© 2008 GS1 1 Certification Framework Certification Framework Document Operations Manual Team 7: Deliverables.

Slides:



Advertisements
Similar presentations
New GSMP Governance Proposal (This recommendation provides the governance approach for the standards development only) ISDP Governance Team 2-September-2009.
Advertisements

best practice project management methodology ©Platinum Services Group Limited What is XPRODi ?
ELTSS Alignment to Nationwide Interoperability Roadmap DRAFT: For Stakeholder Consideration in response to public comment.
Operational Information Standard Test Procedure Introduction: We encourage the use of a common template and methodology to produce Standard Test Procedures.
Moving forward together, to better serve your business ©2009 GS1 1 The New GSMP: ISDP Process Integration Project Update 29 July 2009.
International Civil Aviation Organization Regional Cooperation in the Southern African Development Community (SADC) Cliff Elbl CTA/Project Coordinator.
BEDES & SEED Building Energy Data Exchange Specification & Standard Energy Efficiency Data Platform April 14, 2015 Robin Mitchell Lawrence Berkeley National.
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
Implementation Plans and Teams IACT424/924 Corporate Network Design and Implementation.
OHT 14.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software quality infrastructure components The need for procedures and.
GS1 Healthcare Roadmap January 2015.
GS1 Certification & Accreditation Programmes October 2014 Rome Standards Event.
The Global Sustainable Tourism Council (GSTC) Recognition and Accreditation Cathy Parsons and Amos Bien GSTC membership meeting Barcelona 2011.
Operational Information Equipment Manual Equipment manual Introduction: We encourage the use of a common template and methodology to produce Equipment.
Standardization. Introduction A standard is a document. It is a set of rules that control how people should develop and manage materials, products, services,
1 1 Roadmap to an IEPD What do developers need to do?
© The Process Factory Ltd The Workflow Management Coalition Jon Pyke – Chair WfMC.
OE 3B Roles & Responsibilities New GSMP V15 26 th August 2009.
Identity and Access Management PM COP Forum May 20, 2014Tuesday10100 AMLamont Library.
Emergency Management Information System - EMIS
Unified Software Development Process (UP) Also known as software engineering process SEP describes how requirements are turned into software Defines who,
ITIL & COBIT O6PLM Kevin Lisay – Rendy Winarta –
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
What is a life cycle model? Framework under which a software product is going to be developed. – Defines the phases that the product under development.
2008 New York - Member Forum Council for Responsible Jewellery Practices, Ltd. Overview of CRJP.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
What is NIEM? 1 NIEM is a national program supported by the federal government to increase information sharing between organizations who share a common.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
Public Health Data Standards Consortium
1 Guiding Principles for Nationwide Interoperability A Brief Overview of Recent Efforts and Progress.
Requirements as Usecases Capturing the REQUIREMENT ANALYSIS DESIGN IMPLEMENTATION TEST.
© 2011 Lantana Consulting Group, 1 Open Health Tools Membership Presentation July Lantana Consulting Group Transforming healthcare.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Information Gathering Prototypes Structured Walkthrough.
S&I PUBLIC HEALTH REPORTING INITIATIVE: DEVELOPING OF A TEAMING APPROACH S&I Public Health Reporting Initiative Nikolay Lipskiy, MD, DrPH, Co-Lead September,
HIT Standards Committee Identifying Implementation Specifications & Gaps LeRoy Jones – Program Manager Healthcare Information Technology Standards Panel.
+ Monday, June 1, OLPC (United Kingdom)
The Global Standards Management Process (GSMP) Robert Bersani GS1 Vice President Global Standards Development.
Case Study SummaryChallenges Magellan delivers innovative GPS technology for vehicle navigation, outdoor recreation, iPhones, and GIS. With rising demand.
RUP Deployment RUP Deployment Workflow
JRA1.4 Models for implementing Attribute Providers and Token Translation Services Andrea Biancini.
Unit-5 Introduction to IS/ISO 9004:2000 – quality management systems – guidelines for performance improvements. Presented by N.Vigneshwari.
Strategic Priorities for DDI Spring 2013 Mary Vardigan Director, DDI Alliance METIS -- Geneva, Switzerland May 6, 2013.
Data Services Task Team WGISS-22 meeting Annapolis, the US, September 12th 2006 Shinobu Kawahito, JAXA/RESTEC.
Antilope Benelux Summit Delft – The Netherlands Questionnaire & Debate.
Impact Research 1 Enabling Decision Making Through Business Intelligence: Preview of Report.
Documentation Requirements for Hospital Accreditation -By Global Manager Group.
Info-Tech Research Group1 1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
COBIT. The Control Objectives for Information and related Technology (COBIT) A set of best practices (framework) for information technology (IT) management.
CMMI Certification - By Global Certification Consultancy.
ISO in Foodservice FOOD SERVICE FOOD SAFETY MANAGEMENT DR. BRIAN A NUMMER © 2014.
Microsoft Dynamics Sure Step Rana Abdul Rahman. What we will cover What is Sure Step? Benefits of Sure Step methodology Project phases as per sure step.
The Federal E-Authentication Initiative David Temoshok Director, Identity Policy GSA Office of Governmentwide Policy February 12, 2004 The E-Authentication.
Development Process Based on Chapter 5 Bennett, McRobb and Farmer
Process 4 Hours.
SQA project process standards IEEE software engineering standards
Timeline – Standards & Requirements
The Five Secrets of Project Scheduling A PMO Approach
Chapter 10 Software Quality Assurance& Test Plan Software Testing
SQA project process standards IEEE software engineering standards
Project Charter I want to design a project
CSC 480 Software Engineering
Illustration of Beta 11.
Introduction to Project Management
Web Service Security support in the SSE Toolbox
ESS.VIP.SERV Shared Services
GSMP – Global Standards Development Process
SDLC (Software Development Life Cycle) Role Play
Presentation transcript:

© 2008 GS1 1 Certification Framework Certification Framework Document Operations Manual Team 7: Deliverables

© 2008 GS1 Team 7: Deliverables 2 Requirements Conformance Requirements Test System Developed Beta Testing Certification Testing Launched Test Suites / Test Plan Developed Prototype Testing Ratified Standard Certification Framework  Alignment among various GS1 Certification areas (EPC, GDSN, AIDC, other)  Develop High Level Process - defined dependencies and ensure conformance requirements development are included (covered) in new process  Ensure Consistent use of Terminology (Certification, Accreditation, Audit, Verification, etc) For Illustration Purpose only Operations Manual  Workflow and membership for various GS1 Certification areas

© 2008 GS1 Team 7: Benefits/Value of Certification 3 Benefits  Ensure consistency in actual program on operations side  Enable harmonized framework  Ensure consistency across different technological standards with regards to certification  Ensure quality Value of Certification  Ensure interoperability across user communities  Facilitate deployments  High quality of implementations for products based on GS1 standards from software to hardware to applications

© 2008 GS1 Team 7: MO Role 4  Gain better understanding of certification program  How the program may be applicable in their region  How this can increase adoption  Actual role may vary among the different certification areas – will be defined and detailed out in the operations manual among with roles of other parties