Canada-United States Transportation Border Working Group Garfield Dales Manager, Project Delivery Office Windsor Border Initiatives Implementation Group.

Slides:



Advertisements
Similar presentations
Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
Advertisements

July 15, 2008 – GB Work Session Discussion of Mayor Thomas E. Swisstack’s Priority List Recommendations.
BI-NATIONAL PARTNERSHIP STUDY Canada-U.S.-Ontario-Michigan Partnership Border Study.
Edmonton’s Anthony Henday Drive Unique Challenges Saskatchewan P3 Summit 2014 Regina, Saskatchewan September 9, 2014.
I-4 Ultimate with Lanes Project Central Florida 1 May 21, 2013.
1 Detroit River International Crossing (DRIC) New International Trade Crossing (NITC) Briefing for the Transportation Border Working Group November 8,
From – A Report of the Connecticut Regional Institute for the 21 st Century by Michael Gallis & Associates, 1999 (known as the “Gallis Report”) Knowledge.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
Los Angeles County Metropolitan Transportation Authority Douglas R. Failing, P.E. Executive Director, Highway Program Public Private Partnerships CTF Transportation.
1 Detroit River International Crossing (DRIC) New International Trade Crossing (NITC) Transportation Border Working Group April 24, 2013.
Designated by US DOT Publication of Draft PFN for Comments - Spring 2013 Initial Designation of the PFN – Fall 2013 National Freight Network Primary Freight.
Neighborhood Preservation and Revitalization Division Board of County Commissioners March 10, Neighborhood Improvement Plan.
Longmeadow Parkway Fox River Bridge Corridor
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Created by Steven WevodauSteven Wevodau Detroit River International Crossing Study June 29, 2009 Mohammed Alghurabi Senior Project Manager IRWA’s 55th.
Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007.
1 Transportation Border Working Group Calgary, Alberta October 21, 2004 Presented by: Kris Wisniewski Canada-U.S.-Ontario-Michigan Border Transportation.
1 ACCESS to QUALITY CULTURAL, RECREATIONAL, EDUCATIONAL and LEISURE OPPORTUNITIES Collaboratively encourages and supports opportunities to focus on the.
2004 Budget Presentation City Commission Budget Study Session July 2, 2003.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
Old Policy – which no one ever seem to have heard of.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Introduction to P3 Bootcamp
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Land Use Study for the Community of Winchester July 9, 2012.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Federal Government’s Role in Promoting Innovative Financing Northern Border Finance Workshop - May 16, 2007.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Ministry of Transportation Ontario Road Builder’s Association October 20, 2011 Central Region Highway Program.
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Jefferson Parkway Public Highway Authority Bidder Information Conference December 14, 2010.
ITS Georgia | June What is the role of ITS in the emerging public/private partnership transportation market in Georgia? ITS Georgia Monso_Julia.
North East Lincolnshire Council delivering change through partnership ( Physical Regeneration, Property and Technical Services Partnership) Planning in.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
Ottawa’s Light Rail Transit Project OLRT Update to Finance and Economic Development Committee March 2011.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Atlantic Innovation Fund Round VIII February 5, 2008.
Transportation Projects City Council Workshop May 14, 2013.
Orht I-5 North Coast Corridor Project CA Transportation Planning Conference – New Directions in Planning Integrating Resource and Infrastructure Plans.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
1 McMaster Innovation Park Executing on a Vision Presentation to the Kirkendall Neighbourhood January 10 th, 2008 Zach Douglas.
Rail Schemes and the PPP Model November Rail Schemes and the PPP Model  Rail Schemes  PPP model  Successful Projects  Lessons Learned  Conclusions.
Regina Bypass Project Information Session. Saskatchewan.ca Outline Background –The need for a bypass –Selecting the route –P3 delivery and procurement.
Detroit River International Crossing Project March 31, 2010.
March 8, 2016 Presentation of Item CCW – Solid Waste Management Infrastructure Projects – Final Siting Report.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
CONTEXT-SENSITIVE DESIGN 2002 Texas Department of Transportation Design Conference.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Infrastructure Ontario
Stage 2 Light Rail Transit Program “In the ground ready”
P3s & The P3 Canada Fund Michael Mills VP Investments, PPP Canada
Changes and Benefits brought from Modern Procurement to Bridge the Infrastructure Gap Remo Bucci, P.Eng Infrastructure and Capital Projects October 27,
Indigenous and Northern Affairs Canada Leveraging Infrastructure Funds
Construction Management & Inspection
The Oregon Approach to Innovation in Infrastructure
Issaquah-Fall City Road
Integrated Bilateral Agreement (IBA) 2018 to 2028
A Paradigm for Utility Coordination
Presentation transcript:

Canada-United States Transportation Border Working Group Garfield Dales Manager, Project Delivery Office Windsor Border Initiatives Implementation Group Ministry of Transportation November 8, 2012

Limits of The Windsor-Essex Parkway Bi-national study conducted in Canada and the U.S. Recommended plan for access road, Canadian inspection plaza, bridge crossing, U.S. inspection plaza, Interstate connection. Ontario is leading the delivery of the Windsor-Essex Parkway Ontario and Canada working together to ensure appropriate interface between inspection plaza and Windsor-Essex Parkway

3 Transportation Features: 11 km in length New urban 6 lane freeway New parallel 4 lane service road network Below-grade freeway Full illumination Stormwater management facilities Advanced traffic management system Community and Environmental Features: 11 tunnels covering 1.8 km of freeway More than 300 acres of green space 20 km of recreational trails Noise mitigation measures Extensive landscaping Special measures to protect wildlife Significant Investment: 12,000 project-related jobs anticipated $1.4 B investment

The Parkway and Infrastructure Ontario One of the most significant single highway investments in Ontario’s history First Ontario road project to be delivered under Alternative Financing and Procurement model $1.4 billion – DBFM model with a 30-year concession Procurement process was 18 months beginning June 2009 and ending December 2010 with Financial and Commercial Close The third party value for money assessment of the Windsor-Essex Parkway was positive

5 AFP/P3 Approach - Design-Build-Finance-Maintain Model Infrastructure Ontario and Ministry of Transportation collaboration to ensure successful, on-time/on-budget completion of the Parkway and: –Avoid duplication of expertise and costs. –Ensure effective, timely decision-making. –Encourage Innovation –Transfer project risks to private sector 30-year ‘warranty’ on the Parkway ensures it is kept in excellent working condition and ensures standards are maintained Incentive for private sector to: –Build in quality upfront –Maintain the Parkway in good condition for 30 years Construction payments are made only when sections of the Parkway open to traffic The private sector partner’s obligation to repay lenders on time keeps construction on schedule

6 Procurement Milestones –February 2009Pre-procurement Market Sounding –June 2009Request for Qualifications issued –July 2009International and local contractors meet and greet –October 2009Three teams short-listed –December 2009Short-listed teams and local contractors networking session –December 2009Request for Proposals released to short-listed bidders –August 2010Proposals received from all three short-listed bidders –November 2010Identification of Preferred Proponent –December 2010Commercial/Financial close –August 2011Full construction start

PRIME TEAM MEMBERS Developer – Risk Capital Funders Maintenance and Rehabilitation CONSTRUCTION PRIME TEAM MEMBERS DESIGN PRIME TEAM MEMBERS

The Design Team – Parkway Infrastructure Engineers  design management, highways & roads, structures, pumping stations  municipal roads, urban design/landscaping, traffic staging, utilities, drainage & storm water  geotechnical & pavement design, environmental protection, enhancement & mitigation  electrical works, ATMS/ITS, traffic signals, life safety, security  temporary diversion roads & staging  temporary diversion roads

Construction Partners

Construction Schedule Financial Close December 15, 2010 Start of Construction: Summer 2011 – Phase 1 substantial completion: Summer 2014 – Phase 2 substantial completion: Summer 2014 – Open to traffic: Fall 2014 – Approximately 45 months based on WEMG’s schedule Commercial Close Financial ClosePhase 1 CompletionPhase 2 Completion Phase 3 Completion (Substantial Completion) Project Final Completion JanFebMarAprJunJulAugSepOctNovDecJanFebJunJulSepOctNovMarApr May

11 Property Assembly Over 900 properties were required and the Province assumed portions of municipal roadways Less than 130 properties expropriated Over $270 million invested to date in property acquisition Approximately 340 buildings demolished

12 Pre-construction Activities – Community Benefits Ontario is supporting a three-year University of Windsor research project on the regional impacts of the Parkway and also has partnered with St. Clair College, local emergency services organizations, Walpole Island First Nation and Workforce WindsorEssex, among others. Unique partnerships have been established between the Province and various organizations: –W.E. Pay it Forward

Construction of the Parkway began in August, 2011

Species at Risk work

15 Environmental Protection and Benefits Special care has been taken in the configuration of the Windsor-Essex Parkway. Distinct community and cultural features, such as the Ojibway Prairie Complex have been preserved for generations to come. The Parkway Landscape Plan envisions a green space corridor that integrates and connects with local parks and trails, links other protected natural areas, supports viable natural communities, and buffers surrounding communities from the new freeway. A number of species at risk were identified within the Parkway corridor including: –Colic-root –Common Hop-tree –Dwarf Hackberry –Dense Blazing Star –Kentucky Coffee-tree –Willowleaf Aster –Butler’s Gartersnake –Eastern Foxsnake –Eastern Prairie Fringed Orchid –Red Mulberry Permits received under the Endangered Species Act, 2007

Construction includes 12 temporary diversion roads to carry traffic around construction. Eight diversions totalling 26 lane kms have opened this year

10 tunnels are under construction

Six bridges are under construction

Retained Soil System Walls

New multi-lane roundabout

22 Extensive use of Social Media

Economic Impact Estimated 12,000 project related jobs $1.4 Billion investment in Windsor-Essex Over 3200 people trained to work on the project to date. Improved transportation network

Learn more – – Follow us on Twitter – Like us on Facebook – View photos – View video –