LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician.

Slides:



Advertisements
Similar presentations
Planning, Budgeting, Acquisition & Management of Capital Assets Capital programming is an integrated process within an agency for planning, budgeting,
Advertisements

Bernard Price Certified Professional Logistician Supply Management & Model Theory.
Simulating Ground Support Capability for NASAs Reusable Launch Vehicle Program Kathryn E. Caggiano Peter L. Jackson John A. Muckstadt Cornell University.

1 Follow Up Items  What are Unbalanced Bids?  What are Best Value Contracts?  Analysis of Contract Approval Limits.
Defense Contractor Financial Management presented to EPMC by Dr. Tony Perino.
ITIL: Service Transition
Apache Focused Recapitalization Program National Defense Industrial Association (NDIA) Systems Engineering Conference San Diego, California October 20-23,
22 Nov 05 OSD TLCSM Memo Containing PBL Performance Metrics Operational Availability Mission Reliability Logistics Response Time Total Life Cycle Cost.
Lancaster County Replacement Facility Development Strategy Presented by: CGL Capital Solutions May 19, 2011 A World of Solutions.
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
Moving from Analysis to Design
1 Systems Engineering in Systems Deployment and Retirement Presented to INCOSE by the Minneapolis – St. Paul Chapter of SOLE – The International Society.
Project Estimation Describe project scope, alternatives, feasibility.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Chapter 5: Supply Chain Performance Measurement and Financial Analysis
Introduction to Cost management
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
Managing a Training Program Why train? Who will attend the training? What are the learning objectives? Strategies? Coverage? How will the training program.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Cost 101 for Life Cycle Logisticians R&D Cost: program costs primarily associated with the development of a new or improved capability to the point where.
Economic Analysis: Applications to Work Zones March 25, 2004.
DEPOT AND ITEM LEVEL BUSINESS CASE ANALYSIS (BCA) & TOOL Bernard Price Certified Professional Logistician.
Leadership in Engineering
Evaluating Investments in Information Technology Shannon Crump December 9, 2002 ISM 6021.
1 Total Ownership Cost (TOC) and Cost as an Independent Variable (CAIV) Dr. Jeffrey Beach Naval Surface Warfare Center Carderock Division; Survivability,
Budgets: Uses in Farm Management
© 04/08/20011 Logistics Systems Engineering System Cost Analysis NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
AMERICA’S ARMY: THE STRENGTH OF THE NATION Mort Anvari 1 Cost Risk and Uncertainty Analysis MORS Special Meeting | September.
Government Procurement Simulation (GPSim) Overview.
RELATIONSHIPS OF RELIABILITY, AVAILABILITY & MAINTAINABILITY (RAM) TO OPERATIONAL READINESS & SUPPORTABILITY Bernard Price Certified Professional Logistician.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
Optimizing NASA IV&V Benefits Using Simulation Grant Number: NAG David M. Raffo, Ph.D College of Engineering and Computer Science School of Business.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
INTEGRATING RELIABILITY, AVAILABILITY, MAINTAINABILITY (RAM) AND SUPPORTABILITY IN REQUIREMENTS Bernard Price Certified Professional Logistician ACHIEVING.
Cost Management.
CAMELOT Coordination Analysis Motivation Execution Logistics Tracking.
BERNARD PRICE Certified Professional Logistician Supportability Optimization to Achieve Availability Goals in Acquisitions.
Quantity Discount Economic Order Quantity (EOQ) Analysis Tools Bernard Price Certified Professional Logistician.
Information Systems Dr. Ken Cosh Lecture 9.
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
Life Cycle Costing By Rajat Shuvro Bakshi Formerly Professor of Strategic Management and International Business Indian Institute of Foreign Trade, Management.
1 ME Spring 2015 Systems Engineering, Part II Session 8 5 February 2015 Mr. Larry Hopp, CPL © Copyright 2013.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
Evaluation. What is important??? Cost Quality Delivery Supplier Expertise Financial Stability Coverage Product Offerings Do you intend to negotiate?
1 OF 17 INFORMATION TECHNOLOGY CAPITAL PLANNING FOR YOUR ENTERPRISE Steven Carpenter 14 October 2006.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
Global Sourcing Strategies to Achieve Long-Term Success
ITIL: Service Transition
Project Cost Management
Parts Management Agreements
Strategic Information Systems Planning
Chap 6 MAINTENANCE & LIFE CYCLE COST
Fort Stanwix National Monument Energy Audit Contract
BERNARD PRICE Certified Professional Logistician
Initiating systems development
Cost estimation and budgeting
Certified Professional Logistician
Supply Management & Model Theory Certified Professional Logistician
Enterprise Content Management Owners Representative Contract Approval
BUSINESS CASE ANALYSIS (BCA) & TOOL Certified Professional Logistician
22 Nov 05 OSD TLCSM Memo Containing PBL Performance Metrics
 1. Go to the following address on the Internet:
By: David Hoang Martin Hoffman
CAMELOT Coordination Analysis Motivation Execution Logistics Tracking
OmegaPS Users’ Group Meeting OUGM19
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

LIFE CYCLE COST (LCC) REDUCTION FROM RAM AND SUPPORTABILITY ANALYSES IN ACQUISITIONS Bernard Price Certified Professional Logistician

Notional System LCC Overview PRODUCTION OPERATION & SUPPORT Cumulative Percent LIFE CYCLE COST (LCC) DETERMINATION APPROX 90% OF LCC DETERMINED ACTUAL FUNDS SPENT APPROX 10% OF TOTAL COST AB Milestones C

 Cross Referenced to DA LCC Elements OMA OPA MPA RDTE “It’s all green” 1.09, 2.02, 2.05, 4.01, 5.01, Total Ownership Cost Categories Identified Logistics Costs & Non-Logistics Costs Regardless of Fund Type

Development Engineering Producibility Engineering & Planning Development Tooling Prototype Manufacturing Systems Engineering & Project Management System Test & Evaluation Data/Reports Development Facilities Software Development Non-Recurring Production Recurring Production Production Engineering Changes Other Development Costs Other Production Costs Military Construction Non-Logistics Cost Categories Non-Logistics Cost Categories (Potential Investment Cost Areas)

Logistics Cost Categories Logistics Cost Categories (Initial Costs - Red & Recurring Costs - Black) Operators Energy (POL & Batteries) Field Support Repair Labor Contractor Logistics Support Warranty Costs Scheduled Maintenance /Overhaul Initial Provisioning Replenishment Spares Inventory Holding Costs Support Equipment Test Program Sets System Specific Training Training Materials Post Production Software Support Technical Documentation Transportation Integrated Material Management Post Production Systems Engineering/Project Management System Hardware Changes Facilities/Sites Activation System Specific Base Operations Lease Operations & Maintenance Demilitarization/Disposal Industrial Readiness

Supportability Costs Impacted by RAM Warranty Costs Level of Repair Analysis: Organic Repair Costs Contractor Logistics Support Costs Initial Provisioning of Spares & Repair Parts Replenishment of Spares & Repair Parts Inventory Holding Costs of Spares Transportation Costs for Forward & Retrograde Shipments Source of Repair Analysis: Support Equipment – Common & System Specific Test Program Sets Technical Documentation for Repairs

Best Value Analysis – Rates & Weights Multiple Factors to Evaluate the Benefits & Cost of Each Alternative (Source Selections & Pre-MS B) Logistics Support Optimization Analyses – Lowest Net Present Value Total Cost among Support Alternatives to Achieve the Same Ao (Pre-MS C) Economic Analysis - Evaluates the Return on Investment of an Alternative to Status Quo (After Design Frozen & Level of Repair Established) Types of Analyses to Support Decisions

ROI = Net Present Value Savings of Improvement / Net Investment Cost for Improvement Net Present Value Savings from Recurring Cost Differences of Improvement vs. the Status Quo Net Investment Costs covers Improvement Initial Costs less any Remaining Status Quo Initial Costs Alternatives with the Highest ROI are typically worth funding the Improvement Investment Costs Return on Investment (ROI)

Reasons for Estimating Life Cycle Costs (LCC) Design Tradeoffs Yield LCC Differences that Aids Decision Making Decisions Made Early Drive Future Supportability and Support Costs Project Managed Acquisition Programs Require Cost Estimates for Financial Planning & Budgeting Quantifying LCC Helps to Identify Drivers If RAM LCC impacts are measured, LCC can be managed and reduced

Army LCC Management Models to be Discussed COMPASS* LOGSA Computerized Optimization Model for Predicting & Analyzing Support Structures ACE IT* DASA(CE) Automated Cost Estimating Integrated Tools LCET* CE LCMC Logistics Cost Estimating Tool (Includes Time Phased COMPASS) * TOOLS ARE LINKED FOR INTEGRATED LCC ESTIMATING

ACE IT Usefulness Integrates Cost Estimates or Data From Other Computer Programs Often Used for Program Office Estimates & LCC Estimates Provides Credible Estimates for Time Phased Non-Logistics Acquisition Costs

LCET Model Usefulness More Credible Logistics Costs in LCC Estimates Time-Phased COMPASS Module Results Yield Highest Fidelity Support Cost Estimates Relates Item Reliability to Readiness & Support Costs Adjusts Results for Worth of Warranty Logistics Cost Spreadsheet Module Covers Macro-Level Logistics Costs w/o Item Level Reliability Non-COMPASS Logistics Costs After Items Known Merges Multiple Runs of Different Time Frames Links COMPASS & ACE IT to Permit Concurrent Supportability Optimization & LCC Estimation

Logistics Costs Coverage Time Phased COMPASS Covers 10 of 25 Logistics Cost Categories With More Fidelity Than the Logistics Cost Spreadsheet Module

What Each Model in Integrated Tool Set Determines COMPASS - Optimizes Viable Support Concepts to Ao Least Cost Initial Provisioning 2-Level vs. 3-Level Maintenance Return LRU vs. SRU Organic vs. Contractor Repair vs. Throwaway Time Phased COMPASS - Annual COMPASS Costs LCET Spreadsheet - Adds in Other Logistics Costs ACEIT – LCC Tool Adds in Non-Logistics Costs Optimizes Supportability & Computes LCC Concurrently

N/ARed GreenYellow N/A Integrated/Linked Models ACEIT COMPASS LCET Supportability Analysis Green Logistics Cost Estimating Green Non-Logistics Cost Estimating N/A Green* Improving Supportability Analysis & LCC Estimating Concurrently

Acquisition Policies Supported by Integrated Tools DoD Policies: Perform Design & Supportability Tradeoffs to LCC Perform Supportability Analysis Integral to Systems Engineering Aid Performance Based Logistics Implementation for Product Support Army Policies: Manage TOC Reduction Evaluate TOC as a Factor in Source Selection Makes Supportability Co-Equal to Cost, Schedule & Performance

Offeror A Offeror B Contract Cost$25M$20M Technical Past Performance Product Support Source Selection Example Is “Outstanding” Product Support Worth $5M?

Offeror A Offeror B TOC $50M$60M Technical Past Performance Product Support Is “Outstanding” Product Support Worth $5M? Yes! Source Selection Example

Easy For Bidders/Contractor Can Be Used Over Life Cycle Common Baseline Encourages Meeting Modeling Objectives Ease Of Evaluation Proven/Validated Technique Govt. Needs To Validate/Understand Prolongs Evaluations Lack Source Selection Common Baseline More Upfront Work for Bidder/Contractor Chance of Initial User Error Everybody Uses Their Own Model Use Govt. Selected Model AdvantagesDisadvantages Source Selection Modeling Alternatives

Provides a Common Evaluation Baseline among Bidders Expedites Evaluation by Government After Data or Analyses are Obtained Improves Government/Industry Teaming with Common Analyses Permits Contractor to Determine an Optimum Support Effectiveness/Logistics Chain Structure & LCC Baseline Permits Contractor to Evaluate the Impact of Proposed Changes to a LCC Baseline Reasons Contractors Should Use Integrated Tools in Acquisitions

Data Required to Analyze TOC Appropriate Data is Needed to estimate Government & Contractor Responsible Costs Data Depends on Proposed Contractor Support When contractor fixes end items, only end item level data needed When Govt fixes end items & Contractor fixes LRUs, need to know how often LRUs are removed and costs for LRU repair When Govt fixes LRUs with SRUs, need to know how often LRUs & SRUs are removed and costs for their repair or replacement

When A Tailored Spreadsheet Is A Good Evaluation Alternative Contractor Repaired End Item Small Number of Known TOC Driver LRUs that are Contractor Repaired Legacy End Item where Maintenance is Not a TOC Driver

Which Integrated Tool Combo to Use for TOC Evaluation ACEIT & LCET - In Development Prior to Knowing LRUs ACEIT, LCET & COMPASS – In Development or LRIP When LRUs Known & Government Repairs End Item LCET & COMPASS – In Production or Re- Procurement If Maintenance is a TOC Driver

Source Selection Plan Evaluating Total Ownership Costs TECHNICALTOC*PRAG SUBFACTOR MANAGEMENT SUBFACTOR GOVT COSTS CONTRACTOR COSTS COST ADJUSTMENTS TECHNICAL INPUT RISK FACTORS COST INPUT RISK FACTORS TOC REDUCTION PLAN DATA SHARING PLAN FACTORS CONTRACT COSTS/PRICES COST REALISM (if not Fixed Price) COST/PRICE * TOC EVALUATION RESULTS IN AN ESTIMATED AMOUNT OF DOLLARS

Costs that Tend to be Drivers in Many Systems Non-Logistics Costs: Software Development Recurring Production Cost Logistics Costs: Post Deployment Software Support Replenishment Spares Contractor Logistics Support - or - Organic Repair

Logistics Cost Drivers that Tend to Vary by System Systems with Platforms Operators System Specific Training Energy – POL Man-pack Equipment/ Some Sensors Energy - Batteries Low Reliability or High Operational Availability Initial Provisioning Inventory Holding Costs (Frequent Item Upgrades) Long Term, Failure Free Warranties Warranty Costs

Low Density, Highly Complex Equipment System Engineering/Program Management Integrated Material Management High Density, Highly Complex Systems System Specific Training Training Material Development & Maintenance Some Secure, Sensitive Systems Facilities/Site Activations System Specific Base Operations Logistics Cost Drivers that Tend to Vary by System

Source Selection Plan Evaluating Total Ownership Cost Drivers FACTORS TECHNICAL COST/PRICE PRAG MANAGEMENT SUBFACTOR CONTRACT COSTS/PRICES COST REALISM (if not Fixed Price) TOC REDUCTION PLAN DATA SHARING PLAN TOC DRIVER METRICS* TECHNICAL INPUT RISK FACTORS COST INPUT RISK FACTORS * TOC EVALUATION RESULTS IN AN ADJECTIVAL RATING FOR QUANTITATIVE THRESHOLDS

How Current Acquisition Practices Can Improve Analyze System Reliability and Operational Availability Requirements Use Government Ao Driven LCC Models for Best Value Decisions & Plan to Encourage Industry to Use Them Use TOC and/or Ao as an Evaluation Factor in Source Selection Provide Incentives to Industry for TOC Reduction Establish a Shared Data Environment

Influence of RAM and LCC Reduction on System Cost Effectiveness Product Effectiveness System Effectiveness Probability System is Available to Accomplish Mission (C) Support Design Product to Reduce Life Cycle Costs (Relates to A, B & C) System Cost Effectiveness Probability System Lasts Mission Without Failing (B) Probability System Performs Appropriately In Mission (A) Support Effectiveness Optimization (Relates to B & C) Cost Effectiveness Basically Contractor Responsibility Typically Government and Contractor Responsibility