General Conditions of the Contract for Construction Articles 19 through 24 October 6, 2008.

Slides:



Advertisements
Similar presentations
Safety on the Job Module #3 Prepared by Dr. Randy R. Rapp July 2005.
Advertisements

COMPANY MAINTENANCE MANUAL
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
Barhale Procedure for Site Establishment
Introduction The Consumer Guarantees Act (CGA) sets out guarantees that goods and services must meet when sold by someone in trade - that is, a retailer.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Transport Canada Submission to the Nunavut Impact Review Board Respecting the Meadowbank Gold Project March 2006.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
IMPORTANT READ CAREFULLY BEFORE USING THIS PRODUCT LICENSE AGREEMENT AND LIMITED WARRANTY BY INSTALLING OR USING THE SOFTWARE, FILES OR OTHER ELECTRONIC.
All Star Home Inspections Services By Chuck Tolbert Member of NACHI, ASHI, SC Lis # 2300.
Determining Responsive Bids and Responsible Bidders and Offerors Presenter: J. Peter Stamps, CPPO, VCO VA Dept of General Services.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Darren R. Krattli Eisenhower Carlson PLLC Mechanics’ and Materialmen’s Liens: Start to Finish RCW Main: (253) Direct: (253)
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
© 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
ARCH 330 Contract Documents to Specifications. Contract Documents: Are defined as the legally enforceable requirements that become part of the contract.
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
ESTIMATING By Laith Jacob.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Design & Layout of Foodservice Facilities
Contract price & payment
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Mechanic’s Lien DENIZE & SARAH. WHAT IS A MECHANIC’S LIEN  A Mechanic’s Lien is a security interest in the title to property for the benefit of those.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Module 7: Construction Phase
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
Condominium and New Home Warranties and Rights of Action June 27, 2012 Raymond Daniel Burke Ober|Kaler 100 Light Street | Baltimore, Maryland.
Construction Defect Mitigation Construction Cost Recovery Construction Litigation Consultants, LLC Jerry Peck Slide 1 of 12 slides / Total.
Facilities Institute July , 2012 Houston, Texas CONSTRUCTION AND RENOVATION WARRANTY/GUARANTEE What Do You Get And When Does It.
CONSTRUCTION ADMINISTRATION Project Closeout Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
Warranties Review Questions. 1.The person who becomes secondarily liable for another’s debt or performance is called the: a.Guarantee b.Warrantor c.Guarantor.
TENDERING PROCEDURE IT- 3927/EN
Construction Why Construction The Construction Which are closely related to swimmingly project completion Which Mean: every thing related to Project participants.
Reasonable is in Eye of the Beholder Vendor, Customer, & Litigator Perspectives on Software License Provisions Aaron Brodsky Greg Leibold Peter Gergely.
Florida Department of TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION THIRD PARTY DAMAGES Rudy Powell, P.E., State Construction Engineer 2014 FTBA.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CONSTRUCTION CONTRACTS DOCUEMENTS
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
Chapter 15 Payments. Payments typically made monthly. Retainage typically withheld (5% - 10%) Project payment: –series of periodic payments –single final.
§ Buyer's Rights on Improper Delivery. Subject to the provisions of this Article on breach in installment contracts (Section 2-612) and unless otherwise.
Architectural Control Committee Heritage Hills 3195 Heritage Hills Blvd. Clermont, Florida PH: Fax Community Name: Heritage.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
CONDITIONSANDWARRANTIES. STIPULATION STIPULATION A stipulation in a contract of sale with reference to goods which are the subject thereof may be a condition.
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
Service Quality Innovation Trust Safety The Samet Way “Managing the Company Cash Position” Accounts Payable (AP) should always be less than Accounts Receivable.
Lab Safety MYCAERT INC.. What is Safety? Safety is preventing injury and loss. Injury and loss may be inflicted on people or their property.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
CONTINUATION SA REPORT NI TAHNEE. ELEMENTS OF CONTRACTS.
Differing & Unforeseen Conditions Differing Site Conditions- actual conditions differ from the representation made in the contract documents (MSP airport)
P ART A - S TANDARDS A NNUAL ‘A’ B OOK R EVIEW  Conducted by City of Toledo -Division of Engineering Services  Review Typically performed in Q4.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Presented by: Tommy Mays, Legal Counsel Baptist Health Medical Center Health Contracting 101.
Warranties Review Questions.
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
First Article Test (FAT) / Production Lot Test (PLT)
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Find the Problems with the Provisions May 11, 2016 Presented By:
Construction Contract Administration
Presentation transcript:

General Conditions of the Contract for Construction Articles 19 through 24 October 6, 2008

Article 19 Protection of the Work, Persons and Property 19.5The Contractor shall designate a qualified and responsible on site staff person, whose duty shall be the prevention of accidents. The name and position of the designated person shall be reported to the Owner by the Contractor at the commencement of the Contract. 19.5The Contractor shall designate a qualified and responsible on site staff person, whose duty shall be the prevention of accidents. The name and position of the designated person shall be reported to the Owner by the Contractor at the commencement of the Contract.

Article 19 Protection of the Work, Persons and Property 19.8The Contractor shall remove all snow and ice as may be required for access to the site and proper protection and prosecution of the Work. 19.8The Contractor shall remove all snow and ice as may be required for access to the site and proper protection and prosecution of the Work.

Article 19 Protection of the Work, Persons and Property During cold weather the Contractor shall protect all work from damage. If low temperature makes it impossible to continue operations safely in spite of cold weather precautions, the Contractor may cease Work upon the written approval of the Commissioner During cold weather the Contractor shall protect all work from damage. If low temperature makes it impossible to continue operations safely in spite of cold weather precautions, the Contractor may cease Work upon the written approval of the Commissioner.

Can you identify the Cowboy on the next slide who insists we understand and enforce our General Conditions? (and that’s no Bull)

Article 20 Temporary Utilities 20.1Unless expressly provided for otherwise in the Contract Documents, the Contractor shall include in the proposed contract bid price as stated on the Bid Proposal Form the costs of all temporary utilities required for Project completion and protection of the Work. Said temporary utilities include but are not limited to lighting, heating, cooling, electrical power, water, telephone, sanitary facilities, and potable water. 20.1Unless expressly provided for otherwise in the Contract Documents, the Contractor shall include in the proposed contract bid price as stated on the Bid Proposal Form the costs of all temporary utilities required for Project completion and protection of the Work. Said temporary utilities include but are not limited to lighting, heating, cooling, electrical power, water, telephone, sanitary facilities, and potable water.

Can you identify this cute, curly-haired organizer who (now has straight hair) is just thrilled about our General Conditions? Can you identify this cute, curly-haired organizer who (now has straight hair) is just thrilled about our General Conditions?

Article 21 Corrections to the Work 21.5No extension of time will be given to the Contractor for correction of rejected or unacceptable Work. All significant punchlist Work shall be completed before Substantial Completion is determined. The remaining minor punchlist Work, as determined by the Commissioner, shall be completed within 60 Days of established Substantial Completion date. 21.5No extension of time will be given to the Contractor for correction of rejected or unacceptable Work. All significant punchlist Work shall be completed before Substantial Completion is determined. The remaining minor punchlist Work, as determined by the Commissioner, shall be completed within 60 Days of established Substantial Completion date.

Can you identify this handsome one who runs for cover when General Conditions are mentioned? Can you identify this handsome one who runs for cover when General Conditions are mentioned? Oh, what will become of him? Oh, what will become of him?

Article 22 Guarantees and Warrantees 22.1Unless expressly provided for otherwise in the Contract Documents, the Contractor shall provide a Warranty on the Work for an 18-Month period from the date of Substantial Completion. The Contractor shall warrant that the equipment, materials and workmanship are of good quality and new, unless permitted elsewhere by the Contract Documents, and that the Work shall be free from defects not inherent in the quality required or permitted and that the Work conforms to the Contract Documents. 22.1Unless expressly provided for otherwise in the Contract Documents, the Contractor shall provide a Warranty on the Work for an 18-Month period from the date of Substantial Completion. The Contractor shall warrant that the equipment, materials and workmanship are of good quality and new, unless permitted elsewhere by the Contract Documents, and that the Work shall be free from defects not inherent in the quality required or permitted and that the Work conforms to the Contract Documents.

Article 22 Guarantees and Warrantees (cont.) 22.2Disclaimers and limitations from manufactures, Subcontractors, suppliers or installers to the Contractor shall not relieve the Contractor of the Warranty on the Work. The Contract Documents detail the related damages, reinstatement of Warranty, replacement cost and Owner’s recourse. 22.2Disclaimers and limitations from manufactures, Subcontractors, suppliers or installers to the Contractor shall not relieve the Contractor of the Warranty on the Work. The Contract Documents detail the related damages, reinstatement of Warranty, replacement cost and Owner’s recourse.

Can you identify this Administer of our General Conditions? Can you identify this Administer of our General Conditions? Do you think his harey friend gets it? Do you think his harey friend gets it?

Article 23 Cutting, Fitting, Patching, and Digging 23.1The Contractor will perform or will cause the Subcontractors to perform all cutting, fitting or patching of the portion(s) of the Work that may be required to make the several parts thereof joined and coordinated in a manner satisfactory to the Commissioner and in accordance with the Plans and Specifications. 23.1The Contractor will perform or will cause the Subcontractors to perform all cutting, fitting or patching of the portion(s) of the Work that may be required to make the several parts thereof joined and coordinated in a manner satisfactory to the Commissioner and in accordance with the Plans and Specifications.

Can you identify this darling little girl who hasn’t changed a bit? Can you identify this darling little girl who hasn’t changed a bit?

Article 24 Cleaning up 24.2Prior to Acceptance of the Work, the Contractor shall remove from and about the site of the Work, all rubbish and all temporary structures, tools, scaffolding and surplus materials, supplies and equipment which may have been used in the performance of the Work. If the Commissioner in his sole discretion determines that the Contractor has failed to clean the work site, the Owner may remove the rubbish and charge the cost of such removal to the Contractor. A deduct Change Order will be issued by the Owner to recover such cost. 24.2Prior to Acceptance of the Work, the Contractor shall remove from and about the site of the Work, all rubbish and all temporary structures, tools, scaffolding and surplus materials, supplies and equipment which may have been used in the performance of the Work. If the Commissioner in his sole discretion determines that the Contractor has failed to clean the work site, the Owner may remove the rubbish and charge the cost of such removal to the Contractor. A deduct Change Order will be issued by the Owner to recover such cost.

Can you identify this young Architect behind the rose- colored glasses? Can you identify this young Architect behind the rose- colored glasses?

???Questions???