS Status Update June 3, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
OpenADE: Roadmap, ITCA, Sample Implementation November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair.
Conformance Mark Skall Lynne S. Rosenthal National Institute of Standards and Technology
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
Weekly OpenADE Meeting Notes Tuesday, January 07, 2014.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Weekly OpenADE Meeting Notes Tuesday, January 23, 2014.
FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008.
25 August UCA International Users Group Testing Quality Assurance Program Funding Issues 25 August 2010/ Updated 12 October 2010 Jack Robinson,
OpenADE: Agenda, SGIP PAP10, NAESB ESPI November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair.
NAESB Smart Grid Standards Task Force PAP10 Discussion William Cox —
OpenADE: OpenADE, ESPI, OpenADE 2.0 Scope November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair.
Customer Data Access -The New Ground Floor Christopher Irwin US Department of Energy – Office of Electricity Oct 16, 2015.
Project CIM Test Development Process
Supervision SICOR Securities, Inc.. Why? NASD 3110 requires the firm to “…establish and maintain a system to supervise the activities of each registered.
Balancing Privacy, Security, and Access Presented by Chris Villarreal Minnesota Public Utilities Commission October 16, 2015.
Privacy of Customer Energy Usage Data: Protecting Consumers and Giving Them the Tools with which to Protect Themselves Aryeh B. Fishman Director, Regulatory.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
© 2012 IBM Corporation 3 rd Party Registration & Account Management 1 1 SMT Post R 4.3 Potential Enhancements.
OpenADE November 17, 2011 PM2 David Mollerstuen, OpenADE TF Chair Steve Van Ausdall, OpenADE TF Vice-Chair.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
SMART GRID INTEROPERABILITY PANEL WINTER 2012 FACE-TO-FACE IRVING, TEXAS  DEC. 3-6, 2012 SMART GRID TESTING & CERTIFICATION COMMITTEE GENERAL MEETING.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
© 2010 EnerNex Corporation. All Rights Reserved. SGIP TCC / OSG Cooperation Presented By: Erich Gunther EnerNex Corporation 2010.
ISO :2015 Documentation kit for Accreditation of Certifying Body - by Global Manager Group
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
The OASIS Feedback Process Using OASIS to Drive Improvement.
Direct Participation Enrollment Process for 2017 DRAM
Testing Technical Committee Paris, France August 24, 2010
Global Solar Certification Network
Green Button Connect My Data
Enabling Standards for Demand Side Management
EnerNOC Customer Data Presentation July 13, 2016
Margaret Goodrich June 18, 2010

Presentation transcript:

Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, John Teeter for NIST, Kay Clinard UCAIug

Agenda  Green Button ITCA UCAIug Organization ITCA Structure Dry Run Process Flow Dry Run Artifacts  Green Button Test Plan Testing and Certification Plan Breakdown Application Profiles Conformance Blocks Function Blocks Test Procedures 2

UCAIug Green Button ITCA 3

UCAIug Organization 4

UCAIug ITCA Architecture 5 Recognizes NAESB Develops, maintains and Owns Standard CB’s (ISO 65 ) Manages Certification Program, reviews TL reports, and Issues and Maintains Certificates SGTCC IPRM 2.0 Provides guidance for ITCA Implementation Green Button ITCA Develops, maintains, and owns Certification Program Requirements CPR’s. Posts and maintains certificates on-line, Provides Help Desk, FAQ, Marketing for Program, resource to AB’s CPR’s (ISO 67) Test Scheme for Green Button Certification AB’s (ISO 17011) Accredits CBs and TLs Products / systems [Data Custodians/3 rd party] Certified interoperable NAESB REQ.21 Standardizes Energy Services Provider Interface (ESPI), OpenADE Identifies Requirements for energy services provider interface TL’s (ISO 17025) Perform Certification Tests per Green Button CPR’s as established by ITCA SGIP NAESB UCAIug Overview Green Button Certification Program Roles and Scope

Testing Process Flow Chart 6 1. All Dry Run Artifacts and Relationships Created Test Labs are identified and registered with CBs Test Labs are Identified on various web sites 2. Vendor selects test lab May get from UCAIug list May get from CB list May get from prospective test lab 3. Vendor Application Form Application Form Application for Certification 4. Application Accepted Vendor Informed that application accepted and test scheduled 5. TL administers test 6. Test Report Generated Failures get addressed and possible retest -- go back to step CB gets Test Report Reviews report Issue Certificate if Approved Notifies Program Owner (UCAIug) 8. Posting Successful Vendors on Public Web Page 9. Certifications managed revoked and renewed

UCAIug Green Button Dry Run Package Benefits of Participating in UCAIug GITCA Dry Run GBDMD Logo Green Button Application UCAIug Green Button Testing Scheme Policies and Procedures Green Button Compliance Certificate Green Button Conformance Blocks Green Button Download My Data PICS Green Button Test Cases Green Button Test Data Sheet Green Button Test Plan Green Button Test Plan DMD Dry Run UCAIug – ABs Memorandum of Understanding Example GBA Test Lab MOU - Agreement 7

Green Button Test Plan 8

Green Button Testing and Certification Implementation Agreements Application Profiles Standards Updates Test Requirements Requirements Breakdown Requirements verification Test Procedures Software Implementation Green Button Download My Data Green Button Connect My Data ITCA Certification Mark Certification Process Certification Bodies Certified Green Button Implementations 9

Green Button Test Plan Requirements Breakdown 10 Applications Profiles Section 3 GBTP Function Blocks Section 5 GBTP Test Requirements Rows of GBTC spreadsheet From source documents From experience Test Cases Rows of GBTC spreadsheet GBTP – Green Button Test Plan Document GBTC – Green Button Test Cases Spreadsheet

Green Button Test Plan Application Profiles Green Button Download My Data Green Button Connect My Data Smart Device acquires Green Button Data from Data Custodian Third Party acquires large batches of Green Button Data from single Utility Original reads (Catch up data) Collecting Sub-metering Data Green Button Commercial Profile Green Button Industrial Profile 11

Green Button Functional Blocks: DMD [FB_1] Common – common to all profiles [FB_2] Green Button Download My Data – specific to Green Button Download My Data [FB_4] Interval Metering – generic for interval data [FB_5] Interval Electricity Metering – specific electricity interval metering [FB_6] Demand Electricity Metering – demand measurements [FB_7] Net Metering – net metering measurements [FB_8] Forward and Reverse Metering – forward and reverse separate measurements [FB_9] Register Values – metering register measurments [FB_10] Gas – gas interval data [FB_11] Water – water interval data [FB_29] Temperature – coincident temperature measurements [FB_12] Cost of Interval Data – cost attribution of interval data [FB_15] Usage Summary – billing period summary dashboard [FB_16] Usage Summary with Cost – billing cost data included in summary [FB_17] Power Quality Summary – power quality summary dashboard [FB_27] Usage Summary with Demands and Previous Day Attributes – additional detail in summary [FB_28] Usage Summary Costs for Current Billing Period – current billing period bill estimated costs [FB_30] Common User Experience – common web presence user experience for DMD 12

Green Button Conformance Blocks 13

14

Testing a Green Button Data File 15 Select Common Scope Download Test Results Browse for file (IE9) Drag/Drop (FF) Edit Scope (Function Blocks)

Sample Results 16 SUCCESS ERRORS

Test Procedure (part 6 of GB Test Plan Document) 17 Application form Test Procedures Refers to ITCA Docs

Test Procedures 18 Test Case Step By Step Procedure Function Block Summary of Acceptance Criteria Test Witness

Questions and Comments? 19