Characterizing Exoplanets: The Challenge. GSMT Potential GSMT will detect & classify Jovian mass planets, from ‘roasters’ to ‘old, cold’ Jupiters located.

Slides:



Advertisements
Similar presentations
Oct.10, 2007EAMA7 Japanese Space Activity on Exoplanets (JAXAs prespective) & Pathways to Habitable Planets September 16, 2009 Takao Nakagawa (ISAS/JAXA)
Advertisements

Spectro-Polarimetric High-contrast Exoplanet Research
TheEuropean Extremely Large Telescope. The E-ELT 40-m class telescope: largest optical- infrared telescope in the world. Segmented primary mirror. Active.
Sarah Kendrew Leiden Instrumentation Group.  One of eight potential instruments for the European ELT, the largest planned optical/IR telescope for the.
MAROON-X: An instrument for identifying another Earth
Directly Imaging and Characterizing Extrasolar Planets at High Contrast Thayne Currie (U. Toronto, NAOJ Aug 2014!) Adam Burrows (Princeton), Nikku Madhusudhan.
Extremely Large Telescopes and Surveys Mark Dickinson, NOAO.
RASC, Victoria, 1/08/06 The Future of Adaptive Optics Instrumentation David Andersen HIA.
Meeting of the Blue Dot Team, UCL, London, sept Single Aperture Concepts.
GTC 2009Jul251 TMT: the next generation of segmented mirror telescopes Jerry Nelson, UCSC GTC Inauguration Seminar 2009 July 25.
Debris Disk Science with GMT Inseok Song, University of Georgia for “Opening New Frontiers with the Giant Magellan Telescope” in Oct 2010 Zodiacal light:
AURA New Initiatives Office S.C. Barden, M. Liang, K.H. Hinkle, C.F.W. Harmer, R.R. Joyce (NOAO/NIO) September 17, 2001 Instrumentation Concepts for the.
TIGER The TIGER Instrument Overview Phil Hinz - PI July 13, 2010.
1 Exosolar Giant Planet Science GSMT vs. JWST Terry Herter February 12, 2004 Based on material from: “Exosolar Planets” by Lunine for GSMT 4/28/03 “Planet.
NGAO Report February 18, 2009 Waimea NGAO Report February 18, 2009 Waimea P. Wizinowich for the NGAO Team.
January 24, 2006Astronomy Chapter 5 Astronomical Instruments How do we learn about objects too far away for spacecraft? How do telescopes work? Do.
The Future of AO at Keck Sept 2004 Mike Brown, for the AOWG and Keck AO team.
DRAFT (12/18/00) AURA’s road map to future 30m - 100m groundbased observatories - entering the “ era of the Giants ” in partnership The New Initiatives.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
W. M. Keck Observatory’s Next Generation Adaptive Optics (NGAO) Facility Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max for NGAO Team:
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
1 The Thirty-Meter Telescope (TMT) Richard Ellis, Steele Professor and California Institute of Technology TMT Board member Michael Bolte, Director, University.
Technology Development for ELTs Steve Strom Terry Herter Doug Simons GSMT SWG April 28, 2003.
The Thirty Meter Telescope Jerry Nelson, UCSC 2005 December 8.
[79.03] The Thirty Meter Telescope (TMT) Project Gary H Sanders for the TMT Project Partnership AAS 205th Meeting, San Diego Providing Access to U.S. Astronomers.
Instruments and Science with TMT Shude Mao. Outline International context Telescope overview and science instruments Some key science areas Summary.
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
W. M. Keck Observatory Subaru Users’ Meeting
Thirty Meter Telescope Astronomy and Astrophysics Advisory Committee Feb 6, 2007 Edward C. Stone.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
Advancing GSMT SWG Recommendations: AURA’s Proposal to the NSF Stephen E. Strom AURA New Initiatives Office Presented to the GSMT SWG 12 February, 2004.
AO4ELT - Paris Giant Magellan Telescope Project Science Drivers & AO Requirements Patrick McCarthy - GMT Director Phil Hinz & Michael Hart - GMT.
1 BDRv3 - November 26, Markus Kissler-Patig E-ELT Programme 1 E-ELT Science Case Markus Kissler-Patig.
SCIENCE GOALS OF EXTREMELY LARGE TELESCOPES Sandro D’Odorico European Southern Observatory RENCONTRES DE MORIOND Contents and Structures of the Universe.
European Extremely Large Telescope - Status April ESO.
MAXAT-II Woods Hole September Overview Science Drivers Lessons of the past Focusing on Science and Innovation.
February 2013 Ground Layer Adaptive Optics (GLAO) Experiment on Mauna Kea Doug Toomey.
TMT.PMO.PRE REL011 Thirty Meter Telescope Background and Status.
Eric Pantin, Jean Schneider, A. Boccaletti, P. Baudoz, R. Galicher, R. Gratton, D. Stam et al. Polarimetry and spectral imaging of mature Jupiter and super-Earth.
ASTR 3010 Lecture 18 Textbook N/A
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
NIO GSMT Overview VLOT/GSMT WORKSHOP Victoria, BC 17 JULY, 2001 S. Strom, L. Stepp.
Australia’s Path to a Giant Telescope Matthew Colless MNRF Symposium 7 June 2003.
WITNESSING PLANET FORMATION WITH ALMA AND THE ELTs GMT TMTE-ELT Lucas Cieza, IfA/U. of Hawaii ABSTRACT: Over the last 15 years, astronomers have discovered.
JTPF Japanese Terrestrial Planet Finder JTPF Japanese Terrestrial Planet Finder M. Tamura (NAOJ) JTPF Working Group TPF-C coronagraph WS :15-15:30.
Technology Development for ELTs Doug Simons GSMT SWG April 28, 2003.
Keck Observatory in the TMT Era Keck Strategic Planning meeting September 18, 2009.
TMT.PSC.PRE REL011 Science with TMT The Power of the Planned Instrument Components GSMT SWG August 10, 2006 Paul Hickson The authors gratefully.
Mega Telescopes of the 21 st Century Evolution in the Ground-Space Synergy Dr. Marc Postman (STScI) & Richard Ellis (Caltech) James Webb Space Telescope.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
1 Comparative Performance of a 30m Groundbased GSMT and a 6.5m (and 4m) NGST NAS Committee of Astronomy & Astrophysics 9 th April 2001 Matt Mountain Gemini.
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
GMT’s Near IR Multiple Object Spectrograph - NIRMOS Daniel Fabricant Center for Astrophysics.
Giant Magellan Telescope Project Status and Relationship with the NSF Astronomy and Astrophysics Advisory Committee February 8, 2007 Patrick McCarthy -
Keck Precision Adaptive Optics Authors: Christopher Neyman 1, Richard Dekany 2, Mitchell Troy 3 and Peter Wizinowich 1. 1 W.M. Keck Observatory, 2 California.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
GSMT SWG Meeting November, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort.
Sample expanded template for one theme: Physics of Galaxy Evolution Mark Dickinson.
Large Binocular Telescope (LBT) In-Sung Jang March, 24 th
Debris Disks - LBTI Phil Hinz University of Arizona.
Next Generation O/IR Telescopes Stephen E. Strom Associate Director GSMT Development NOAO User’s Committee October, 2005.
SCIENTIFIC OPPORTUNITIES OF AO-ASSISTED
The GMT Project The Giant Magellan Telescope (GMT)
[79.03] The Thirty Meter Telescope (TMT) Project
Theme 2 AO for Extremely Large Telescopes
Comparative Performance of a 30m Groundbased GSMT and a 6
Scientific Potential Current Design Efforts Complementarity with JWST
Theme 2 AO for Extremely Large Telescopes
Theme 2 AO for Extremely Large Telescopes
Presentation transcript:

Characterizing Exoplanets: The Challenge

GSMT Potential GSMT will detect & classify Jovian mass planets, from ‘roasters’ to ‘old, cold’ Jupiters located at ~ 5AU for stars at d < 10 pc Via photometry (R ~10) and low resolution spectroscopy (R ~200) Requires star suppression ~ 10 7 Detection of lower mass planets is possible, but star suppression must exceed 10 8 –Characterization via spectroscopy not possible GSMT will detect ‘warm Jupiters’ around t < 10 Myr stars in nearby star-forming regions ( pc)

ELT Projects

ESO OWL 100-m Concept 100m segmented primary Spherical segments NGS AO Find exo-earths Stellar populations to Virgo Design studies underway Major funding after ALMA

Magellan 20 Concept 7x8.4m primary at f/0.7 Possible upgrade path to 20/20 General purpose telescope wide FOV feeding MOS NGS AO MCAO ExAO planet finder Complete by 2014 Partners: Carnegie, Arizona, CfA, MIT, Michigan, Texas, Texas A & M

20-20 Concept 7x8.4m primary at f/ m baseline Detection of exo-earths Other high contrast scenes Magellan 20 + other partners?

TMT Reference Design 30-m segmented primary f/1 Gregorian 10’FOV, kilo-slit MOS Deployable IFUs + imager diffraction-limited 0.05” pixel R ~ 10 5 MIR spectrograph ExAO coronagraph

TMT Status Partnership formed UC, Caltech, Canada, AURA Reference design selected (Oct, 2004) based on CELT, VLOT and NIO/GSMT concepts Design and Development phase underway $70M effort Private funding committed (Moore Foundation) Public funding authorized (Canada; CFI) NSF funding (1/2 x $1M FY05; $2M FY06; ramp up in FY07) Site evaluation underway Conceptual Design Review: Spring, 2006 Cost review: Fall, 2006

TMT First Light Instruments Instrumentation priorities; requirements set by TMT SAC –Includes one representative from the community; 2 planned NFIRAOS - facility AO system delivering narrow-field AO images (1-2.5  m; 5  m goal) –7 LGS constellation; deliver Strehl 0.7 images at K over 10” Upgrade to 30” FOV by adding DMs –Feeds IRIS; NIRES; WIRC (see below) IRIS - IFU spectrograph/imager (1-2.5  m; 5  m goal) MIRES - R ~ 10 5 spectrograph (5-30  m) WFOS - kiloslit wide-field optical spectrograph

Lenslet Optics AO Focus Reimaging Collimators Filters Reimaging Cameras Fold Mirror & Lenslet Array Spectrograph Collimator Mirrors (TMA) Grating Fold Mirror Spectrograph Camera Mirrors (TMA) Detector IRIS: UCLA led collaboration

Image Slicer Fiber Bundle Lenslet Array Focal Plane Feed to Spectrograph Detector Deconstructing Forming Galaxies at 7 mas resolution

MIRES (UH; NOAO; UCD; Texas) Echelon is ~1 m long

Planet Formation Environments 0.1 AU ~1000 K 1 AU ~200 K 10 AU ~50 K H 2 O ro-vib CO  v=2 CO  v=1 H 2 UV, NIR, MIR OH  v=1 Study gas dissipation timescale: constrains pathways for giant planet formation, terrestrial planet architectures Studying gas in disks: (thermal)

TMT Gen II Instruments HROS - R ~70,000 optical spectrograph IRMOS - deployable IFU IR spectrograph WIRC - wide-field IR camera (MCAO) NIRES - near-IR Echelle (R ~ 70,000) PFI - ExAO imager ( contrast)

Metal-poor Stars with HROS The nucleosynthetic “fingerprints” of Pop III stars, and the rare-earth elements produced in SN explosions are best observed at visible wavelengths. R>30,000 required for reliable measurements of abundances even for very metal-poor stars. Need TMT to be able to push out to other galaxies in the Local Group. HROS spectra of metal-poor stars

U Colorado HROS Concept

PFI Science Missions Science roleStar H magnitude DistanceAngular separation Contrast Very young planetary systems (1-10 Myr) pc ” (5 AU) Planetary census pc>0.05” (1 20 pc) Planetary R=1000 spectroscopy pc>0.1”10 -7 Circumstellar debris and zodiacal dust pc>0.05” (0.5 pc) polarimetry

TMT Operations Model Plan for queue and classical operation Invest in end-to-end system that envisions –Data reduction by PI and teams – Extensive post-proprietary period mining of archives populated by well characterized data Community participation via –Classical or queue PI-mode observing –Planning and executing Legacy surveys Community input needed –Desired operations modes –Mechanism for carrying out precursor/planning observations

Site Evaluation

GSMT Site Evaluation NIO is involved in testing multiple sites: –Las Campanas –Three Chilean Sites –Mauna Kea ELT site –San Pedro Martir Status: –Remote sensing studies (cloud cover; water vapor) nearly complete MK / US / Chile comparison to finish in August –CFD modeling of sites: good progress on first three sites –Weather stations deployed on several mountains –Multi-Aperture Scintillation Sensor (MASS) Measure turbulence profile above site In combination with DIMM, quantify contribution of ground-layer

Remote Sensing Survey of Cloud Cover and PWV Survey uses meteorological satellite images Long time baseline Well-defined methodology provides: –Photometric, spectroscopic, unsuitable conditions based on cloud cover –Precipitable water vapor above the sites Dispassionate comparison thus possible Areas studied: –Northern Chile –SW USA-Mexico –Mauna Kea – Chile comparison

Computational Fluid Dynamics Characterize wind flow allowed pre-selection of sites –Wind intensity –Turbulence characteristics –Down-wind wakes Characterization of all candidate sites now completed

Weather Station

Combining MASS + DIMM Results Free atmosphere seeing steady at ~ 0.25” for 4 nights

Advancing US ELT Efforts

AURA goals: –Ensure availability of ELT(s) early in the JWST era –Ensure broad community access –Provide a community voice in shaping ELT designs

AURA’s Approach Goal: –Advance the design of TMT and GMT so that performance, cost, schedule and risk of differing approaches can be assessed Provide $17.5M for TMT partnership –NSF dollars leveraged 3:1 Provide comparable funds for GMT –Include funds for instrument concepts; technology –Program will be open to the entire US community

Investment in TMT Responds directly to AASC recommendations The community will receive observing time in proportion to the public investment AURA is represented at all levels in the project –The community has a ‘seat at the table’ throughout the Design and Development Phase TMT Partners committed to engaging the community –Involve US and Canadian communities in instrument design –Involve US community members in the TMT SAC

Advantages of AURA’s Approach Directly responsive to SWG recommendations –Will fund two ELT programs: GMT and TMT US community is engaged in ELT efforts and will receive time in proportion to federal investment in all ELTs Open dialog between projects benefits all and leaves open a ‘convergence path’ Technology investment in ELT programs will result in significant gains for existing telescopes Initial NSF funds received ($1M for FY05; $3M in FY06) Ramp up in FY 07

NIO Roles Design M2 and M3 support and control system Design Laser launch facility Manage site evaluation process Develop observatory requirements document Provide engineering support: CFD; opto- mechanical design Design MIRES (UH-NOAO collaboration)