ITER In-Vessel Coils (IVC) Interim Design Review PDR Checklist Items C Neumeyer July 28, 2010 July 26-28, 20101ITER_D_3MAZCX.

Slides:



Advertisements
Similar presentations
Plans for LSE-130 through CD-2 Gregory Dubois-Felsmann SLAC National Accelerator Laboratory.
Advertisements

More CMM Part Two : Details.
ITER In-Vessel Coils (IVC) Interim Design Review Integration with Interfacing Systems C Neumeyer July 28, 2010 July 26-28, 20101ITER_D_3M3P5Y.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
SAFETY, HEALTH, AND ENVIRONMENTAL AUDITING
Cover graphic should fill and not exceed the defined grey box. June 27, 2013 Gary Devlin API Subcommittee 18 – Quality Task Group 7: Product Life Cycle.
TCCA Aircraft Certification
Performance Metrics for EMS Self Assessment & Management Review 30 th Environmental and Energy Symposium & Exhibition April 5 – 8, 2004.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
Chapter 6 Software Implementation Process Group
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
Software Quality Assurance Activities
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
This semester you will use an engineer’s notebook to document the process that you will use to design a product. Your notebook will be organized and formatted.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
ITER In-Vessel Coils (IVC) Interim Design Review Introduction C Neumeyer July 26, 2010 July 26-28, 20101ITER_D_3F7XHR.
SE Team Agenda Review work being done by Dwayne –Review Sect 4.4.X for DAG – being processed –SEP Guide – being processed; seen as OK –Technical Reviews.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Presented to: Verification and Validation Summit By: James Daum NextGen and Operations Planning Safety Manager AJP-1900 Date: November 05, 2009 Federal.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
Hull Survey for New Construction Z23 (July 2006) John Finch Chairman IACS expert group on the Hull survey for New Construction September 2006.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
ITER In-Vessel Coils (IVC) Interim Design Review Thermal Structural FEA of Feeders A Brooks July 27, 2010 July 26-28, 20101ITER_D_353BL2.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Critical Design Review (CDR)
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
May 2001, Istanbul Workshop Production Certification Process Status Jack Fowler.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
Quality Assurance at CMM Level 2 Copyright, 2000 © Jerzy R. Nawrocki Requirements.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
Atlas Polar CDR meeting March 2 & 3, 2016 DAY 2. Review Latest CAD Sample screenshots from Feb 12 CAD.
First-Year Engineering Program Preliminary Design Review (PDR) Definition PDR Objectives PDR Material Project Management Review.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Accelerator Readiness Review October 31, 2006
Supportability Design Considerations
CAD/PAD Development Process
Project Management W. J. Foyt
Software and Systems Integration
Software Requirements
Flooding Walkdown Guidance
Peer Review Agenda (Suggested).
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Engineering Processes
Lockheed Martin Canada’s SMB Mentoring Program
Instrument PDR Summary of Objectives
Radioactive waste management - status
Engineering Processes
CS/EE/ME 75(a) Nov. 19, 2018 Today: Prelimnary Design Review Homework.
Authors: W. Chung et al, ITER Korea Highlights
Project Management Considerations
PSS verification and validation
TG3 Process /Part 2 Gábor László NSS Lead Instrument Engineer
DOE Review of the LCLS Project October 2006
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

ITER In-Vessel Coils (IVC) Interim Design Review PDR Checklist Items C Neumeyer July 28, 2010 July 26-28, 20101ITER_D_3MAZCX

PDR Checklist Reference: “Design Review Procedure” IDM 2832CF v1.12, Table “Preliminary Design” Method: – Table entries summarized and assessed in following tables July 26-28, 20102ITER_D_3MAZCX

ItemRequirementStatus/Plan Configuration ItemsAll CI’s identified and acquisition plans developed Not yet addressed but doable Specifications, Codes, and Standards, Design Objectives SRD approved or reviewed and ready for approval SRD in work, doable Models and drawingsDesign definition in models and drawings adequate to support evaluation of the ability to attain the required performance and to assess compatibility with the Configuration Model In good shape, with possible exception of port penetration and interface with TCWS and DC bus bar Interface controlAll interfaces defined in approved documentation, e.g. specifications, interface control documents, or drawings. ICDs drafted, need more work, approved ICDs should be doable July 26-28, 20103ITER_D_3MAZCX

ItemRequirementStatus/Plan Design issuesAll design issues from previous reviews resolved, chits from pertinent issues are closed In work, doable Design vs. requirements Design Description Document (DDD) updated and approved by the RO Plan to write detailed report plus DDD, doable Design basisAnalyses establish that the design is feasible and meets criteria. Analyses documented in auditable analysis reports. R&D activities complete, material properties characterized and documented Expect to complete except testing of proto conductors will not be complete, will need additional R&D to characterize, possibly including SSMIC in radiation field ManufacturabilityEvidence from manufacturing R&D activities SSMIC production and jointing will be demonstrated by R&D, but testing (e.g. bending SSMIC) will not be complete. July 26-28, 20104ITER_D_3MAZCX

ItemRequirementStatus/Plan ConstructabilitySubsystem assembly, installation, and test plan documented in DDD. In work, doable RAMIFMECA documented in reports, remote handling requirements documented in approved interface documentation. In work, doable ES&HEnvironmental and safety hazards during assembly, installation, testing, operation, and decommissioning need to be identified and mitigated, Hazard analysis and mitigation documented. Not addressed yet but doable, include in final report and DDD. COTS and parts standardization Design optimization for use of COTS equipment and standard parts documented in DDD COTS not feasible but may be possible to cite some parts standardization in DDD. July 26-28, 20105ITER_D_3MAZCX

ItemRequirementStatus/Plan Quality AssuranceIdentify the quality categories in accordance with MQP. Quality-related classifications documented in the PR, SRD, PTS and Classification Criteria Document Not addressed yet but doable. Design Compliance As the preliminary and final design reviews are conducted, this matrix should be progressively completed and reviewed. Not addressed yet but doable. July 26-28, 20106ITER_D_3MAZCX

Summary PDR requirements can be satisfied except: – testing of proto conductors will not be complete will need additional R&D to verify assumptions concerning – Material properties – Engineering allowables – Bending limitations – may need tests on final SSMIC in radiation field Caveat: PDR scope includes coils only – Other systems need further development Power supplies and bus bar Cooling water I&C and interlocks July 26-28, 20107ITER_D_3MAZCX