February 26, 2015 and March 26, 2015 TAC Meeting Update to COPS Michelle Trenary, April 15, 2015.

Slides:



Advertisements
Similar presentations
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
Advertisements

March 30, 2015 Report Discontinuance Tracking - MISUG.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
Retail Market Subcommittee Update to TAC Kathy Scott April 24,
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
1 Profiling Working Group Update to COPS April 15, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Commercial Operations Subcommittee (COPS) January 2014 Update to TAC 1/29/2015.
1 Impact Assessment of Parking Deck NPRRs/SCRs/NOGRRs Phase 1 March 2011.
1 Impact Assessment of Parking Deck and New NPRRs/SCRs Phase 1 February 2011.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
March 7, 2013 Technical Advisory Committee (TAC) meeting update to RMS Kathy Scott March 20, 2013TAC Update to RMS 1.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
TAC Meeting Update. Board Update and TAC Voting Item Kenan Ogelman, Vice Chair of TAC gave the Board Update. It included recommendation that TAC.
1 Profiling Working Group 2014 Accomplishments & 2015 Goals.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
September 24, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 6, 2015 TAC Update to RMS 1.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
1 TAC Report to the ERCOT Board February 16, 2005.
COPS NOVEMBER 2014 UPDATE TO TAC 11/20/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
Distributed Renewable Generation Profile Implementation Plan.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
September 25 and October 23, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 28, 2014 TAC Update to RMS 1.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public December 16, 2015.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 16, 2007.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
TAC 2012 Meetings Update (March & April) to Commercial Operations Subcommittee Harika Basaran 5/8/2012.
COPS SEPTEMBER 2014 UPDATE TO TAC 9/25/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
May 28, 2015 and June 30, 2015 Information Session TAC Meeting Update to COPS Michelle Trenary, July 15, 2015.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public May 18, 2016.
Commercial Operations Subcommittee (COPS) 4/15/2015 Update to RMS 5/5/2015.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
August 25, 2016 TAC Update to COPS
Initial ERCOT Parking Deck Prioritization Recommendation
Profiling Working Group
Initial ERCOT Parking Deck Prioritization Recommendation
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
Presentation transcript:

February 26, 2015 and March 26, 2015 TAC Meeting Update to COPS Michelle Trenary, April 15, 2015

TAC Other 2 TAC Procedures Amendment Approved Allows ERCOT CEO to designate a temporary substitute for the ERCOT COO’s ex-officio, non-voting member seat on the TAC 2015 TAC Goals and Strategic Initiatives Approved See Appendix A for 2015 TAC Goals See Appendix B for 2015 TAC Strategic Initiatives

PRS Report (Feb) 3 NPRR654, NPRR655, NPRR657, and NPRR661, Effective Date: Upon system implementation Approved Discontinuation of the following reports: o NPRR654 - Ancillary Service Requirement Methodology Assessment o NPRR655 - Contingency List Changes Due to Weather o NPRR657 - Backup Control Plan Submittal Results, Dispatch Instructions Compliance Metrics, and Backup Control Plan Test Dates and Results Summary o NPRR661 - Profile Data Evaluation NPRR668, Updates to TX SET Implementation Guide, Effective Date: TBD Tabled at TAC NPRR676, ERS Offer Disclosure, Effective Date: Upon system implementation Approved with ERCOT Comments NPRR677, Remove Outdated NERC Reference, Effective Date: May 1, 2015 Approved NPRR642, Constraint Management During EEAs, Effective Date: TBD Remains tabled at TAC NOGRR136, Verifying QSE Capability to Operate in Constant Frequency Control (CFC), Effective Date: March 2015 Approved

PRS Report (Mar) PRS Goals Approved Annual Review of Other Binding Documents (OBDs) Approved NPRR642, Constraint Management During Energy Emergency Alerts (EEA), Effective Date: May 1, 2015 Approved NPRR668, Updates to Texas SET Implementation Guide Process, Effective Date: TBD Remains tabled at TAC NPRR670, Clarification of Portfolio Weighted Auction Clearing Price (PWACP), Effective Date: May 1, 2015 Approved NPRR671,Incorporation of DAM Credit Parameters, Effective Date: May 1, 2015 Approved NPRR672, Clarification of EMR Status, Effective Date: June 1, 2015 Approved NPRR673, Correction to Estimated Aggregate Liability (EAL) for a QSE that Represents Neither Load nor Generation, Effective Date: May 1, 2015 Approved LPGRR054, Alignment with NPRR661, Discontinue Posting Profile Data Evaluation, Effective Date: Upon system implementation Approved

ROS Report (Feb) 5 New Outage Coordination Task Force – This new Task Force will take up NPRR219, Resolution of Alignment Items A33, A92, A106, and A150 – TSPs Must Submit Outages for Resource Owned Equipment and Clarification in Status of Transmission Element Postings Harmonization between NERC Standards and ERCOT Testing Requirements TAC assignment to ROS NOGRR132, Automatic Under-Voltage and Under- Frequency Load Shedding Protection Systems – Load Restoration, Effective Date: March 1, 2015 Approved

ROS Report (Mar) ROS Goals Approved NOGRR135, Constraint Management During Energy Emergency Alert (EEA), Effective Date: TBD Tabled at TAC NOGRR138, Delete Grey Box for Reporting of Back-up Control Plan Submittal, Effective Date: TBD Tabled at TAC NOGRR139, Under/Over-Frequency Relaying Requirements, Effective Date: April 1, 2015 Approved PGRR041, Revise and Add Requirements for NERC TPL , Transmission Planning Performance Requirement, Effective Date: May 1, 2015 Approved

WMS Report (Feb) 7 NPRR638, Revisions to Certain Price Components of Estimated Aggregate Liability (EAL) Tabled at PRS MCWG is working with ERCOT staff to gain insight into the potential impacts of NPRR638. ERCOT would like implementation prior to summer No change to 2015 DAM Collateral Parameters Recommended by WMS Approved Nodal Protocol Section requires DAM Collateral Parameters, including Price Percentile, ‘e’ Factors, Real-Time- Day-Ahead (RT-DA) spread (currently 90%), PTP Obligation Discount (currently 90%), to be reviewed at least annually.

WMS Report (Mar) WMS Goals Approved VCMRR006, Fuel Adder Timeline Update, Effective Date: April 1, 2015 Approved

COPS Report (Feb) 9 LPGRR054, Alignment with NPRR661, Effective Date: Upon system implementation Tabled at TAC Load Profiling Guide: Why is it still needed? A TAC Member asked this question and COPS should provide a thorough answer to educate TAC Members Assigned to PWG Create the Process for a Reduction in the Unregistered DG Threshold Assigned to CSWG o Why is this needed? o What Market Participants are impacted? o What Market Participant is responsible for communication? o How is it communicated? o Are current DGs under 1 MW grandfathered? o Are there settlement impacts? o Does there need to be coordination with the PUC?

COPS Report (Mar) COPS Goals Approved Load Profiling Guide: Why is it still needed? In response to a question, the following list of list of reasons the LPG is still needed was presented. o Non-AMS ESI IDs – Need to have documentation of the rules which govern them o AMS Data Gaps - Communication failures result in TDSPs relying on load profiles to estimate interval consumption o Load Forecasting – By ERCOT and REPs o Procurement – Allows for hedging strategies; Grouping of “classes” of customers o Pricing – REPs’ pricing systems may not yet be capable of utilizing AMS interval data during the price quotation process, so they utilize load profiles to accurately quote a customer a commodity price o Settlement – During the time an AMS meter is provisioned, prior to the AMS Settlement flag being activated (up to 30 days), an ESI ID is settled in the market based on their load profile o Marketing Efforts – Load profiles allow for segmenting / targeting groups of customers

ERCOT Reports (Mar) 11 Ancillary Services Redesign Update o Another FAS Workshop to further discuss “Procurement and Pricing (P&P) Options” for NPRR667, Ancillary Services Redesign – April 20, 2015 o ERCOT is planning to begin monthly Synchronous Inertial Response Service “working group” meetings – April 20, 2015 o Cost Benefit Analysis target completion date for the final report is mid-June 2015 and the Battle Group plans to present and answer questions in person at a future FAS CBA meeting Annual ERS Report o The ERCOT Annual Emergency Response Service (ERS) report was included in the TAC Meeting Materials

ERCOT Reports (Mar) Cont. 12 LCRA Transmission Services Corp (TSC) and CPS Energy Transmission System Addition RPG Project Endorsed by TAC o Several 345 kV and 138 kV lines supporting the San Antonio system and the existing 345/138 kV transformers serving the area load are vulnerable to thermal overloads under various contingency condition by 2019 o The recommended project will address the reliability need at an estimated cost of approximately $86 million in 2019 dollars; Will go to the Board for approval Seasonal Adjustment Factor (SAF) o CWG/MCWG voted for the 2015 SAF factors as follows o ERCOT staff agreed with the CWG/MCWG Recommendation

Appendix A TAC Goals 1.Align TAC and Subcommittee Goals with the ERCOT Board of Directors’ strategic vision to work with ERCOT Staff to achieve the Board’s vision for ERCOT. 2.Maintain market rules that support ERCOT system reliability and are consistent with PURA, PUC, and NERC Reliability Standards. 3.Monitor resource adequacy and make improvements as necessary. 4.Collaborate with ERCOT Staff on current trends in fuel prices and installed resource costs through market changes. 5.Develop and implement needed market design corrections and improvements which are cost effective. 6.Pursue the appropriate implementation of load participation. 7.Pursue the appropriate implementation of emerging technologies. 8.Implement Retail Market improvements and requirements. 9.Facilitate market improvements necessary to leverage the capabilities of Advanced Metering Systems (AMS) in the retail market. 10.Improve settlement processes to facilitate changes in the ERCOT market design. 11.Collaborate with ERCOT Staff on the review of ancillary service needs and implement changes as necessary. 12.Maintain market rules that support open access to the ERCOT markets and transmission network. 13.Work with ERCOT Staff to develop Protocols and market improvements that support increased data transparency and data availability to the market. 14.Work with ERCOT Staff to ensure appropriate credit and collateral rules exist or are created to facilitate market changes.

Appendix B TAC Strategic Initiatives and Assignments Sub-synchronous Oscillation (SSO) – ROS Loads in SCED Part 2 – WMS Outage Coordination Improvements – ROS Switchable Generation – WMS Distributed Energy Resources – WMS Real-Time Co-optimization – WMS Multi-Interval Real-Time Market – WMS Future Ancillary Services – TAC Smart Meter Texas – RMS Review of Planning Processes – ROS Implementation of Outage Scheduler Revisions (NPRR219 and SCR783) – ERCOT