Vermont Electricity Overview -- Richard Watts, June 9, 2004.

Slides:



Advertisements
Similar presentations
Electricity Industry The Potential Effect of Locational Marginal Pricing on Renewable Resources for Environmental Issues in Energy NECPUC Annual Symposium.
Advertisements

1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
Lisa Grow Vice President, Delivery Engineering & Operations Our Energy Future.
Procuring Our Way to Compliance IEP 27 th Annual Meeting September 23, 2008 Fong Wan, PG&E.
California GHG policy and implications for the power sector APEX Sydney Conference October 13, 2008 Anjali Sheffrin, PhD.
RGGI Leakage Workshop Presentation June 15, 2006 Stephen J. Rourke Vice President, System Planning ISO New England.
VT Department of Forests, Parks & Recreation Wood Energy in Vermont January 2005 VT Department of Forests, Parks & Recreation.
Northwest Power and Conservation Council Effects of Alternative Scenarios on Sixth Power Plan Northwest Power and Conservation Council Whitefish, MT June.
Ontario Electricity Industry : Planning Ahead Amir Shalaby VP, Power System Planning Ontario Power Authority Presentation to Canadian Nuclear Society The.
Overview Vermont Power Supply University of Vermont January 27, 2004 Dave Lamont Vermont Public Service Department.
Power Supply Options for Connecticut’s Energy Future Connecticut Energy Advisory Board Scott Davido President, Northeast Region NRG Energy, Inc. December.
Renewable Energy Vermont Vermont Perspectives, Activities, and Plans September 21, 2005 J. Riley Allen Vermont Department of Public Service.
Strategic Thinking About Vermont’s Electricity Future Michael H. Dworkin, Chairman Vermont Public Service Board University of Vermont April 20, 2004.
Plug-In Electric Vehicles… What has to happen on the other side of the outlet? MARC Conf. Session 4 – Electric Cars: Can we charge our way to a carbon-free.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Copenhagen 29 June Energy and climate outlook: Renewables in a world and European perspective Peter Russ.
SEPTEMBER 29, 2014 | CONCORD, NH Eric Johnson DIRECTOR, EXTERNAL AFFAIRS New Hampshire Energy Summit Lessons Learned from Winter 2014 and How the ISO Is.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
A Regulatory Framework for Energy Intensive Industries within the EU Berlin 30 November 2012 Chris Lenon – Green Tax Group BE.
Policy Research Shop Support for the Policy Research Shop is provided by the Fund for the Improvement of Postsecondary Education, U.S. Department of Education.
VINCE GRIFFIN VICE PRESIDENT ENVIRONMENTAL & ENERGY POLICY INDIANA CHAMBER OF COMMERCE.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
Results of Geothermal Power Survey of Electric G&T Cooperatives Robert Putnam, CH2M HILL Bob Gibson, NRECA Steve Lindenberg, Lindenberg Consulting.
Desperate Buyers in a Sellers Market Lessons For Vermont in a Carbon Constrained World Michael Dworkin, Professor of Law & Director, Institute for Energy.
MIDWEST ENERGY OUTLOOK THE ROLE OF COMPETITIVE POWER SUPPLIERS ENERGY MARKETS IN TURMOIL May 17, 2001 Freddi L. Greenberg.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Electric Energy Resources Chris Nelson Commissioner SD Public Utilities Commission October 2012.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
NARUC Energy Regulatory Partnership Program The Georgian National Energy Regulatory Commission and The Vermont Public Service Board by John D. Burke, Board.
World Energy Outlook 2006 Scenarios for the World and the European Union Presentation to European Wind Energy Conference Milan, Italy, 7-10 May 2007.
A Brave New World Cathy Woollums, SVP, Environmental and Chief Environmental Counsel NASUCA Mid-Year Meeting – June 2, 2014.
Balanced Portfolio for Reliable Electricity System YES Inc. Brief Assessment.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Geothermal Energy Portfolio from a Utility Perspective Marilynn Semro Seattle City Light May 11, 2005 How do you know what you need and is Geothermal “it”?
ENERGY STAR® WORKSHOP Riffe Center Columbus, Ohio April 26, 2007.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Monterey Plaza Hotel October 8-10, 2007
Smart Grid Schneider Electric Javier Orellana
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
Utility Responsibility to Maintaining Load Reliability Resource Adequacy Forum Technical Committee Meeting June 20, 2007.
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
Vermont Power Supply September 30, 2005 Dave Lamont Vermont Department of Public Service.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Vermont Yankee- The Last Yankee Standing Bev Good Entergy Nuclear- Sr. Project Manager Boston, MA July 29,
Northwest Power and Conservation Council The Role of Electric Energy Efficiency in Reducing PNW Carbon Emissions Tom Eckman Manager, Conservation Resources.
World Energy and Environmental Outlook to 2030
Kenya’s INDC: Actions in the Energy Sector
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
At-Risk Nuclear Plants: Challenges and Opportunities
Draft 2013 Energy-Efficiency Forecast
Key Findings and Resource Strategy
Integrated Resource Planning and Load Flexibility Analysis
NS4960 Spring Term, 2018 China: Expanded Renewables
New England Resource Adequacy
Strategic Energy Plan.
The Role of Hydro-Québec in New England Electric Markets The New England Electricity Restructuring Roundtable June 14, 2013 Stephen Molodetz, Vice.
Creating Benefits for New England: Putting the Pieces Together
Wholesale Electricity Costs
Creating Benefits for New England: Putting the Pieces Together
Presentation transcript:

Vermont Electricity Overview -- Richard Watts, June 9, 2004

2001 Electric Use

Vermont’s Electric Needs 1,000 MW peak demand now –Growing at about 2 MW per year since 1992; 100 MW , But 550 MW will need to be replaced in timeframe!! Current Sources –Vermont Yankee - about 30% demand and 36% energy Contract Expires 2012 –Hydro Quebec - about 30% demand and 32% energy Contract expires from 2012 to 2020, most expiring in 2015 –Independent Power Producers - about 10% demand and 5% energy (all renewable) Contracts expire 2008 to Other sources - about 30% of demand and 27% of energy

Vermont Gross Electric Energy by Source

Slow growth in annual peak, summer peak rising faster

Load Forecast

Positive steps: Since 1984 peak demand in VT has risen by ~125 MW, all met by new, in-state renewables 40 MW - small hydro, IPP, WEC, GMP 73 MW - McNeil and Ryegate wood chip plants 6 MW - Searsburg wind project small landfill gas projects – Brattleboro and Burlington Vermont utilities’ energy efficiency efforts, including Efficiency Vermont, have saved over 80 MW of demand Bottom line – current portfolio mix is very high in renewables, and America’s lowest in CO2 BUT – VT still imports a large % of our electricity

 VT Yankee  Shift to Fossil Plants  New Cogen and Distributed Gen in VT  Efficiency and Load Management  Ride the Spot Market  Add Renewables  Imported Hydro (HQ or Lower Churchill)  Connecticut and Deerfield River Dams  Blended Balance Major Resource Options Where Can We Go From Here? Different Solutions May be Viewed Differently by Each Utility

Other Resource Alternatives Transmission –Exports the generation siting issue –Creates a new siting issue Demand Side Resources –Energy efficiency –Demand response –Customer-sited generation Can local resources avoid power lines?

Reliance on Existing Paradigm Big power lines Big plants (300) Generation meets Load -- 1/60 th of Second

Vermont Reliability Problem  Electric Demand is Increasing - Vermont’s Summer Peak Demand has increased 9% since Vermont double peaking (summer ~ winter)  Existing Transmission System is at Capacity - No major additions since early 1980’s (i.e., new lines); -90% of power used on a peak day moves over the transmission system; -Equipment failure a major concern (e.g., Plattsburgh PAR, Highgate Converter); -Recent investment ($32 M/4 years) has extracted available capacity without building new lines.  No New Power Plants in Vermont -~ 10,000 MW of New Power Plants in New England (25,000 MW peak)  Compliance with Regional Reliability Criteria (e.g., NPCC/Nepool/ISO-NE) a major concern - ISO New England identified “severe reliability problems” in Vermont -Problems could affect large portions of Vermont

Solving the Reliability Problem  Reduce Electric Demand  Energy Efficiency/ Demand Response Programs  Cost & rate of acquisition questions.  Build power plants in NW VT  Additional infrastructure needed;  Cost of fuel (natural gas) a concern;  New England generation market saturated;  Vermont power supply portfolio adequate;  Permitting challenges—air emissions, noise, & cost.  Expand transmission system to increase system capacity  Requires extensive upgrades-aesthetic & land use impacts.  Combination of the all three

NRP Information  Schedule is critical  Need to address reliability problem today;  The cost of the NRP will be shared with the rest of New England if it is in service by December of 2007;  Regulatory approval by spring 2004 very helpful.  NRP Cost estimated at $128 million  Pool Transmission Facilities: $121.2(4.35) = $5.3 M  Non PTF = $6.7 M  VT Total$12.0 M  Supplemental adds $.7M to PTF, $.4M to non PTF  Project supported by :  Associated Industries of Vermont, Addison County Chamber of Commerce, Addison County Economic Development Corporation, Greater Burlington Investment Corporation, IBM, Lake Champlain Chamber of Commerce, Renewable Energy Vermont, Vermont Area Snow Travelers, Vermont Chamber of Commerce, & others

Efficiency is Cheaper

Natural Gas Prices Have Increased

Who Decides?

Why Citizen Participation? Instrumental Normative Substantive

Now is the time to have a conversation about where we’re going to generate our power.” (1/26/03 BFP)

Does Participation Reduce Conflict?

DPS Energy Plan Rigorous Decision Analysis Techniques The plan does not mention a role for the public in planning Vermont’s energy future. There is little or no acknowledgement in the plan that the public may have ideas or knowledge to communicate. A word search through the 2004 Draft Energy plan reveals that nowhere in this document are the terms “public involvement” or “citizen participation” used. No public participation strategies are offered, but an entire chapter is devoted to explaining an expert-managed process for decision-making. The only role mentioned for the public is on the last page of the plan where public meetings are referenced in the context of legal requirements for these meetings.

Mechanisms for Participation Public Meetings Public Hearings Advisory Groups Focus groups Citizen Juries

Deliberative Face-to-face conversation Make sense together

Experts Equal Access to experts Experts not privileged Technical Issues to Hide Value Issues

Is this Participation?

Conclusions Looking at the state, Vermont needs to make a major commitment for new power sources before 2015 Some smaller utilities have more immediate needs There needs to be a public process, a “statewide” conversation about how we get there.