Jelena Knežević National Coordinator for CAMP Montenegro March 2012 COASTAL AREA MANAGEMENT PROGRAMME OF MONTENEGRO - CAMP MNE Inception Report.

Slides:



Advertisements
Similar presentations
Towards a Culture of Disaster Prevention and Risk Management Andean Programme for the Prevention and Mitigation of Disasters.
Advertisements

BlackSea Region Meeting Varna National Reports on Spatial Planning for Coastal Zones and Maritimes Areas Terms of Reference.
ICZM and MSP in the Black Sea Region Drd. Claudia Coman, Environmental engineer AG ICZM Focal Point, Romania Black Sea Commission PlanCoast Conference.
Maritime Spatial Planning Angela Schultz-Zehden PlanCoast Coordinator sustainable projects.
Maria Romani Final Meeting Meeting Ravenna 27 March 2008 Lessons learned from the Emilia-Romagna Pilot Project (WP4): PROPOSAL OF SPATIAL PLAN ACCORDING.
GREEN PAPER on Maritime Policy - PlanCoast Statement 2nd PlanCoast Meeting Constanta EU GREEN PAPER ON MARITIME POLICY.
European Social Fund Evaluation in Italy Stefano Volpi Roma, 03 maggio 2011 Isfol Esf Evaluation Unit Human Resources Policies Evaluation Area Rome, Corso.
Inita Paulovica Deputy Resident Representative Turkmenistan.
Implementation of Capacity Development for CDM Project in Viet Nam Nguyen Khac Hieu Climate Change Coordinator Vietnam National Office for Climate Change.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
MED PROGRAMME main thematic priorities and opportunities.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
ICZM in Europe Anne Burrill
Key Elements of Legislation For Disaster Risk Reduction Second Meeting of Asian Advisory Group of Parliamentarians for DRR 5-7 February, 2014, Vientiane,
Strategic Partnership For The Mediterranean Brief overview of the Regional Component of the project and the current status of its implementation.
Project Implementation Plan and Principal Activities
UNCTAD ICT and E-Business Branch 9/17/2015 / 1 Joint UNCTAD-ITU-UNESCAP Workshop Information Society Measurements in Asia-Pacific Bangkok, July 2006.
Project Overview, Objectives, Components and Targeted Outcomes
PHOTO BY: Boštjan Mljač Marine litter (macro & micro) assessment in the Adriatic Sea: Paving the way for harmonized monitoring to facilitate effective.
First report on preparation ICZM Strategy for Montenegro Saša Karajović, spatial planner team member for CAMP MNE.
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
Analysis of ICZM practice in the Adriatic region - Outline
Proposed plan to implement Capacity Development for CDM project in the forthcoming period Dr. DAO DUC TUAN Eng. NGUYEN KHAC HIEU National Office for Climate.
Jelena Knežević National Coordinator for CAMP Montenegro March 2012 COASTAL AREA MANAGEMENT PROGRAMME OF MONTENEGRO - CAMP MNE HORIZONTAL ACTIVITIES.
Ministry of Regional Development and Public works Global Environment Facility United Nations Development Programme Integrating Global Environmental Issues.
Kavala Workshop 1-2 June 2006 Legal protection of Transitional Waters [in the Cadses area]: A comparative analysis Dr. Petros Patronos / Dr. Liliana Maslarova.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
UNDP-GEF Dnipro Basin Environment Programme1. 2 Dnipro basin map.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
New Policy Measures Marko PREM Deputy Director. What policy? Governmental:  (1) Basic principles by which a government is guided.  (2) Declared objectives.
Third Regional Steering Committee Meeting, Palau, 30 th July -3 rd August 2012 GEF Pacific IWRM Project Status Report.
THE REGIONAL ENVIRONMENTAL CENTER for Central and Eastern Europe Integrated planning and Assessment of National Development Plan of the Czech Republic.
The partnership principle and the European Code of Conduct on Partnership.
The UNEP GEF “Strategic Partnership for the Mediterranean Sea Large Marine Ecosystem” Albania, Algeria, Bosnia and Herzegovina, Croatia, Egypt, Lebanon,
CAPACITY DEVELOPMENT FOR CDM IN VIET NAM Presented by Nguyen Mong Cuong Project CD4CDM - Viet Nam Outline  Overview of project  Project activities and.
Kiev + 1 Conference 22 October Tbilisi, Georgia RECs Partnership Regional Environmental Centres: Central Asian REC REC Caucasus REC for Central.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
1 Possible elements for the EGTT future programme of work on technologies for adaptation Mr. Jukka Uosukainen Chair Expert Group on Technology Transfer.
The Strategic Partnership for the Mediterranean Sea Large Marine Ecosystem (MedPartnership) Zagreb, Croatia Regional Workshop on harmonizing the national.
The Male’ Declaration Proposal for Phase 4 Implementation.
ICZM PROTOCOL INDICATORS THE MEDITERRANEAN PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT: What indicators are needed? Marko PREM Director a.i.
ICZM Policies in the Mediterranean
ICZM Guidelines for Dubrovnik-Neretva County. Regional MedPartnership workshop on harmonising the national legal and institutional framework with the.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
Issues from the CDM Institutional Reviews CDM Dialogue, Barbados March 2006 Ian C King Project Manager, UNDP CRMI.
Vision, overview of objectives and expected results.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems Malta, 27 January 2004 Alan Edwards EUROPEAN COMMISSION GMES – Implications.
Strategic Partnership for the Mediterranean Sea Large Marine Ecosystem Paul Mifsud UNEP/MAP Coordinator GEF 3 rd IWC - UNEP Session 24 th June, 2005.
African Centre for Statistics United Nations Economic Commission for Africa Session 2 How to meeting countries needs: What has been done and way forward.
Dr. Vladimir Mamaev UNDP Regional Technical Advisor Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation.
INTRODUCING INTEGRATED WATER RESOURCE MANAGEMENT IN THE ANDEAN STATES
GEF governance reforms to enhance effectiveness and civil society engagement Faizal Parish GEC, Central Focal Point , GEF NGO Network GEF-NGO Consultation.
Marine Strategy Framework Directive (MSFD)
Project Coordination Group (PCG) for the implementation of the MSFD
Ivica Trumbic UNEP/MAP Priority Actions Programme
UNDP-UNEP POVERTY & ENVIRONMENT INITIATIVE (PEI): MID-TERM REVIEW
Workshop with the 8 PAF related Proposals & the Habitats Committee
Follow us: June 15-16, 2017 Steering Committee Meeting Summary of Conclusions and Action Items Follow.
Water Directors meeting
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
13th Meeting of the Working Group on Economic
EU Marine Strategy DG Environment B.1.
Information on projects
A Sea for Life MSFD related projects under Integrated Maritime Policy
Meeting of PAP/RAC Focal Points, Split, Croatia, 8-9 May 2019
Common Regional Framework (CRF) for ICZM: Introduction
© Fresh Thoughts Consulting
Presentation transcript:

Jelena Knežević National Coordinator for CAMP Montenegro March 2012 COASTAL AREA MANAGEMENT PROGRAMME OF MONTENEGRO - CAMP MNE Inception Report

Decision to start up CAMP MNE Initial steps: 14th Ordinary Meeting, 2005 Decision to start CAMP MNE: 18 – 19. December 2006 The Feasibility Study was prepared in the period December 2007 – May 2008 Draft CAMP Project Agreement: February 2011, adjusted in Spring 2011 CAMP Agreement is signed on 30 May 2011

General Objectives of CAMP MNE -mechanisms to achieve SD of the coastal area -support for the implementation of national policies and ICZM Protocol -promotion of integrated and participatory planning and management in the coastal area -development of national and local capacities for ICZM and awareness raising -transfer of knowledge on ICZM tools and approaches

Project Area territories of six coastal municipalities with the total surface of 1,591 km 2 internal waters and territorial sea with the surface of around 2,500 km 2

Main problems Complex institutional and legal frameworks, non clear definedcompetencies, lack of co- ordination Integrated or ecosystem-based approaches are not at the core of the planning system; sectoral approaches are still prevalent Capacity for the application of ICZM tools and mechanisms is limited Strong pressures on coastal environment Harmonisation of national and local level spatial plans;integration of ICZM Protocol requirements into the spatial plans Valuable marine and terrestrial ecosystems and cultural heritage are threatened by the current and planned development Pollution from land-based sources and maritime activities needs to be prevented/ controlled more efficiently

Project objectives Specific objectives to create necessary mechanisms that can help achieve SD of the coastal area to support implementation of national policies and ICZM Protocol to promote integrated and participatory planning and management in the coastal area to build national and local capacities for ICZM and raise awareness to facilitate the transfer of knowledge on ICZM tools and approaches. Overall Objective: support, facilitate and propagate efforts towards integrated management in the project area to provide for environmental protection and sustainable development

Inception Conference Inception Report details project objectives strategy and phasing describes project structure, institutional arrangment and staffing specifies expected results and outcomes of the project specifies methodologies and tools to be applied, the work plan and timetable for each activity, alongside with monitoring procedures entails ToRs for specific horizontal and individual activities

CAMP is linked with CASP and GEF MED Partnership`s projects The CAMP activities are defined as to provide support in fulfilling expertise needs of CASP MNE, while full exchange of information and integration of results is provided with TBP Buna/ Bojana New CASP of Montenegro development Transboundary (Albania and Montenegro) project on integrated management of the Buna/ Bojana basin, coastal area and aquifers NS ICZM 2 projects with support of GEF MED Partnership

Other projects and initiatives related to CAMP ADRICOSM Intermediate Project MPA 2 Project on the revision of the status of selected CP areas MED PAN project on developme nt of MPA s and CPAs GRECO Initiative

Project structure CAMP activities as they were presented in the Agreement are broken down in two major components with a set of activities and sub-activities: A Horizontal activities B Individual activities

Horizontal activities Project co-ordination, integration and dissemination of results Training / capacity building Public participation and awareness raising

Individual activities Support for the ICZM Strategy/Plan and Coastal Area Spatial Plan (CASP) of Montenegro 1.1 Analysis of implications of the ICZM Protocol for spatial planning1.2 Preparation of sectoral baseline studies of selected coastal subsystems1.3 Coastal vulnerability, attractiveness and suitability assessment 1.4 Inputs for coastal carrying capacity, especially regarding the capacities in the sector of tourism development 1.5 Recommendations to strengthen beach management system in Montenegro 1.6 Contribution to coastal GIS database with indicators as a core future coastal monitoring observatory

Individual activities 2.1.Proposal of the ICZM institutional-legislative framework setup in coastal zone of Montenegro 2.2.Recommendations for selected ICZM measures, including coastal setback elaboration with rules of its implementation/adaptation 2.3.Facilitating implementation of ICZM Protocol principles in final CASP and SEA formulation 2.ICZM framework setup 3.Realization of the pilot project on testing the ecosystem approach (ECAP) application in Boka Kotorska Bay by making the special reference to nutrient inputs from diffuse sources, ecosystem valuation and green entrepreneurship

Expected outputs of the CAMP ICZM plan with NS ICZM for the project area Building blocks for future institutional arrangements for ICZM and support to possible changes in the legislative framework Analysis of implications of the ICZM Protocol for spatial planning system, including recommendations for necessary revision of the existing spatial planning policies and documents to incorporate the ICZM methods, concepts and tools and assistance with their application in the process of CASP development Delivered trainings and increased capacity of all the stakeholders, especially the local level onesRaised awareness on coastal processes and integrated management

Expected outputs of the CAMP Coastal studies (with GIS maps) including: Suitability Assessment Analysis Study of biodiversity and nature protection Study for hydrology, hydrogeology and water quality Natural risks analyse Targeted socio-economic analysis Coastal GIS The methodology for carrying capacity, especially regarding the capacities in the sector of tourism development Recommendations to strengthen beach management system in Montenegro SEA Study for ICZM PlanInception ReportFinal Integrated Project Document and proposal for follow-up activities

Linking ICZM Plan with NS ICZM In accordance with the analyses and objectives that will be defined in NS ICZM Priority themes and area of action will be further elaborated in ICZM Plan by defining: measures timeframe responsibilities for implementation indicators means for implementation for any themes and area of action

Project stuffing MAP component  MAP Project Co-ordinator –PAP/RAC  SPA/RAC Team Leader  CP/RAC Team Leader  MEDPOL Team Leader National component  National Project Co-ordinator – MSDT  Project Assistants  Administrative support –UNDP Montenegro National Project Steering Committee National Project Advisory Board National Team Leaders and team members Task Force Groups

CAMP Montenegro Work Plan and TimetableStartFinish Detailed formulation of the projectDecember 2011May 2012 Inception ReportDecember 2011March 2012 Inception ConferenceMarch 2012 Meeting prerequisites for implementationDecember 2011May 2012 ImplementationSeptember 2011December 2013 Initial Activities -Technical SpecificationsJanuary 2012April ToR for consultantsMarch 2012June2012 -Signature of consultants contractsThroughout the project Implementation of individual project activitiesMay 2012September 2013 Integration of resultsOctober 2013March Final integrated project documentsJanuary 2014March PresentationDecember Terminal reportFebruary 2014March 2014 Post project activitiesDecember 2013December Follow up activities (host country)January 2014January Monitoring, evaluation, reporting (host country)January 2014January Presentation of project results at MAP level (MAP-PAP/RAC)January 2014January 2016