© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 1 The Spearing Doctrine and Definitions of “Complete” Construction Documents Presented by.

Slides:



Advertisements
Similar presentations
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Advertisements

Construction Contracting
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Scope of Work Strategies & Solutions David A. Ericksen, Esq. Severson & Werson March 25, 2015.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.
Selecting Contractors and Architects Hiring Architects and Engineers in Missouri Dwight Dickinson, AIA Missouri Association of Rural Education PART 1.
Making GOOD Decisions Contractor-Engineer Conference Wisconsin Transportation Builders Association January 31, 2013 Richard Kyte D.B. Reinhart Institute.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
WASHINGTON STATE EMERGENCY WORKER PROGRAM State of Washington
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction Engineering 221 Drawings and Specifications.
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
What are the Main ARCHITECTURAL PLANS/ DOCUMENTS
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
About ACE Purpose of ACE ACE exists to represent its members’ interests to clients, both government and private sector, and stakeholder organisations,
Honoraria for Design Build Projects Methodology Assessment Matrix.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Chief Legal Counsel, OSFC
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
COFPAES Presentation on GSA Federal Supply Schedule/ Multiple Award Schedule Re: Architect-Engineer Services Brian Pallasch, CAE American Society of Civil.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Part 2 – The Law of Torts Chapter 6 – Special Tort Liabilities of Business Professionals Prepared by Michael Bozzo, Mohawk College © 2015 McGraw-Hill Ryerson.
BCN 4708 Fall 2008 Chapter 4 Drawings and Specifications.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Dunedin Enterprise Investment Trust PLC General Meeting – October 2013, Voting Analysis.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Selecting Contractors and Architects Hiring Architects and Engineers in Missouri Dwight Dickinson, AIA Missouri Association of Rural Educators PART 1.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Agency Construction Management :CM NOT AT-RISK
Understanding Fire Sprinkler Systems (c) Nothing in this Act shall be construed to prevent a fire sprinkler contractor licensed under the Fire Sprinkler.
Prepared by Douglas Peterson, University of Alberta 6-1 Part 2 – The Law of Torts Chapter 6 Special Tort Liabilities of Business Professionals.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
You passed the Bond or secured some funds What do we do now? 2014.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
BIDDING PRIVATE AND PUBLIC WORK Major Differences between Private and Public How to determine whether a project is Public or Private: "Who owns the dirt"
Position Statement on Sealed Truss Placement Diagrams for the State of California (including Los Angeles) Overview.
Police Department Authorization to enter into a Contract with LASD for Supplemental Law Enforcement Services for New Year’s Operations Pasadena Police.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
1 Ethical Lawyering Fall, 2006 Class 6. 2 MR 1.1 A lawyer shall provide competent representation to a client. Competent representation requires the legal.
CONSTRUCTION CHANGE DIRECTIVES UNDER THE NEW PUBLIC BID LAWS Speaker: STEVEN B. LOEB, Esq. BREAZEALE SACHSE & WILSON, LLP Tel: (225)
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
Bidding Requirements Review Questions.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Lines in the Sand: Where Does Design Stop and Construction Start?
Purchasing in the 21st Century
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
COST OF THE WORK: Tricks and Traps to Avoid in Contract Drafting
Right of Way Certification
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 1 The Spearing Doctrine and Definitions of “Complete” Construction Documents Presented by Barbara R. Gadbois, Esq. of GIBBS, GIDEN, LOCHER,TURNER & SENET LLP 2029 Century Park East 34th Floor Los Angeles, California (310) Burbank, California October 15, 2009

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 2 Owner Warranty of Plans & Specifications United States v. Spearin, 248 U.S. 132 (1918) Owner impliedly warrants that the project can be constructed from the plans and specifications.

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 3 Public Works Limitations on Transfer of Risk §1104. Responsibility for completeness and accuracy of plans and specifications. No local public entity, charter city or charter county shall require a bidder to assume responsibility for the completeness and accuracy of architectural or engineering plans and specifications on public works projects, except on clearly designated design build projects. Nothing in this section shall be construed to prohibit a local public entity, charter county from requiring a bidder to review architectural or engineering plans and specifications prior to submission of a bid, and report any errors and omissions noted by the contractor to the architect or owner. The review by the contractor shall be confined to the contractor’s capacity as a contractor, and not as a licensed design professional.

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 4 Architect’s Standard of Care Professional Negligence Standard Absent express warranty, no promise that plans are defect-free or fit for intended use.

© 2006 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 5 Contractor’s Responsibility Build According to Plans and Specifications Within Contract Time and Contract Price

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 6 Owner-Architect Contract Provisions AIA B Construction Documents Submittals

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved CONSTRUCTION DOCUMENTS The Architect shall provide Construction Documents based on the approved Design Development Documents and updated budget for the Cost of the Work. The Construction Documents shall set forth in detail the requirements for construction of the Project. The Construction Documents shall include Drawings and Specifications that establish in detail the quality levels of materials and systems required for the Project. AIA DOCUMENT B

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 8 AIA DOCUMENT B

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 9 AGC DOCUMENT NO CONSTRUCTION DOCUMENTS Based on the approved Design Development Documents and updated estimate of the Cost of Construction and Project Schedule, the Architect/Engineer shall prepare, for the Owner’s review and approval and the approval of governmental authorities, including any revisions necessary to secure such approvals, Construction Documents setting forth in detail the quality levels of and the requirements for construction of the Project and consisting of drawings and specifications that comply with applicable codes, laws and regulations enacted at the time of their preparation at the location of the Project.

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 10 Standard of Care Provision Architect shall perform the services in accordance with the degree of skill and learning ordinarily possessed by architects in good standing in the community regularly engaged in the design of facilities similar in scope and magnitude to the Project and must apply that knowledge with the diligence ordinarily exercised by reputable architects under similar circumstances

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 11 Non-Standard Provisions Highest Professional Standard of Care State-of-the-Art Facilities Fiduciary Relationship of Trust and Confidence/Cost Effective Services Warranty/Guaranty Traps – Promotional Statements in Proposal to Owner

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 12 Owner-Contractor Contract Provisions AIA A The Contract Documents 1.1.3The Work 1.1.5The Drawings 1.1.6The Specifications 1.2.1Correlation and Intent of Contract Documents 3.2Review of Documents and Field Conditions Not Required to Provide Design Services

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 13 Architect’s Liability California Code of Civil Procedure § Certificate of Merit

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 14

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 15

© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 16