Section 2 Capital Project Life Cycle. PROJECT PHASES Project development تطوير المشروع Turn Over التسليم والضمان Detailed design التصميم التفصيلي Preliminary.

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
Construction Contracting
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Effectively Integrating Information Technology (IT) Security into the Acquisition Process Section 4: Effective Integration.
Getting The Theory Down to Earth Project Plan Dubai September 2007.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
ClosingExecuting/ Controlling ControllingPlanningInitiatingOpportunityAssessment Client AcceptancePlanning ApprovalInitiating ApprovalOpportunity Assessment.
EMIS Chapter 6. EMIS Chapter 6 EMIS Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an.
Systems Engineering Management
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Project Execution.
Project Management Lecture 5+6 MS Saba Sahar.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
SUPPORT MATERIAL The NDP Operations Guide is a tool to assist Municipalities to comply with NDPG operational procedures. The Guide provides quick guidance.
Project Management Process Overview
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Standards of Practice Course
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Software Engineering Chapter 15 Construction Leads to Initial Operational Capability Fall 2001.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Closing Out a Federal Aid Construction Project Missouri Local Programs How to Close-Out a Federal Aid Construction Project.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
Topic1b: Project Life Cycle
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Project Life Cycle.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Agency Construction Management :CM NOT AT-RISK
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
Milestone Meeting Milestone Meeting Client Activity / Task Client Activity / Task Design For Health Activity / Task Design For Health Activity / Task Document.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
P r o j e c t : from INITIATING to CLOSING ( 1 ).
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
BI-19 Process Improvement Sea Water Injection Department.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
McDonough Bolyard Peck 1 CEFPI’s 81’st Annual International Conference PROJECT QUALITY MANAGEMENT by Edward M. Kopp and James Yatzeck.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
November 12, 2009 PM Process Improvement Plan: Employee Presentation.
1 Punch list / Close Out - Project Completion Best Practices May 2016.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
Rob Connatser NSS Instrument Work Packages and XLPM.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Camera PDR/CD1 Planning 19 September 2008
CONTRACT DOCUMENTS & CONSTRUCTION
Tracking time spent here with us today WO# Task code: 886
Punch list / Close Out - Project Completion
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Safety and Security- From Assessment to Implementation
EMIS 7307 Chapter 6.
Instrument PDR Summary of Objectives
Controlling Project Cost and Schedule
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
BI-19 Process Improvement
Value Engineering In Design
Presentation transcript:

Section 2 Capital Project Life Cycle

PROJECT PHASES Project development تطوير المشروع Turn Over التسليم والضمان Detailed design التصميم التفصيلي Preliminary design التصميم الأولى Construction التشييد

Phase 1 ENTRY CRITERIA TO PHASE 1 Signed & Approved Project Charter approved budget EXIT CRITERIA TO PHASE 2 Baseline Schedule Baseline Costs Baseline Resources Risk Management Plan Project Management Communication Plan Engineering Studies SOW/RFP for Preliminary Design Feasibility Study & Enviromental Assessment completed & Accepted

Phase 2 ENTRY CRITERIA TO PHASE 2 Baseline Schedule Baseline Costs Baseline Resources Risk management Plan Project Management Communication Plan Engineering Studies SOW/RFP for Preliminary Design Feasibility Study and EA Completed & Accepted EXIT CRITERIA TO PHASE 3 Preliminary Design Report (PDR) and Design or Design Build SOW Current Schedule Current Costs, Budget, & Resources Risk Management Plan (updated) Project management Communication Plan (updated) Review comments on PDR from Project Team Incorporated Real Estate Confirmed

Phase 3 ENTRY CRITERIA TO PHASE 3 Preliminary Design Report (PDR) and Design or Design Build SOW Current Schedule Current Costs, Budget, & Resources Risk Management Plan (updated) Project management Communication Plan (updated) Review comments on PDR from Project Team Incorporated Real Estate Confirmed EXIT CRITERIA TO PHASE 4 Final Design Submittal Bid Documents Ready To Issue for CM Consultant & Construction Contractor Final Estimate of the Cost of Construction Management & Construction All Land Acquisition completed Affirmation of Project Milestones

Phase 4 ENTRY CRITERIA TO PHASE 4 EXIT CRITERIA TO PHASE 5 Final Design Submittal Bid Documents Ready To Issue Final Estimate of the Cost of Construction All Land Acquisition completed Affirmation of Project Milestones Punch List Completed Commissioning Team in Place & Functional Commissioning Plan Ready to Implement Risk Management Plan Updated Project Communication Plan Updated

Phase 5 ENTRY CRITERIA TO PHASE 5 EXIT CRITERIA FROM PHASE 5 Punch List Completed Commissioning Team in Place & Functional Commissioning Plan Ready to Implement Risk Management Plan Updated Project Communication Plan Updated Reliability Test Report Accepted Final O & M Manuals Delivered & Accepted Training Completed Warranty Work Completed Record Drawings Completed & Received All Close-out items Received All Claims & Disputes Resolved Project Completion Report Submitted & Approved Final Invoice Submitted, Approved, & Paid